Post Job Free
Sign in

Electrical Engineer Safety Manager

Location:
Manhattan, NY, 10007
Posted:
October 25, 2022

Contact this candidate

Resume:

*

Andre Bergman

Electrical Engineer

Total Professional Experience 24+ years, IBEW Member, NYC Super’s Licences, ASSE Member Mr. Bergman has over twenty two (24) years of experience within the electrical/mechanical construction industry. Aware of use and knowledge of testing wires, aware of voltages, and tel/data communications, and Fiber Networks, Routers. He is a results oriented management site safety manager & electrical engineer for all Metropolitan Transit Authority TBTA Construction Structured Horizontal/Vertical Cable Steel on White Stone Bridge and Tunnels: DOT and DEP projects, Bowery Bay (Framen Mechanical) etc. He oversees all phases of multimillion dollar construction, infrastructure, superfund and Electrical Environmental projects for government and private sector clients. Mr. Bergman experience providing Tool Box Topics, & Check Lists. Electrical full knowledge a Plus. He was the MTA TBTA Safety & Air Monitor Electrical Inspector for Judlau at the White Stone Bridge and TBTA Triboro Tunnels overseeing the workers for a 3.1 billion dollar project, and Catch Basin Clean Outs. He was also a DOT Asbestos & Environmental Inspector responsible for overseeing the Health and Safety of the Private Bridge cleaning contractors and DOT Bridge & Highway, Ahearn painters for a 3.2 million dollar project. He has sound working knowledge of the railroad and in depth safety and right of way experience working on the LIRR 2nd track and MTA 2nd ave tunnel. He has a ton of experience with Audits, and Site Experience & knowledge.

EXPERIENCE: 11/2018 to Present

NYCT MTA, Contract Engineer

Project: NYC, NY

Overview of Electrical Data Project Job Scope, & Meetings

Progress Site Meetings attendance, APP & SWP’s, Phase Out’s Electrical Data Switches

Competence Person Training of workers JHA, & SWP’s, examine correct safety hazards.

Sites visit of material deliveries, installs, and testing’s.

Electrical Survey Schematic & Purchase of Switch, ASCO, and Electrical Superintendent 08/2017 to Present

NYC Buildings Dept License Super’s Certification, License Project: NYC, NY

Monitor Electrical Project Permits are up to date.

Verify Safety Compliance is up to requirements with Equipment

Inspect workers are using approved protection gear and examine project sites to spot and correct any electrical safety hazards, & compliance of required regulations.

Audit sites and do daily inspections of entire jobsite and oversight of workers. Electrical Safety Manager 08/2017 - Present

Infinite Consulting Corp., Hicksville, NY

Project: NYCDEP Project 542B, LIRR Track, CSI 26 Stations LIRR 2nd track

Conducted noise monitoring on DEP Tunnel Confined Space for trades

Assist CPM with track safety and flagging verification check list on LIRR projects

Managing all safety & service matters of Employees and Public EDUCATION

A.A.S. in Occupational Safety

& Health Technology,

Colorado Community College

B.A. in Occupational Safety &

Health Technology, Trinidad

State Junior College

CERTIFICATIONS

2018 Asbestos Inspector

2017 Asbestos Handler DEP

License Holder

16 hr. NYC DOB Suspended

Scaffold

16 hr. Disaster Site Worker

40 hr. OSHA Hazwoper

8 hr. Hazwoper Supervisor

Refresher

10hr OSHA Construction

Health & Safety

8 hr. Confined Space Course

30 hr. Concrete Safety

Manager

40 hr. Construction Site

Safety Manager

4 hr. Supported Scaffold

User

Construction Site Fire Safety

Manager

4 hr. Lockout/Tagout,

Control of Hazardous

Energy, Spill Prevention,

Counter & Measure

Heart Saver CPR AED

30 hr. OSHA Construction

Health & Safety

MTA Track worker safety

training

4 hr. Flagger Awareness

Handheld Card

C3 – SSPC

LIRR Safety Training

2

Andre Bergman

Electrical Engineer

Overseeing all upgrades of multimillion-dollar train & Platform Security, infrastructure, superfund environmental projects for government and private sector clients. Electrical Auditor 06/2016 - 07/2017

Halmar International, New York, NY

Project: Bidwell-Whitestone & RFK Triboro Bridge $92,838,830.86 2ND Avenue Tunnel, Non-Right of Way

Conducted air monitoring for Electrician’s RFK Triboro, for dust in the anchorages.

Performed air monitoring on SCA main St. Queens and Coney Island SCA Projects.

OSHA air monitor & Focus Four on Platforms and Rigging Hardware, Harness PFAS, Sway Crane Permits Projects, Various Structural Repair, drawn Schematics, transformers, and tuned mass damper inspection & removals, Cable vibration & inspection, Triboro Bridge, 2nd Ave, Tunnel, Right of Way,

Safe Scope Plans, on LIRR/MTA LI Over Pass Permit Activities, & Work Safety Plans.

Manager & Auditor for all Metropolitan Transit Authority TBTA Construction Structured Horizontal/Vertical Cable Steel on White Stone Bridge and Tunnels Estimator, Project Manager 04/2015 - 05/2016

MECO Electric, New York, NY

Project: White Stone, Goethals Bridge, NYCHA Housing, Union Sq.& 14th Street, Non-Right of Way.

Performed Project Estimates on the white stone for Outdoor Voltage lighting, along different portions, of Electricians while working the stantions, street light brackets, EMT

Performed Schematics on the Midst of demo of the weights of the Bridges, cabling

Performed Lock Out, Confined Space Train & mold environmental air samples,

Conducting take off’s, expedite, New Employee Orientation & Safe Work Plan talk.

Developing & implementing Accident Emergency Generator Wiring, Safe Work Plans Drafter, Estimator 06/2011 - 03/2015

Time Warner Engineering, New York, NY

Project: 3rd Ave 25th St, Hub Non Right of Way, 2nd Ave Fiber, Battery Tunnel, Trade Center Fiber

Managing all safety & security Cabling on roofs, & street hubs of Non-Right of Way.

Overseeing all phases of multimillion-dollar construction, Street layouts, activity of lay out of infrastructure, superfund, environmental projects for government, private sector

Conducting kick off Meetings, Material Account Activity & Safe Work Plan talk.

Developing & implementing WIFI hubs, & modem kits, in streets of Queens Site Safety Foreman 06/2009 - 12/2010

Shaw Group; Stone & Webster, New York, NY

Project: JFK Tram, 2nd Ave Tunnel Non Right of Way, Fiber, Sandy Repair Queens Stations, 34th WiFi

Performed street electrical, mechanical on the Sandy Building Gas change outs of housing.

Supervising and managing all activities of construction project sites with carpenters, electricians, plumbers and other trades, residential & commercial with agency request

Supervised Site, w/ DEP, pump control, industrial Fire Protection & Life Safety

Electric for Jamaica, NY for Client DEP, Silo’s, Excavation, & Trenching, Confined Space 3

Andre Bergman

Electrical Engineer

Site Representative 05/2008 - 05/2009

Pro Safety Services LLC, Purchase, NY

Project: DEC Spill Prevention: Metro North, transit station Engineering, Fiber, Tel-Data tray Cut

Perform site Layout, site supervision, quality control, site safety.

Verify workers are using provided security gear and examine job sites to spot and correct possible safety hazards.

Site safety plans and Quality work plans

Site Safety Representative 01/2008 - 04/2008

Safety and Quality Plus, Inc., New York, NY

Project: 100 Park Ave, Tishman Transit Stairwell Construct, Lafarge, Metro North, Site Safety

Performed Daily Orientations prior to assigning tasks

Conduct and supervised weekly toolbox meetings.

Verify workers are using provided security gear and examine job sites to spot and correct possible safety hazards.

Perform daily inspections of entire jobsite and oversight of workers. Site Safety Manager 2007 - 2007

Site Safety, LLC/City Compliance, New York, NY

Project: Trocom, Canal St, Station, 59th Street Columbus Circle, Path, Metro North, L.I Rail Road

Performed air monitoring for crane and drilling operations.

Inspected site daily to ensure quality control and to monitor progress to keep each job on schedule.

Coordination of site safety objects, including road signs, barricades, and flagmen.

Verify workers are using provided security gear and examine job sites to spot and correct possible safety hazards

Electrical Engineer 01/1996 - 05/2011

JJ Rosenberg, Brooklyn, NY

Project: Trocom, Canal St, Station, 59th Street Columbus Circle, Path, Metro North, L.I Rail Road Owner Client Based, Queens Parking Lot Street Lighting, ABC/WABC

Electrical Transmission ASCO switches for ABC, WTC, & DEP

Studio Change Out of Power, Tel, and Data

Street Lighting, Truck, and Flood Light Survey, & Install

Exit Light Survey at Lincoln Square

Radio Antenna Transmission on WTC, Alpine NJ Tower,

Purchasing, Expediting, Asst PM, Field Change Orders, 4

Andre Bergman

Electrical Engineer

5

Andre Bergman

Electrical Engineer



Contact this candidate