JARROD EMERY
Broken Bow, OK **728
Cell 580-***-****
E-mail *******@*****.***
WORK HISTORY
Motivated, results-driven, construction management, project management with 20 plus years’ experience across multiple industries including renewables,oil/gas, process operations, maintenance and construction, in transmission, gathering and distribution.. A proven performer in multimillion-dollar levels, and negotiating cost-saving initiatives reducing overhead by tens of thousands of dollars. Demonstrated success in customer/vendor relationship management, with ability to quickly build genuine rapport and secure competitive contracts. Hands-on experience in operations and maintenance, construction, control/budgeting, with a reputation for dedication, creative problem solving, and outstanding service. Familiar with an array of construction procedures and specifications. –. Experienced with FERC, DOT, and PHMSA. Familiar with all types of civil and mechanical work through several disciplines from road building, concrete, site layout, trenching, concrete, piping and structural layout, welding and coating. Familiar with poly and steel pipeline. Familiar with, Word, Excel, PowerPoint, Projects, Heavy bid and share point.
Education
Eagle town High School class of 2001
South Eastern OK STATE – GENERAL STUDIES
Kiamichi Technology Center- WELDING CLASS 2001
CAREER EXPERIENCE
Various, US
10/11/18-Present
Managing Partner
G & E Contractors
Oversee day to day operations. Building report with clients and ensuring a successful project and timely completions exceeding the clients’ needs. Responsible for bidding projects, project management. Involved with projects from front end to closeout, All projects DOT and FERC regulated. Specializing in projects in the energy industry.
Renewables companies represented, Signal Energy, RES Americas, Southern Power, Tampa Electric, Rosendin and a host of EPC contractors.
Meeting and exceeding the expectations of clients.
Implement cost saving initiatives with manpower and logistics.
Adapting to the ever changing environment to provide the best service for each project.
Provide support and project services for Wind, Solar
Various, Oklahoma
3/1/18- 10/11/18
Superintendent
Cardinal Midstream
Oversaw construction of various pipeline projects. Latest project is 32miles Dual lay 20” and 16” for Iron horse midstream. In charge of all aspects of the project. Hiring and dismissal of employee’s, Project planning, Project tracking as well as keeping material and equipment coordinated.
Material Coordination
Manpower management and reports
Project Estimation
Implement Cost saving initiatives
Kingfisher, Oklahoma
7-6-17 / 11-25-17
Project Manager
Plains All American Pipeline
Oversaw installation of pump station and 2 trucking facility’s for Plains Stack pipeline
Installation of 3 pumps at the pump station and total of 16 lact units at trucking facility’s
Civil Construction – Road and Pad building
Mechanical – Supports, Piping
Direct Personnel
Project Tracking
Watonga, Oklahoma
5-20-17 / 6-28-17
Welding Inspector
Enable Midstream
Welding inspector on gather systems in central Oklahoma. Oversaw material inventory,
Fabrication, Main line welding, NDE and weld mapping. Ensured all applicable standards and codes were met.
Project Planning
Project Tracking'
Project execution
QA/QC
Corpus Christie, TX
1/05/17 / 5/17/17
Welding inspector
Chenierre Energy
Oversee testing of welders to several different processes. SMAW, FCAW, and GMAW. Qualifying of equipment for mainline shacks and tie-in shacks. Line consist of 23 miles of 48” x70 .1000 wt. pipe from Sinton, TX to Portland, TX, Worked in test bay qualifying welders and on tie-ins. Made sure contractor was in compliance with PHMSA and FERC regulations. Witness welding to ensure it met applicable specs and procedures.
Project planning
Project Costing
Project execution
QA/QC
Various, Ca
10-14-14 / 10/19/16
Chief Inspector / Construction Manager
Southern California Gas Co.
Oversee construction and Inspection on various distribution lines for SoCal Gas PSEP program. Involved with project planning, and design changes. Lines ranged in size from 8” to 16” and in length from 1.5 to 6 miles. All lines had multiple taps and service connections. Troubleshooting problems presented from the urban environment the construction was performed in. Strictly adhering to the PSEP program. Making sure all forms and job books met CPUC, DOT, and PHMSA specs. Project’s consisted of Upgrading SOCAL gas’s infrastructure replacing and abandoning existing distribution lines. Promoted from Chief Inspector to Sr. Construction Manager. Over the San Joaquin Valley. Participate in Bid meetings, Bid negotiations, and job walks. Multitasking running several projects at one time. All Projects Regulated by FERC,PHMSA,DOT and CPUC
Cost Negotiations
Project Progress
Project Manager
QA/QC
Amarillo, TX
6-18-14/ 10-14-14
Project Manager / General Superintendent
Elite Construction and Fabrication
Oversee the installation of 3 electric compressor units and the removal of 3 gas compressors.
Over civil, structural, and piping. Completed the project ahead of schedule and under budget. Project client- Apache Midstream/ Tall Oak Midstream
Battlefield Inlet- Fabricate 42”-2”piping install and set equipment for inlet area and Cryo facility. Project for Tall Oak Midstream. Contracted to perform EPC work for Kahuna Ventures. Tasked planning of daily work, ordering and verifying materials, Coordinating logistics, hiring and dismissal of employee’s and making sure crew was performing work to spec.
Project Manager
Cost Negotiations
Project Logistics
Manpower management
Plainville, Ks
4-1-14/ 6-15-14
Sr. Welding Inspector
Tall Grass Natural Gas
Oversee anomaly digs and pipe relocation, Replace existing corroded pipe with NEW 24” X .344 w.t. pipe. Coordinate material and specifications to the contractor. Installing new valve sets and rerouting pipeline in class change locations. Also lowering the line to meet D.OT. specifications. FERC regulated project.
Project Coordination
Project Management
QA/QC
Project Execution
Great Bend, Ks
11-18-13/4-1-14
Damage Prevention Specialist
Red Rock Midstream
Oversee the building of a 125 mile 12” pipeline. In charge of making sure pipeline paralleling and foreign line crossing’s where not damaged, making sure pipe was being stored and utilized properly. Coordination of line crossings and ROW approach.
Project Coordination
QA/QC
Various Continental US
8-7-12/ 11-5-13
Project Manager
Schwob Energy Services
Detroit Energy, Access Midstream, Dominion Gas, Mark West
Oversee all Construction in Pennsylvania, New York, West Virginia and Ohio. Over Pipeline, Compressor Station, Meter Stations, Interconnects etc. Order materials for jobs. Participate in estimating and bidding jobs, running and coordinating projects, hiring and dismissal of employee’s. Projecting schedule’s for a timely completions. Dealing directly with clients and on the issues of the projects and on the planning of the projects. Projects ranged from 5- 20 million.
Project Manager
Cost Negotiations
Project Planning
Project Execution
11/7/11-08/5/12
Construction Manager
Audubon Field Services
Construction manager over multiple projects from pipelines to NGL Facilities. Projects ranged from 1-30 million dollars. Participate in bidding jobs, running and coordinating projects, Projecting schedule’s for a timely completions. Dealing directly with clients and on the issues of the projects and on the planning of the projects
Project Coordination
Project Planning
Cost Negotiation
Refences
Available upon Request