CURRICULUM VITAE
Sonny D.Fontanos
Tres Reyes Saguday,
Quirino Province, Philippines
Mobile no. +639*********
*****************@*****.***
Possition apply : PIPE FITTER
:OBJICTIVES :To be a part of a team that could boost & upgrade my ability in the field of construction a operation.
Summary of Experience:
Company : BRANCH OF SK ENGINEERING & CONSTRUCTION CO. LTD.
Assignment : Jazan Refinery & Terminal Project EPC-9 (Crude) Jazan, KSA
Position Held : PIPING FOREMAN
Inclusive Date : July 18, 2019- to nov 5, 2020
Job description :
to supervise the fit-up of elbow & fitting material, valves installation and kind of diff. Pipe support fabrication and installation.
Line checking of isometric drawing that has to be worked and coordinated with my supervisor the work that is critical and need supervision.
Coordinate with supervisor to rectify comments and major punch list posted by client on all piping work for immediate approval.
Materials and tools preparations that will be used for work.
To supervise pipe erection and pipe support installation.
Measure and cut pipes according to shop drawing requirements.
Company : BRANCH OF SK ENGINEERING & CONSTRUCTION CO. LTD.
Assignment : Wasit Gas Plant Project Jubail, KSA
Position Held : PIPING FOREMAN
Inclusive Date : Oct. 01, 2015-July. 15, 2019
Reason for Leaving: Finish Project
Job description :
To supervise pipe erection and pipe support installation.
Checking the location of pipe and support.
Effective support constructions supervisor for punch clearing and maintain an updated and organized punch clearing & inspection status
Measure and cut pipes according to shop drawing requirements.
Material inspection and verification of materials delivered to ensure that the piping materials to be fit-up as per isometric drawing.
Company : SUNGDO ARABIA CONTRACTING LTD
Assignment : Wasit Gas Plant Project Jubail, KSA
Position Held : PIPING FOREMAN
Inclusive Date : Dec. 9, 2013-Sept. 30, 2015
Reason for Leaving: Finish Contract
Job description :
Materials and tools preparations that will be used for work.
To supervise pipe erection and pipe support installation.
Measure and cut pipes according to shop drawing requirements.
To supervise pipe erection and pipe support installation.
Checking the location of pipe and support.
Company : GLOBAL IWI ARABIA
Assignment : Jubail Fabrication Shop
Position Held : PIPING FOREMAN
Inclusive Date : June 5, 2011-August 5, 2013
Reason for Leaving: Finish Project
Job description :
Effective support constructions supervisor for punch clearing and maintain an updated and organized punch clearing & inspection status
to supervise the fabrication fit-up of elbow & fitting material, valves installation and kind of diff. Pipe support fabrication and installation.
Line checking of isometric drawing that has to be worked and coordinated with my supervisor the work that is critical and need supervision.
Materials and tools preparations that will be used for work.
To supervise pipe erection and pipe support installation.
Company : IWI LIMITED
Assignment : AL DUR Independent Water & Power Plant Project, Kingdom of Bahrain
Position Held : PIPE FITTER
Inclusive Date : September 16, 2009-up to February 13, 2011
Reason for Leaving : Completion of Assignment
Job description :
Review blue print to understand requirements.
Measure and cut pipes according to shop drawing requirements.
Select type ans size of pipe and related material and equipment, such as support hangers and hydraulic cylinder according to job specification.
Repairing main functions
Hydro testing pipe system to insure safety and functionality.
Company : DAEWOO E& C
Assignment : QATAR Chemical-II, Ethlyene Derivatives Project, Messaiees City, Qatar
Position Held : PIPE FITTER
Inclusive Date : May 11, 2008-up to May 16, 2009
Reason for Leaving : Completion of Assignment
Job description :
Review blue print to understand requirements.
Measure and cut pipes according to shop drawing requirements.
Hydro testing pipe system to insure safety and functionality.
Welding, assemble and lubricate pipes.
Install and secure pipes with clamps.
Company : Samsung Engineering and Corporation (Taiwan)
Assignment : Formosa Petrochemical Corporation
Position Held : IRON WORKER
Inclusive Date : April 28, 2005-up to April 14, 2007
Reason for Leaving : Completion of Assignment
Job description :
Fabrication of support, girder, columns structure, cross bracing
Fit up steam line pipe in a process area stainless steel pipe, bending of pipes installation of support.
Erection of spool in fit up according to the isometric drawing and plan drawing in pipe rock process area.
Fit up of spools from the pump motor going to the tank.
Checking the location of pipe.
Company : Jeong Poong Development Co. Ltd. (South Korea)
Assignment : LNG Terminal 1&2 (Expansion)Kogas
Position Held : PIPE FITTER
Inclusive Date : June 30,2004-up to March 26, 2005
Reason for Leaving : Completion of Assignment
Job description :
Lay out and cutting of pipes, bends pipes, and fit up of spool for fire fighting line in out side tank.
Layout and cutting of hole grinding before fit up for sprinkler.
Installation of pipe support .
Checking the location of pipe. and Review blue print to understand requirements.
Company : Seojin Heavy Industrial Co.Ltd.(South Korea)
Assignment : LNG Terminal (Pipe Shop)
Position Held : PIPE FITTER
Inclusive Date : April 16, 2004-up to June 30,2004
Reason for Leaving : Completion of Assignment
Job description :
Fit up of pipe, elbow, flange according to the isometric drawing like carbon steel and stainless steel
Fabrication of support and installation of the pipe support.
Threading of pipe for fire fitting.
Company : Sukwon Industry Co.Ltd (South Korea)
Assignment : Thermal Power Plant Unit 2
Position Held : IRON WORKER
Inclusive Date : March 26,2003-up to March31, 2004
Reason for Leaving : Completion of Assignment
Job description :
Fabrication of pipe support, girder, cross bracing
Fit up of spools in boiler area like alloy steel and carbon steel according to isometric drawing and plan drawing.
Erection of spools and pipe support.
Rectify the comment of punch list posted by client.
Checking all line before start hydro testing.
Company : Daelim Industrial Co. (Taiwan)
Assignment : Daelim Aroma 2/ Formosa
Position Held : IRON WORKER
Inclusive Date : November 30,1998-up to March 24, 2000
Reason for Leaving : Completion of Assignment
Job description :
Fabrication of columns, girder, cross bracing, plat forms, handrails and ladders.
Review blue print to understand requirements.
Fit-up and welding of plate, base plate, stiffener bracket, gusset plates.
Assembling and installing of steel structure design.
Company : Daelim / Malaysia
Assignment : Gas Petrochemical Plant 5 & 6 / Paka,Terengganu
Position Held : IRON WORKER
Inclusive Date : October 13,1997-up to October 13,1998
Reason for Leaving : Completion of Assignment
Jobs description :
Fabricate of all kinds of pipe support according to piping support design.
Fabricate of columns girder, cross bracing, flat form, handrails and ladders.
Fit-up and welding of plate, base plate, stiffener bracket, gusset plates.
Assembling and installing of steel structure design.
Fabricate, erection, installation, repair and steel structure design
Review blue print to understand requirement.
Company : A G & P Batangas
Assignment : Fabrication Shop (Philippines)
Position Held : IRON WORKER
Inclusive Date : 1995-up to 1997
Reason for Leaving : Completion of Assignment
Job Description :
Fit up of pipe, elbow, flange, reducer and different kind of material like carbon steel and stainless steel
Fabrication of pipe support .
Lay -out and cutting of hole for branches.
Fabrication of columns, girder, cross bracing, plat forms, handrails and ladders.
Review blue print to understand requirements.
Personal Data:
Birthday: March 12, 1973 Civil Status:Married
Nationality: Filipino Religion:Roman Catholic
Availability: Any Time
Home Airport: Manila, Philippines
Preferred Location of work: Any Location
Educational Attainment:
College-Associate Marine Engineering
Northern Philippines College for Marine and Technological Studies
March 31, 1995
Vocational – General Radio Communication Operator
National College of Technology
March 20, 1993
High School- LUNHS-San Fernando La-union
Other Skills:
Good in Verbal and Written Communication, Interested in new ideas, willing to learn and can work with minimum supervision.
Inspection and monitoring of all piping works.
welder
*References: Available upon request
.
I hereby declare under oath that this information are true and correct to the best of my knowledge and beliefs.