Post Job Free

Resume

Sign in

Instrument Engineer Wind Power

Location:
Toronto, ON, Canada
Salary:
$85/h
Posted:
July 29, 2022

Contact this candidate

Resume:

**** ****** ********* · RESUME *

Ashkan Miraftabi, MSc., P.Eng

adrxjt@r.postjobfree.com

519-***-****

“Life is so much easier with a good sense of humor.” KEY QUALIFICATION

Security cleared for both Bruce Power and OPG.

Experienced Electrical, and I&C engineer in both oil and nuclear industry.

Good knowledge of power generation and experience in upgrade of control systems for steam turbine generator systems.

Experienced in Nuclear industry and its processes and standards especially Bruce power procedures.

Strong trouble-shooting and analytical skills with a good theoretical and technical background in control engineering.

Comprehensive knowledge of industry regulatory codes and standards for electrical systems. PROFESSIONAL EXPERIENCE

Modification Team Lead / Technical Lead Jun.2021– Present ES FOX,Pickering

Reviewing design service provider design documents in each phase of project to ensure updates are correct and provide comments if required.

Work planning and coordination of multi-discipline work groups. Identification and interfacing with all relevant stakeholders and process owners to meet prescribed objectives.

Lead/participate in preparation of installation, work planning, Construction Completion Declaration, AFS, Operation and other stakeholder’s acceptance and closeout.

Prepare/participate in preparation of Installation Completion Declaration. Project Engineer Lead Jan.2020 –May.2021

Tetra Tech, Kincardine, Canada (Bruce Power Turbine Control System (TCS) Replacement Project)

Provided technical support and oversight during planning, development, execution and commissioning of plant modifications.

Provided technical support and oversight during planning, development, execution and commissioning of plant modifications.

Prepared project scope document defining the overall technical scope of the project.

Prepared commissioning report, familiar with Bruce Power Procedure, and Maximo (SCR, FMTS, CIC, DCR).

Interfaced with internal contacts within PMC programs and site engineering, operations, maintenance department, and support communications with external regulatory agencies, contract service providers, manufacturers in alignment with approved designs and supply chain processes.

Reviewed conceptual and preliminary Engineering reports during 50% and 90% design package submission for compliance to the overall technical scope of work, cost and schedule. Request revisions as required. Electrical and Instrument Engineer Oct.2018 –Dec.2019 Worleyparsons, Kincardine, Canada (Bruce Power Turbine Control System (TCS) Replacement Project)

Prepared engineering documents such as control system schematics, electrical drawings, bill of materials, operation and maintenance manuals.

Performed voltage drop calculations for new turbine control system loads in accordance with CEC and OESC requirements.

Collaborated with the project manager and electrical engineers to ensure that projects are completed on time and within budget.

Supported the projects’ proposals, schedules, estimates and developing projects’ progress reports. Electrical System Engineer Aug.2013 –Aug.2017

National Oilwell Varco, Stavanger, Norway

Managed project engineering and design concepts of equipment layout for internal and client review.

Instrumentation, documentation, detailed electrical drawing and electrical specification for approved projects.

Programming, configuration and testing of different drilling control system. 2020 Ashkan Miraftabi · RESUME 2

Created and configured the HMI (Human Machine Interface) and PLCs on the cyberbase systems.

Assembled, systematized and standardized controls system.

Coordinated different teams during factory acceptance tests.

Performed factory and site acceptance testing.

Controlled and approved the cyberbase system before final delivery.

Provided troubleshooting, debugging, commissioning and maintenance supports to the teams located in site.

Established the bill of material.

Experienced in commissioning and installation process of different projects in Samsung and DSME shipyard in South Korea.

Control and Instrument Engineer May.2010 –Apr.2011 Putrajaya Power Station, Putrajaya, Malaysia

Contributed in inspection and maintenance of electrical and electronic equipment.

Controlled dehydrating breather of transformers.

Calibrated exhaust sensor of gas turbine.

Installed vibration sensor in generator, controlled wiring of combustion chamber.

Calibrated thermocouples dump valve, pressure gauges and RTDs. EDUCATION

Master of Electrical and Computer Engineering (Power System) Sep. 2017 –Aug. 2018 Western University, London, Ontario

Master of System and Control Engineering June.2011 –Jul. 2013 Telemark University College, Porsgrunn, Norway

• Thesis: Modeling and optimization of an urban street heating system Bachelor of Electrical Engineering Sep. 2006 –Mar.2011 Multimedia University, Cyberjaya, Malaysia

• Thesis: Interfacing wind power generator with grid system

• Publication:

"Steady-state analysis and voltage control of Self-Excited Induction Generator (SEIG)," Environment and Electrical Engineering (EEEIC), 2012, no., pp.776- 781, 18-25 May 2012.

”Power Factor Improvement for Grid Connected Induction Generator (GCIG)”, ICECS Ottawa, Ontario, Canada, 22-24 August 2012 Paper No. 95. ISBN: 978-0-9867183-5-9.

”Studies of Voltage Sagand Faults in a Wind Generator Interfaced With Grid System”, ICECS Ottawa, Ontario, Canada, 22-24 August 2012 Paper No. 96.ISBN:978-0-9867183-5-9.

”AC-DC-AC PWM Converter in Variable Speed Wind Turbine”, ICECS Ottawa, Ontario, Canada, 22-24 August 2012 Paper No. 114.ISBN:978-0-9867183-5-9.



Contact this candidate