Post Job Free

Resume

Sign in

Husky Energy Suncor

Location:
Edmonton, AB, Canada
Posted:
July 29, 2022

Contact this candidate

Resume:

Last Revised May ****

Page * of *

PRANESH DHANPAL

QC/Turnover Coordinator & Pipefitter

**** ** ******

Edmonton, Alberta

T6T1R2

Cell: 780-***-****

Home: 780-***-****

Expertise

Developing piping isometrics from

P&ID’s as per construction

requirements

Reading and correcting piping

isometrics

Creation of hydro-test packages

Reviewing turnover documentation

Final construction walk down

punch listing

Addressing and implementing RFI’s,

DCN’s, and FCN’s

Knowledge of B31.1, B31.3 and

Z662 Piping Codes

Extensive experience in all areas of

construction from design to

commissioning and startup

Familiarity with WHMIS safety

standards and Specifications

Education

Interprovincial Red Seal as

Pipefitter, Apprenticeship Board of

Canada

Interprovincial Red Seal as

Boilermaker, Durban Technical

College, South Africa

Diploma, Mechanical Engineering,

Durban University, South Africa

Certifications

H2S Alive

First Aid Level C and CPR

WHMIS

Fall Arrest

Confined Space

CSTS-20

Profile

I am a highly efficient and hardworking field engineer in the Petroleum and Mining Industries with over 23 years of experience. My previous professional trades experience include boilermaker, pipefitter, piping foreman, general foreman, hydro test coordinator, piping planner, quality controller and piping technical coordinator. I am extremely team orientated with a focus on producing timely and quality work in a safe and effective manner. I am Looking to find a challenging and suitable engineering position with an ambitious company that offers opportunities for career development and advancement. Professional Affiliations & Certifications

• Obtained Certification as a

Boilermaker

• Interprovincial Red Seal

Steamfitter (4-Year Course)

• Quality Control Level 1

• WHMIS and CSTS

Certifications

• JLG and Genie Certifications

• Practical Loss Control

Leadership (Management)

Certification

• Supply chain training at

Suncor

• Introduction to SAP

navigation

• Supervisor training

certificates in both Canada

and South Africa

• OSSA permit, harness,

Confined Space and H2S alive

training

• Alberta Hoisting and Rigging

Certification

• Valve Repair level 1

certificate

• MP Construction EH&S

Reference Manual 2011

• Process Safety Overview

• Fundamentals of SPIM

• Construction technical

onboarding course

• Construction Readiness for

Site Mobilization Training

• MP turnover process

requirements and obligations

• Ready for Fabrication and

Construction Training

• Construction Safety Training

Systems (CSTS)

• Oil Sands Safety Association’s

Orientations (OSSA)

• Occupational Health & Safety

(OH&S)

Last Revised May 2022

Page 2 of 3

PRANESH DHANPAL

QC/Turnover Coordinator & Pipefitter

2631 31 Street

Edmonton, Alberta

T6T1R2

Cell: 780-***-****

Home: 780-***-****

Employment History

Pipefitter – CNRL Horizon Shutdown May 2022 - Present Phoenix Industrial

Removal of existing piping and installing new piping as per isometric

Rigging up piping as per coordinators

Fitting up piping for the welder

Hydrotesting

Reinstatement of hydrotest packages

Final bolt up and final torquing

General housekeeping

Pipefitter – Long Lake Project March 2022 – May 2022 Phoenix Industrial

Fitting up piping for the welder in the fabrication area

Rigging up piping as per coordinators

Fitting up piping for the welder

Hydrotesting

Reinstatement of hydrotest packages

Final bolt up and final torquing

General housekeeping

Piping Planner – IPL, PDH Project 2021 - 2022

Worley Parsons

Creating FIWP work packages

• Creating work packages from punch list

• Making up system packages for final walk downs

• Making up and working on torque sheets

• Working on final turnover packages

Quality Coordinator – Mechanical 2013 - 2019

Worley Parsons Cord

Worked at CNRL (Horizon), Keyera (Turbo Project) Rimbey, and Husky Energy (Sunrise)

• Building hydro test packages

• Approving hydro test packages with client daily

• Working on field change redlines

• Punching hydro test packages

• Constructing system walk down packages

• Working on weld mapping and QDMS

• Scheduling system walk downs and sending out notices

• Constructing walk down packages

• Constructing master deficiency list and signing off punches with client Last Revised May 2022

Page 3 of 3

PRANESH DHANPAL

QC/Turnover Coordinator & Pipefitter

2631 31 Street

Edmonton, Alberta

T6T1R2

Cell: 780-***-****

Home: 780-***-****

Piping Technical Coordinator 2010 - 2013

Suncor Energy Major Projects (Firebag Stage 3/4)

• Responded to contractor requests for information and supported construction management team to troubleshoot design issues affecting construction progress

• Established an effective field engineering working relationship and lines of communication with project design engineers including agreements on engineering deliverables

• Established and maintained clear lines of communication with contractors to ensure clear scopes of work aligned with construction and engineering design

• Coordinated system walk downs with commissioning and startup operations for turnover

• Supported construction with executing work in compliance with engineering drawings, standards and specifications.

• Reviewed hydro test packages and prepared punch list deficiencies

• Hydro test witnessing and PTR sign offs

• Redline verification, audit and sign offs

• Final review of turn over binder and verified closure of field engineering scope of work, signoff Piping Technical Coordinator 2009 - 2010

PCL Industrial (Shell Scotford Phase 1)

• Directed four hydro testing crews to meet stringent deadlines in a fast paced manner as well as monitoring and evaluating the performance of employees

• Maintained a professional relationship with the client and provided solutions to unanticipated events

• Ensured specific safety requirements, policies, and procedures were followed according to each job scope

• Prepared detailed daily reports and attended meetings with clients to follow up on completed tasks

• Provided extensive knowledge of resources and services to ensure client satisfaction Hydro Test Lead 2005 - 2009

Ledcor Industrial (Albian Sands Expansion-1, Snap Lake – De Beers Diamond Mine, Long Lake Project)

• Creation of CWP’s as per scoping definitions

• Development and cost coding of FIWP’s

• Interaction with superintendents in preparing job plans for critical shutdown installations, including sequencing of associated tasks, scheduling and materials and special tools allocation

• Scoped different test packs as per spec changes on P&ID

• Created and maintained test packages flow chart to control and perform activities regarding piping test packs in a systematic manner

• Correction of P&ID and piping isometrics

• Interaction with clients engineer for appropriate and timely approval of RFI’s and test packs by suggesting modifications and design changes to meet schedule goals

• Developed ISO as-builts and BOM’s for field run piping and modifications

• Created and maintained hydro test and torque logs

• Performed final walk downs with client



Contact this candidate