Gündoğan Birben
Evliya Çelebi sokak /Yusuf Salih Apt: Kat:5/Daire :24/Bina No:16 Fener Mahallesi /RİZE- Merkez
Email: adrvke@r.postjobfree.com
Mobile: 0-532-***-**-**
PERSONAL INFORMATIONS
Nationality: T.C
Birth Place: Rize
Birth Date: 01 Jan 1982
Marital Status : Single
Military Status: completed
EDUCATION
1988-1993 -CAY PRIMARY SCHOOL-RİZE
1993-1996 -CAY INTERMEDIATE SCHOOL-RİZE
1996-1999 -FENER HIGH SCHOOL-RİZE
2001 – 2006-UNIVERSITY OF CUKUROVA FACULTY OF GEOLOGY ENGINEERING
WORK EXPERIENCES
MAY 2018- OCTOBER 2020-ÇANAKKALE 1915 SUSPENSION BRIDGE PROJECT
APRIL 2015 JULY 2017 --SOCAR (PETKIM)–TSGI AEGEAN REFINERY PROJECT IN IZMIR ALIAGA PROVINCE
NOVEMBER 2013 DECEMER 2014 IHI-STFA-AKORT CONSTRUCTION (OSMANGAZI SUSPENSION BRIDGE)
APRIL 2012- MAY 2013 NESMA-ESER-ONUR CONSTRUCTION GROUP IN SAUDI ARABIA
July 2011 – APRIL 2012 ALİ TATLİDİL -BINJARALLAH CONSTRUCTION EST COMPANY IN SAUDI ARABIA
June 2010- February 2011 EKATI CONSTRUCTION CO.LTD
July 2008 – June 2010 SEKTOR CONSTRUCTION CO. LT
MAY 2018- OCTOBER 2020 -ÇANAKKALE 1915 SUSPENSION BRIDGE PROJECT
I worked in Çanakkale 1915 suspension bridge project between May 2018 -October 2020 as Senior QC Engineer
Reviewing Concrete mix designs C20/25,C25/30,C30/37,C 45 /55,according to ACI AND TS EN 206-1,TS 13515,TS 802,Self compacting design application, and shotcrete design according to TS EN 11747 and application at site
Reviewing concrete laboratory tests such as slump test, flowable test, air test, unit weight, and compressive strength tests in batching plant
Reviewing fine and corse aggregate tests(such as sieve analyse,los Angeles abrasion, flakiness index, Clay lump, water absorption,moisture content, specific weight, Methylene blue,organic impurity at laboratory
Reviewing casting concrete and rebarworks at site in İncremental launching system and viaducts
reviewing all piling works at site and checking bentonite tests at site,approximately 279 bored piles completed in this project according to TS EN 1536 and TS EN 1538 STANDARTS
Reviewing Soil improvement works such as DSM (deep soil mixing )and stone columns works,soil nail and shotcrete works,Barret Piling Works
Reviewing osterberg test application and Pile integrity test procudure
Reviewing revetment works onshore,for revetment We used various dimensional materials such as 1-3 ton,0,5-2 ton,2-5 ton,core material (10-50mm)
Checking ITP, MS, technical specifications,BS and ACI,EN standarts
Soil nail and soil drainage works (weep holes, slope drain, sub horizontal drains) and prestressing anchorages regarding slope stability at pull out test for soil nails and stress tests for anchorages
Repairing works in concrete and grout surface
reviewing Sika materials,Mapei and Basf materials at site
Preparing material receiving inspection report (MRIR) for all materials using at site
APRIL 2015 JULY 2017--SOCAR (PETKIM)–TSGI AEGEAN REFINERY PROJECT IN IZMIR ALIAGA PROVINCE
QC Engineer
Rewieving Concrete mix design C20-25/C30-37/C40-50 according to ACI AND TS EN Standards
Standart and CBR -MDD proctor test at laboratory and sand cone test at site according to ASTM and TS standards
Plate load and LWD test in order to find out soil bearing capacity of backfilling at site
Sieve analyses for coarse and fine aggregate
Rewieving backfilling and excavation
Concrete compression test, slump test, air contain test for mix designs
Specific gravity tests for coarse and Fine aggregate in order to do concrete mix design
All soil and concrete tests done according to technical specification
reviewing QCP, ITP, checklist and NFI or RFI Procedures
piling works and soilcrete (jetgrout)
Soil nail and soil drainage works (weep holes, slope drain, sub horizontal drains) and prestressing anchorages regarding slope stability at site
pull out test for soil nails and stress tests for anchorages
Checking enjection works for soil nail and soil anchorages
Repairing works in concrete and grout surface
reviewing Sika materials and Basf materials
review fireproofing application for steel structure and equipments at site
concrete and rebar inspection, formwork inspection of substation buildings at site
checking of paving concrete execution at all site
Responsible for all QAQC Civil activities on site
-Ensure that the Method Statement (MS), Inspection checklist are implemented.
-Ensure that quality records documented and update
NOVEMBER 2013 DECEMBER 2014 IHI (Japan company)-STFA-AKORT CONSTRUCTION
QC CIVIL INSPECTOR
I worked as QC in İzmit bay suspension bridge about 1 year one month
Responsible for concrete and rebars works as QC in This project
We installed cooling pipe systems for keeping in a particular value temperature of concrete and after concrete casting I follow curing and repairing works at site
Responsible for all repairing works at site,for repairing,We used Sika materials such as Sikadur31,32,Sika Monotop 612,620,Sika grout 212
We installed tendon systems for suspension bridge,We installed 120 duck,inThis process I followed this application at site
I closed NCR documents that was opened regarding construction and repairing works
Reviewing soil compaction tests
Reviewing checklist,ITP and MS procudures
APRIL 2012-2013 APRIL NESMA-ESER-ONUR CONSTRUCTION COMPANY IN SAUDI ARABIA
THE NAME OF PROJECT İS JEDDAH STORM WATER DRAİNAGE PROGRAMMME
SITE ENGINEER
I worked as site engineer in wadi Ghulail Dam 6 and dagbash dam 4 in Jeddah, I was in charge of secant piles and soil enjection in body of dam I got involved all tests sucs as sand cone test,compaction test, sieve analyse and soil tests at the same time,I tried to organize all casting of concrete on cite,about this works I prepared daily report
1.2 km length 12 m hight Filling Dam Excavation and Backfilling
Upstream Surface Concrete Covering
Dam Crest Asphalt Works
7 km Road Works (Includıng Asphalt )
Subbase and Base-course Production
Compaction Test, MDD, Proctor Value, Relative Density, Loading Test Applications on the site
Piozemetter, Survey Movement Points and Pressure Gauge installation
secant pile and enjections works in body of the dam and Spillway structure
follow drilling works for enjection and piozemeter,We did drilling works by rock machines
-We did drilling works for secant pile by casagrande B175XP machine
July 2011 –APRIL 2012
BINJARALLAH –CONSTRUCTION EST COMPANY IN SAUDI ARABIA
SITE ENGINEER
I worked as geological engineer in Bisha-Taballah dam construction / in Saudi Arabia, I was in charge of curtain enjection and contac and consolidasyon enjections in deviation tunnel, at the same time I got involved with soil experiments such as sand cone test,compaction and sieve analyse,atterberg limits,concrete compraasion tests and I got ready the report about tests I did
I arranged weekly reports regarding curtain injections and contac and consolidation enjections in dam
I followed drilling works in deviation tunnel,and drilling works were completed by rock machines
I followed drilling works for ejection in body of dam,,Drilling works were completed by D500 drilling machines
August 2010- February 2011 EKATI CONSTRUCTION CO.LTD IN TURKEY
SITE ENGINEER
I worked as field engineer in a infrastructure project related with fiber optical systems between Samsun-Trabzon
I was responsible for controlling subcontractors that worked in various parts in this project
-600 km Excavation and backfilling control
-We put manholes T4 in each of 500m and put manholes T1 in each of 2000m
- I arranged as daily report in googleearth drawing of line
July 2008 – June 2010 SEKTOR CONSTRUCTION CO. LTD. IN TURKEY
SITE ENGINEER
My former Company had a project which related with fiber optical systems between Eskisehir city and Denizli city then I was the coordinator of this project. I arranged the processes of this project. After finishing this project my company assigned me to another project which is related with soil investigation of TURKCELL Base Stations.
July 2005 – September 2005 RIZE MUNICIPAL
Summer Trainee
I had some experiences about soil investigations and landslides in Rize environment
LANGUAGES
English (Fluent)
Arabic (I know Arabic until I can understand formans and labours at construction site in Arabic countries)
CARIEER PLAN
As a first step, to get experiences in an International Company involved in the Construction Field, specialize in special projects and improve my languages skills
REFERENCES
Ramazan Çetinkaya
Title : Construction Manager
Mobile Phone Number: 053*-***-**-**
Erol Türk
Title: SOCAR Lead Construction Engineer
Ergun Öztürk
Title: Project Coordinator at izmit bay suspension bridge
Mobile Phone number :053*-***-****
Mahmut Ertaş
Title : Site Construction chief
Mobile number :055*-***-**-**
Adem Yazıcı
Title : Nesma-Eser-Onur -Survey chief
Mobile Number : 053*-***-**-**
OTHER
Excellent command of Microsoft Windows XP and applications (Excel, outlook, Word,,Powerpoint,autocad 2008,Google earth).
HOBBIES
Basketball,Tennis, Football, Tracking,Reading, playing chess,Swimming,traveling