Post Job Free

Resume

Sign in

Security Guard Power Control

Location:
Fremont, CA
Posted:
July 23, 2022

Contact this candidate

Resume:

Najibullah Ebrahemi

Fremont, CA *****

adrui5@r.postjobfree.com

972-***-****

Work Experience

Services Officer

P.P.S (President Protective Service)

March 2012 to November 2019

· Received and resolved customer complaints

· Conduct and lead sub meetings

· Preparing applications for planning and building control departments.

· Resolving problems and issues that arise

· Preparing weekly monthly and quarter report of ongoing project. General Maintenance Engineer

P.P.S (President Protective Service)

December 2010 to March 2012

· Check project quality per project specs.

· Check and inspect the structural work for any deficiency

· Conduct routine site visits to ensure the project hit the schedule and budget

· Ensuring that the environmental impact of the project is managed. Team Leader (MOCROWAVE Assistant Engineer)

SG Co .Ltd

September 2010 to December 2010

· Performed feasibility study based on E1, power, tower conditions, cabinet, coverageetc

· Deployed, installed, configured and regularly monitored the health status of GSM BTS sites

· Installed, tracked dishes, linked up and configured the voice/data services from VSAT terminal

· Prepared acceptance test report collaborating with vendors, switching engineers, procurement department, field engineers, and internal constituencies. Team Leader (MOCROWAVE Assistant Engineer)

Smart Group Company. - (Des

January 2009 to September 2010

· Executed and managed Drive Test/Call Quality Test for voice and data analysis

· Prepared report to add/delete the sites based on SNR, RF coverage, pilot pollution etc.

· Performed parametric testing of CDMA handsets with TIA/EIA-98 Standard for handoff timing, power control, RF output power, pilot detection etc.

· Supported to install & configure BSC, PDSN, AAA, NMS, MSC, SS-7, VLR,HLR, WIN server Structure Engineer

Ministry of Transport and Aviation

December 2006 to December 2006

· Track RFIs and Submittals

· Assisted in the quality and safety audit.

· Identified and highlighted possible risk on project

· Prepare projects estimation, technical drawing, BOQs, site plan, etc. as required. Technician

Water in Watson - L.b

September 2006 to December 2006

· Perform laboratory tests using a variety of equipment and reagents

· Prepare specimens and samples

· Ensure strict safety and sanitation procedures are carried out Hydrogeological Surveyor

Kabul University

June 2006 to September 2006

· Applying fundamental geology to develop an understanding of how the rock types and structure in an area impact on groundwater occurrence and movement.

· Interpreting maps, geographical data, historical evidence and models to build up a picture of the groundwater regime and/or land contamination, often based on incomplete information.

· impact assessments of groundwater abstraction and management activities.

· Liaising with other hydro geologists, hydrologists, ecologists, engineers, and other professionals in related fields.

· Ensuring compliance with environmental legislation and keeping up to date with technological and legislative developments.

Education

Bachelor's Degree in Geology

Kabul University

2001 to 2005

Languages

• English - Beginner



Contact this candidate