William D. Hawk
Glen Carbon, Illinois ***** Email: **********@***.***
Cell Phone: 618-***-**** Linkedin: William Hawk
PROFESSIONAL SUMMARY
Engineer with fifteen years of experience in structures, construction, mine subsidence, transportation and drainage projects of both private and governmental. Forward thinking and well versed in all engineering codes, manuals, specifications, standards, testing procedures, and construction materials. Proficient and successful in building team work environments, mentoring and working with others. This includes being well detailed and organized, excellent communication and providing team work assistance to others being innovative with new ideas to improve project longevity and sustainability. Committed to solutions of projects both public and governmental ahead of schedule by design of environmental conscious and cost effective solutions. HIGHLIGHTS:
Project management
Operational analysis
Technical project execution
Water piping design
Project cost and estimation of materials
Erosion and sedimentation control
Governmental and private project skills
Inspection analysis
Supervisory skills and complex problem solver
SKILLS:
Proficient time management and office administration.
Detailed in documentation and reports
Communicates well with others
Computer Software efficiency: Micro Station, Mitek, Microsoft Office, AutoCAD Civil 3D, Ramsteel, Primecad,
Risa 2-D & 3D, Geopak, ArcGIS, Microfilm, Theodolite, Storm-CAD Work Experience:
Feb. 2017 – Jan. 2021 Civil Engineer III
Illinois Department of Transportation
1102 Eastport Plaza Drive
Collinsville, IL 62234
Managed and oversaw various state bridge and roadway projects for Quality Control and Quality Assurance within the construction schedule for cost and documentation to keep project budget within constraints.
Lead and directed pre-construction meetings for projects with prime contractors and IDOT construction personnel.
Assigned various technicians/engineers accordingly on projects in coordination with contractors scheduled tasks.
Documented and approved change orders and extra work due to project plan omissions or different field site conditions from plans.
Consulted with various agencies for project requirements and pre-existing site conditions.
Reviewed project plans and documents and submitted them for letting and bid process by contractors.
Supervised and documented Quality Control and Quality Assurance for concrete air percentage testing and concrete cylinders.
Statistical pavement locations of asphalt to be cut, cored, and tested. William D. Hawk
See specific projects completed under DETAILS in pages below.
(Personal reason for leaving job position was due to the need of immediate care for three ill family members that is now resolved.)
December 2010 – 2016 Civil Engineer II
Illinois Department of Natural Resources
Abandoned Mines Land Reclamation Division
1302 Alumni Hall
Edwardsville, IL 62026
Managed mine subsidence abatement projects from abandoned coal mines from site evaluation to project completion for projects deemed a public safety hazard.
Performed site evaluation and documentation that included projects budget and cost. Project scope of work, general notes, and guide lines for contracts to submit to various contractors for bidding on projects.
Projects worked on includes I-72 bridge at Riverton, Illinois grouted abandoned coal mine to stop subsidence and structural damage to bridge.
Evaluated and deemed structurally unsafe the ice rink in Fairview Heights, Illinois.
See specific projects completed under DETAILS in pages below.
(Reason for leaving to higher paying position at different state department.) Oct. 2006 – Oct. 2008 Structural Engineer
Aegis Metal Framing
14515 North Outer 40 Dr. Suites 110
Chesterfield, MO. 63017
Set a new company record for the most completed customer light gauge metal roof truss repair designs in a year. This was noted and documented in the steel note publication.
Used Mitek software to get the load results on the truss member to be repaired.
The load results from Mitek were put into Excel spreadsheet with formula to determine and size steel member and fasteners for repair of damaged or reinforced member. Mar. 2001 - Jun. 2001 Structural/Civil Engineer
Ocheja Engineering Incorporated (OEI)
4670 Landsdowne Ave. Suite 111
St. Louis, MO. 63116
Performed hydraulic watershed analysis of St. Louis subdivision using storm-cad software for sizing concrete storm sewer pipes.
The use of Storm-Cad software for sizing and new replacement of storm sewer pipes due to drainage issues in St. Louis, Missouri Area.
Feb. 2000 - Mar. 2001 Civil Engineer
Technipower Contract Staffing
Chesterfield, MO. 63017
Contracted structural engineer for various educational and commercial building projects using Risa 2D & 3D software.
Belleville West High School completed structural analysis using Ramsteel software. Sept 1999 - Feb 2000 Civil Engineer
St. Louis County Highway Department
Utilized Microstation for county road projects. Also took field measurements. Jun 1999 - Aug 1999 Structural Engineer
Larson Engineering of Missouri
Hazelwood, MO. 63042
Structurally designed building curtain wall systems utilizing excel spreadsheets for glass wall facades. William D. Hawk
Apr 1997 - May 1999 Structural Engineer
Ibrahim Engineering Corp.
11500 Olive Boulevard, Ste. 200,
Saint Louis, MO 63141
Designed multistory commercial, industrial, and educational building.
Performed cost analysis and construction schedules for new and addition to buildings using excel spreadsheet software.
Performed gravity load, lateral wind and seismic analysis of multistory buildings according to IBC, ASCE and AISC specifications and design requirements which included: the roof and floor diaphragms, steel moment frames, overhead steel beam for hoist lifts, composite steel beams and girders, shear walls, columns and their base plates. Used Ramsteel, Excel spreadsheets, and Risa 2D & 3D software.
See specific projects completed under DETAILS in pages below. DETAILS:
Feb. 2017 – Jan. 2021 Civil Engineer III
Illinois Department of Transportation
March 2020 to October 2020 Interstate 255 project from Collinsville, Illinois to Interstate 64 intersection at Belleville, Illinois. Road resurfacing completed.
New bridge deck, new asphalt shoulders, and road erosion control completed.
Concrete testing for air content and cylinders.
Project was completed in October 2020 before November 2020 due date.
IDOT and construction companies were gratified about the completion.
March 2018 to September 2018 Route 143 Indian Creek Bridge at Wood River, Illinois included removal and replacement with new bridge.
Tree and brush clearance for drainage.
Supervised, calculated,documented, and recorded new steel H-piling installed for Route 143 Indian Creek Bridge Wood River, IL piers and abutments.
Project was completed ahead of schedule at Indian Creek Bridge at Wood River, Illinois December 2010 – 2016 Civil Engineer II
Illinois Department of Natural Resources
Abandoned Mines Land Reclamation Division
Project Interstate 72 bridge at Riverton, Illinois project was started in January 2011.
It was determined the measured settlements and deflections of the bridge were due to a mine subsidence issue.
Use of plastic borehole casings for the grout to fill the mine were insufficient. This was due to flooding and nearby river. The bottom of plastic borehole casing were squeezed and closed off due to weak plastic materials and increased soil saturation.
To resolve this it was determined to use steel borehole casings for grout to pumped into the abandoned mine.
After the mine was completing grouted routine surveys were conducted throughout the year for verification.
The bridge deflection and settlement had stopped and was completed with survey measuring methods and techniques.
William D. Hawk
Apr 1997 - May 1999 Structural Engineer
Ibrahim Engineering Corp.
Managed and oversaw union laborers for various building projects. Supervised a drafting personnel staff of eight people for consulting engineering design firm.
Performed design of concrete tilt up walls, isolated footings, combined footings, strip footings, drilled piers, and their anchors based upon soil reports and ACI code specifications and requirements for new and building additions.
Performed shop drawing reviews and inspections of steel and concrete rebar as quality control to ensure blueprint design specifications were met for various projects.
Performed field inspections of steel framing, masonry, concrete foundations, and welds for blueprint accuracy and code compliance.
May 1988 - May 1992 United States Marine Corps
Motor Vehicle Specialist - Desert Storm - Iraq
Operation Provide Comfort – Medals received for service Certification:
EIT – 42893 –E Missouri March 3, 1997
Education:
Graduate work:
Aug 2004 – May 2006 Southern Illinois University (SIUE) Edwardsville, Illinois, 62025
Classes taken: Advanced Concrete Design
Structural Analysis II
Wood Design
Wastewater Design I & II
Jan 1994 - May 1996 Bachelor of Science Civil Engineering, Major Southern Illinois University (SIUE)
Edwardsville, Illinois, 62026