Post Job Free
Sign in

Land Surveyor Data Entry

Location:
Riyadh, Saudi Arabia
Salary:
10000 SR
Posted:
July 12, 2022

Contact this candidate

Resume:

Cover letter

To,

Human Resources Manager,

Respected sir,

Subject: Post Applied for Land Surveyor

The Purpose of This Communication Is to Introduce My Self or Considering My Application for The Post of Land Surveyor in Your Esteemed Organization.

I, MUQARRAB ALI would like to submit my curriculum vitae for your kind perusal as Sr;Surveyor in Highways, Bridges, Culverts, Irrigation, Sewerage, Water supply, Underground Utilities and other Civil\Infrastructure works over the past 10 years in which 1 years working in Pakistan and 9 years’ experience in Saudi Arabia and currently I am working in Saudi Arabia at Al Khobar 2 Seawater Reverse Osmosis Desalination Plant.

Aside from having good exposure on various projects I also have the ability to work in a team for the company. I assure you; I will discharge my legislative duties to the entire satisfaction, and may I request you to kindly give me an opportunity to serve my posting in your esteemed organization.

Thank you,

Yours sincerely,

MUQARRAB ALI

+966*********, 053*******

**************@*****.***

CV Land Surveyor

Name : Muqarrab Ali

Mobile : +966*********, 053*******

Email Address :**************@*****.***

Current Position: Senior Land Surveyor.

Desired Position: Senior Land Surveyor/Land Surveyor.

●Career Objective

To work in a dynamic, team oriented, competitive and cooperative environment in a reputable organization, where there is maximum chance of learning and grow as a proficient, innovative and committed professional.

●EDUCATION

Diploma (D.A.E) in Civil Engineering :

Metric (S.S.C) :

Pakistan College of Technology MB Din

●Computer Skills

MSOffice(Word,Excel,Power point)

Auto Cad

Tool Pack

●Experience in Survey Instruments of Following Types:

Total stations: Sokkia Total station (Set 610k, 630r, 510,630rk, 530, IM 55)

Leica Total station Leica power set Tso2,06plus,09, Leica Builder405, Theodolites and all level instruments

GPS : Tremble R 6, Leica-Viva-GS12, LeicaVivaGNSSGS15

Level Machines : All t types of Levels & Digital Levels.

EXPERIENCE: Total Experience More than 10 years in Land Surveying.

2nd Organization December 2013 to December 2017

Organization Al-Dhahiri International Group of Companies.

Project AshghalRabigh,Jeddah Rabigh.

Position: Sr. Land Surveyor

Responsibilities

●To verify horizontal and vertical control points with reference of permanent control points.

●Check the site before the start of work and record quantity of existing services Record cut and fills level and crass section.

●Record result of inspection work executed all check shop drawings with contract documents. To check and verify Setting out for road center line and curvets, drainages etc.

●Topographic Survey Project setting out.

●Coordinate locating with the engineers, clients, and others concerned with the projects.

●Determine longitudes and latitudes of important features and boundaries in survey areas.

●Asphalt works.

●As-built preparation for all the services and roads Sign Board marking etc.

●Street light Work marking and Alignment.

●Curb stone setting out and aligning.

●Lay out of structure, formwork and reinforcement

●To attend the weekly and monthly meeting.

1st ORGANIZATION June 2012 to November 2013

Organization Bahira Town (PVT) Rawalpindi

Project: Bahira Town, safari villas & Form Houses.

Position: Land Surveyor

Responsibilities:

Personnel Details:

●Presenting data to clients.

●Advising about technical matters and whether the construction plans are viable

●Topographic Survey.

●Project setting out.

●OGL recording for existing roads.

●Topographical survey and traversing.

●Calculation of coordinate, and horizontal and vertical traverse adjustment.

●Joint Survey for establishing temporary bench mark on site with Contractor.

●Uses of surveying instruments and tools to produce road layouts.

●Performs construction surveys to establish lines and grades within the construction site.

●Keep good daily written records of work performed written records to Office Projects Department.

●Provides topographic surveys of construction site areas & by the survey data can provide horizontal & vertical profile of the roads including vertical & horizontal curves.

●Provides calculations and records in support of all survey activities. Inspects to ensure that proper compliance with construction.

●Topographical survey and traversing.

●Preparation of RFI and data entry coordinates level. etc.

●Checking for all the clashes with the other services

●Layout of the Project as per Drawings (Road Center Line, Parking Area, Walkway and side Drainage system).

●Maintain Levels Record. Piles Work, Excavation Work.

●Recording and Reporting of progress among different players.

●Data collecting from field for as built Drawings

●All type of level instrument works.

●Project setting out.

●Worked for roads in super elevation and transition.

3rd Organization 2 Jan 2018 to till

Contractor =Acciona Agua S. A.

Organization = SAFE TRACK CONTRACTING EST

Project: Al Khobar 1,2 Seawater Reverse Osmosis Desalination Plant.(RO1and RO2)

Position: Senior Land Surveyor

Responsibilities:

Personnel Details:

●Topographic Survey.

●Project setting out.

●OGL recording for existing roads.

●Topographical survey and traversing.

●Calculation of coordinate, and horizontal and vertical traverse adjustment.

●Joint Survey for establishing temporary bench mark on site with Contractor.

●Uses of surveying instruments and tools to produce road layouts.

●Performs construction surveys to establish lines and grades within the construction site.

●Keep good daily written records of work performed written records to Office Projects Department.

●Provides topographic surveys of construction site areas & by the survey data can provide horizontal & vertical profile of the roads including vertical & horizontal curves.

●Provides calculations and records in support of all survey activities. Inspects to ensure that proper compliance with construction.

●Topographical survey and traversing.

●Preparation of RFI and data entry coordinates level. etc.

●Checking for all the clashes with the other services

●Layout of the Project as per Drawings (Road Center Line, Parking Area, Walkway and side Drainage system).

●Maintain Levels Record. Piles Work, Excavation Work.

●Recording and Reporting of progress among different players.

●Data collecting from field for as built Drawings

●All type of level instrument works.

●Project setting out.

●Worked for roads in super elevation and transition.

Personnel Details:

Name : Muqarrab Ali

Father’s Name : Muhammad Yaqoob

Religion : ISLAM

Marital Status : Married

Driving Licence : Valid Licence of K.S.A

Language : English, Arabic, Urdu, Hindi, Punjabi.

Nationality : Pakistani

Iqama : Valid



Contact this candidate