Post Job Free
Sign in

Site Engineer Electrical Supervisor

Location:
Bihar, India
Posted:
July 07, 2022

Contact this candidate

Resume:

RESUME

Mintu Kumar Sharma

Email: *************@*****.***

Mob:+917*********

Objective:

To work in an organization where I can prove my potential at work, can acquire new knowledge & sharpen my skills and put my efforts for achieving organization as well as individual goals. Highlights of Qualifications:

Completing target of all electrical works of building MTMC project as drawing.

Electrical panel commission, cable tray and cable laying, earthing work.

Erection, Dismantle and modification of equipments in 132/25 kv TSS, Railway project.

Working on LT, HT Underground Cable and Control Cable.

Taking care of Installation & commissioning of RTU in 132/33kv GSS.

Immense ability to maintain relationships with coworkers.

Deep ability to coordinate with acting and cultural ambassadors .

Skilled to pay attention to detail and make required decisions.

Vendor, labour handling & their payments.

Prepared complete BOQ, verify quantity and quality. Professional Experience:

Electrical Supervisor-Pasa Resources Pvt. Ltd, Ranchi, India February 2022-present

Electrical works like- modular box installation, conduiting, wiring, different lighting, fan installation of building Manipal Tata Medical College, Jamshedpur project according to drawing.

All electrical panel charging, cat 6 wire laying for data, lan and cctv installation.

Cable tray erection for cable laying as per drawing, LA installation, earthing work for panel and lift.

Knowledge about SLD drawing, power drawing, lighting drawing, DB installation and their dressing.

Site Incharge- Binod Construction, Ranchi, India

June 2021-January 2022

Erection, Dismentaling and modification of equipments in 132/25 kv traction sub station, south eastern railway Orissa.

Cable laying, connection, panel charging and commissioning of control room power panel.

Railway OHE equipments erection and dismental, mast erection and their foundations, knowledge about railway OHE drawings

Site Engineer- Universe Automation Solution, Delhi India May 2018 – June 2021

RTU 132/33 KV Panel Installation, Termination, CT/PT TBs Connection & MFT.

Knowledge of Termination Schedule for Cable Laying and Termination.

Passionate to move site for breakdown & erection and any technical issue work.

Ensured compliance to all safety guidelines in sites.

Knowledge of Relay and CMR Base.

Site Engineer- Eritech Group, Delhi March 2017 – April 2018

experience in the LT, HT Underground Cable Laying & Checking.

Very much familiar with all type of drawings like- SLD etc.

Excellent communication interpersonal skills.

Service Cable Laying for House Hold Purpose.

Three Phase meter fitting in Meter Panel Box.

T-Connector Connecting for different sizes of cable. Trainee Engineer- Meter Reader & Installation.

Spanco Constratech Pvt. Ltd, Kolkata, India Dec

2014 – Jan2016

Project Management and Solution for Rular Area electrification project.

Daily report submission with details & mapping.

Ability to work independently and in team.

Education:

B.Tech in Electrical Engineering, from Bankura Unnayani Institute of Engineering 2010-2014

(Scored-66.9%) Under WBUT.

Personal Dossier:

Date of Birth: 17th May, 1991.

Permanent Address: At-Paphara P.O-Jamu P.S-Markacho Dt-Koderma State- Jharkhand, Pin-825318.

Languages: Hindi, English and Bengali.

Marital Status: Married

Nationality: Indian

Declaration:

I hereby declare that all statements made are true, complete and correct to the best of my knowledge and belief.

Place-Koderma Mintu Kumar Sharma

(Signature)



Contact this candidate