Post Job Free
Sign in

Lead Electrician Facilities Manager

Location:
Fishers, IN
Posted:
July 04, 2022

Contact this candidate

Resume:

Tim Green

***** **** ***** ***, *******, Indiana 46037 317-***-****

I am currently seeking a position in the maintenance management field. I bring a wide variety of knowledge regarding many areas within the maintenance field. I am a high-energy person who believes integrity is key. I am a self-motivated individual who is a quick learner. I pay close attention to detail and I am result oriented. I enjoy finding solutions.

Education

New Castle, Chrysler High School / Building Trades School

All Aspects of the building trades / concentrated on electrical,

I placed high enough in the VICA Regional Trades competition 2years running to compete in the state Electrical Trades competition.

Was VICA class President my junior and senior years.

The first VICA student to achieve the Optimist Citizenship Award for Citizenship and Scholastic achievement.

Many continuing education schools and seminars. There have been a wide verity of subjects from boiler refectory, air compressor maintenance, vacuum Pumps, Thermo formers, Trim press’s, Extruders, can sealers, retorts, high pressure pumps, wastewater management, to Allen Bradley PLC Programming and electrical code and NFPA 70E.

Skills & Abilities

Strong Leader

Critical Facilities Manager

Project Management

Arch-Flash NFPA 70E Training

Safety Training / OSHA 30

Electrical Training

Electrical Troubleshooting

Electrical Controls

Electrical Contracting

Electrical Maintenance / Preventive Maintenance

Equipment Maintenance / Preventive Maintenance

Maintenance Training / Scheduling

Inspection of machinery / electrical equipment

Documentation, MOP’s / SOP’s / maintenance agreements / Change Management

Contractor Oversight / Reliability / cost effective work

Work History

Critical Facilities Manager – on-site

October 2018 – Present

Ascent, LLC.

2350 Ball Drive, St. Louis, Missouri 63146

314-***-****

In this position I direct an assistant and many contractors.

I coordinated and planned work developed MOP’s for work and inspected work.

I procured quotes, developed plans for work, scheduled processed thru the change management system.

This work is for a Data Center for the Financial Industry that needed to be up at all times. This Includes multiple locations.

This requires that all systems are available with back up when needed. There are generators, ATS’s, UPS’s, PDU’s and distribution systems that require preventative maintenance and be assessed regularly. There are also HVAC systems, and Air Compressors that were critical to operation. This is a 24/7 environment.

RESPONSIBILITIES:

Provide on-site field coordination supervision and project management support for the operation of a data center.

Management of mission critical equipment used to operate and maintain a data center.

Management of systems and physical environment integration (life safety, mechanical, plumbing, and power related activities and issues).

Report discrepancies and trends to the operations team and clients.

Manage preventative and emergency maintenance schedules and procedures for building systems; identify back-up and replacement inventory needs for critical systems.

Oversee all maintenance schedules and providers.

Provide on-call support (24x7).

Assist in updates of standard practices consistent for data center operations and equipment.

Oversee and coordinate sub-contractors to assure proper installation of equipment and delivery of maintenance services.

Troubleshoot emergencies, equipment problems, and technical issues, organize and oversee resolutions.

Provide ongoing technical support, management and oversight of vendors as necessary..

Complete inspections and maintenance. Scheduled maintenance may include, but is not limited to, monthly, bi-monthly, quarterly, semi-annually, and annual equipment maintenance.

Provide field technical support related to redundancy, reliability and maintainability for the data center:

Current needs

Long-term objectives and strategic planning

Primary focus on uptime (99.9999%) and cost saving opportunities

Implementation of Change Management Control Program

Method of Procedure (MOP), Standard Operating Procedure (SOP), and Emergency Recovery Procedure (ERP) development

Administrator for onsite Critical Facility Work Rules

Vendor onboarding and familiarization

Safety inspections and adherence to safety policies.

Administrative policies/procedures

Scope of Work standards

Spare parts management

Reporting development

Life Cycle Replacement Strategy

Maintenance Planner at Novipax

2017 - 2018

In this position I directed a 29-person maintenance crew on multiple shifts. Schedule and coordinate work, help with Training of the maintenance crew on numerous systems in the extrusion and thermoforming areas. This training is both electrical and mechanical, including PSM, Arc-Flash, NFPA 70E, Fall Protection, Confined Space, H.S.P. to mention a few. This includes creating manuals and work instructions.

Create and schedule machine PM’s. Give work instructions as needed to be sure work is performed in a safe workman like manner. When possible acquire parts and documentation before maintenance is performed. Look for faster more efficient ways to get the work done. Strive to foster a work environment that helps promote collaboration between everyone working on a project to possibly find a more efficient solution.

Maintenance Project Manager at NOVIPAX

2013 - 2017

Manage projects as directed by the Maintenance Manager.

Investigate and find solutions, obtain quotes, put together plan for approval. When approved implement, track and commission projects. Do any required documentation / training . Keep project operating safety and timely. I have successfully lead projects ranging from over $500,000.00 (Roll Lot Fire Suppression). As complicated as getting an arc-flash study preformed and implemented. Trained all electrical technicians and acquired all necessary tools/equipment to perform work. Most projects have been on budget or under and on time.

Assist / support maintenance with technical problems as required. Help Train Maintenance Employees as needed on various procedures.

Provide electrical assistance pertaining to electrical theory and design, to Maintenance and Production personnel. Develop, trains, and implements standard electrical procedures related to equipment calibration and safety

Insure function and reliability of critical safety systems including; HSP, Evacuation, Security, Fire alarm/Fire suppression, Switchgear, etc. Also assists with local IT related issues

Electrical Project Technician at Sealed Air Food Care - Cryovac

October 1992 - August 2013 (20 years 11 months)

Lead Electrician 15 of the years in this position.

Implemented approximately 75 suggestions of machinery upgrades that I came up with.

Trained other electricians, created training documentation. Trained myself to be a Ballerina control system expert. Tried to learn all other aspects of plant maintenance for utilities and Fire Systems.

Created Training documents for other maintenance personal and was a long-time safety team member.

Electrician at Brooks Foods

May 1979 - September 1992 (13 years 5 months)

Lead Electrician, Electrical Trainer, Maintenance Trainer, Electrical System Design,

Project Manager



Contact this candidate