SUMMARY OF PROFESSIONAL EXPERIENCE
A passionate individual with extensive experience (16+years), in occupation health and safety in construction with multinational, multidiscipline companies on construction of commercial, industrial and infrastructure projects (i.e. High rise buildings, Infrastructure projects, Roads, Bridges, Parking structures Utility systems, Power plants, Petro- Chemical industries projects, Pump stations, Desalination plants) Experienced in developing HSE plans ; providing advice, guidance and support to management for successful HSE implementation; identifying training needs and conducting in-house trainings; reviewing HSE documents; performance evaluation; inspections, audit and investigation; incident / accident trend analysis; interacting and communicating with personnel from multicultural backgrounds. Succeeded in; changing people perception and attitude towards HSE on the projects; minimizing lost time incidents; developing safety awareness at all levels, creating team spirit; and developing better relationship with clients, consultants, and contractors
NEOM The Line Project.
Location: KSA
Client: NEOM
Role: PMC- WSP
Duration: February 2021 to till date
Responsibilities
Development of the Projects health, safety and Environmental Policies and Objectives.
Monitor the compliance of plans, policies, procedures & it’s consistent with the overall goals and objectives of the client.
Plan and participate in conducting periodic audits through review and analysis of performance of HSE records and inspections in compliance with HSE Management System.
Guide & assist the project management in HSE matters.
Assessment, interview & approval of key personnel for consultant & contractor.
Oversees the Safety Personnel in ensuring the Company and its job sites remain hazard and accident free by conducting periodic safety inspections.
Establishing and implementing Strategic plans and objectives of the package and departments in alignment with organization’s vision
Leading HSE campaigns to improve safety standards by improving awareness.
Reviewing supervision consultant submitted safety documents like plans, statistical reports, audit reports & KPI’s
Establishing project KPI’s for PMC & monitor compliance with KPI’s.
Conduct external meeting, internal meetings & management meeting.
Evaluate practices, procedures and facilities to assess risk and adherence to the law.
Participate in drills & highlighting for improvement.
Prepare weekly & monthly reports for management.
Conduct gap & trend analysis based on observations & incident data.
Recommend consultant for improvement based on the analysis.
Leading & coaching Saudi Engineers
JABAL OMER DEVELOPMENT COMPANY:
Project: Jabal Omer Development Project Makkah
The Jabal Omar Development project situated on 57 acres, includes 37 towers with a total built-up area of 2 million square meters (21.5 million square feet) of space, including hospitality, residential, retail, commercial and religious facilities.
Position: HSE Manager
Responsibilities
Responsible to Implement, execute, and ensure compliance JODC Health, Safety and Environmental program, policies and procedures.
To Lead execution of the site's annual HSE Plan
Responsible to Lead inspections and management walkthroughs to ensure and examine HSE compliance and to ensure continual improvement
To Participate and act on HSE audits, Emergency Drills and HSE related Events
To Build capability of site resources to support implementation of HSE program.
Responsible to manage site-wide system, Program Elements and processes, to identify and evaluate hazards (risks), and implement effective controls (corrective/preventive solutions).
Responsible to Oversight and audit Operation and Maintenance systems.
To Lead incident investigation process, including root cause analysis and identification of corrective action plans.
To Interface with regulatory bodies (MOL, MOH, CIVIL DEFENSE, ETC.) Facilitate the completion of a site-wide annual HSE training plan.
To Participate in formal HSE reviews of existing equipment modifications, new equipment purchases, and changes in site processes.
Ensure that required regulatory permits are acquired, that reports are submitted to regulatory agencies, and any site permit conditions (e.g. sampling, recordkeeping) are met.
Hill Intl. Middle East (Project Management Consultant)
Lead HSE Engineer
Project: Jabal Omar Development Project Makkah. KSA
Aug 2014 to 31st Dec 2017
To Develop & maintain HSE Manual, Plan, Procedure, training & communication system
Hazard Identification & risk assessment
Plan, facilitate, record, track and Coordinate the HSE workshops, trainings & meeting for JODP
Plan and Conduct Audit, Inspection & accident investigation
Supervision of consultant & Contractor, analysis of their performance.
Review of Consultant and contractor project HSE plan
Achievement:
Completed 20 Million safe man hours at Jabal Omer Development Project
Development of unify HSE management system for five major contractors and four supervision consultants as project reference manual.
Awarded best performance certificate from the client (Jabal Omer Development)
Bin Laden Group
Project HSE Manager
Since Sep 2012 to July 2014
HARRAM EXPANSION PROJECT
Central Utility Complex and Security Buildings
Responsibilities:
Ensures that all construction activities are conducted in strict adherence to HSE standards, Ensure the implementation of the HSEMS in compliance with International standards, Participate in formulating HSE Plans & procedures for all types of operations as per client requirement & local HSE legislation, Ensures implementation & compliance with the HSE plans & procedure, Participate in defining HSE Strategies for the entire project & HSE review design studies, Participate in developing emergency response plan in the event of any incident, Participate in establishing HSE monitoring & audit program applicable to all phases of operations, Identify & report all non - compliances and follow up actions, Promote HSE awareness amongst the workforce and participate in regular site meetings with subcontractors on HSE matters relevant to the project, Identify HSE sensitive areas and design mitigation measures, Review of method statements/Risk Assessments, Participate in site/accommodation/office residential HSE inspection/tour/sampling/survey, Participate in assigning HSE Supervisors/Officers at the work site to ensure effective HSE Coverage of all activities, Participate in incident investigation meetings, Review of weekly HSE Performance, Managing incident action tracking register till close out are ensured, Maintaining of lesson learnt from incident register & dissemination of these lessons through bulletins/alerts/posters, Participate in weekly management HSE meetings with subcontractors, etc.
ButecCo Abu Dhabi
HSE Sr Engineer
from July 2009 To Sep 2012
EPC SHAH GAS DEVELOPMENT PROJECTABU DHABI (EPC Oil & Gas Project UAE)
Client: SAIPEM.
Responsibilities:
-Responsible for implementing, upgrading and administering the corporate HSE plan and its related procedures.
-Create a positive HSE attitude amongst project employees.
-Provide specialist advice & education on safety matter.
-Provide the necessary interface with the CLIENT/CONSULTANT safety personnel
-Carry out survey and inspections on a regular basis in association with supervision to ensure that safe working practices are in operation
-Assist the training for all levels of employees to promote awareness of injury prevention and damage control.
-Ensure the compliance of ISO-14001 and OSHAS-18001 and its documentation
-Safety Motivational Activities: To organize safety competitions, Safety quiz, Safety week celebrations, National Safety Day celebration, etc.
-Safe Work Procedures: Development and monitoring of compliance of safe work procedures. Few procedures developed are Plant Change Management, Safe use of Scaffolds and Ladders, Mechanical Isolation, Safe Work Permit System, Entry in to Confined Spaces, etc.
Power Flow Engineering LLC UAE
Site HSE Manager from Oct 2008 To July 2009
D.6881 Water Supply to ADCO-GASCO Facilities at ASAB Oil Plant (Pipe Line Project).
American Construction Company Limited
HSE Engineer from 10.04.2008 to10.10.2008
FRONTIER CROPS TRAINING CENTRE (BLACK WATER PROJECT)
Ikan Engineering Services
HSE Engineer from 04.03.2007 to 08.04. 2008
Saudi Aramco Contractor
HSE Engineer from Nov 2005 to Dec 2006
Saudi Aramco Oil and Gas Pipe Line Projects:
-CN 651*******-Tie in of 8” ANDR-529 F/L to ANDR GOSP 1
-CN 651*******-Tie in of 8” SDGM-479 F/L to SDGM GOSP-5
-CN 651*******-Tie in of 8” SDGM-489 F/L to SDGM GOSP-1
OGDCL Oil and Gas development Corporation Limited
HSE Engineer from Feb 2004 To Oct 2005
(Dhakni Oil Processing Plant Attock Pakistan (Oil & Gas Pipe line Project)
LAKSON TOBACCO COMPANY Mardan PAKISTAN
HSE Engineer
Aug 2003 to Feb 2004
Tobacco processing plant
Education:
-B.E Mechanical 1999 to 2003
Member of Pakistan & KSA engineering council.
Courses& Certificates:
-BSC International Diploma in Occupational, Health & safety Level 6
-NEBOSH International General Certificate in Occupational Safety & Health (TUV NORD ABU DHABI UAE)
-OHSAS 18001 Lead Auditor (Diversely Consulting Jeddah KSA)
OSHA 10 Credit Hours Training from Pure Safety USA
-Well site preparation and Drilling safety (OSH Academy)
-Oil spill Cleanup (OSH Academy)
-Oil and Gas Safety Management OSH Academy
-Well Site Completion and Servicing Safety OSH Academy
-CIEH Level 4 in Health and Safety in workplace Diversy Jedda KSA
-Saudi Armco Certified HSE Engineer. (SAUDI ARAMCO)
-Loss prevention Certificate (Saudi Armco)
-ADDC certified (ADDC Abu Dhabi UAE)
-H2S Gas test training (SAIPEM TRAINING)
-BASIC FIRE FIGHTING (Emirates Technical & Safety Development Centre UAE)
-BASIC FIRST AID (Emirates Technical & Safety Development Centre UAE)
-Attend IMS (Integrated Management System ISO 9001, ISO 14001 & OHSAS 18001) Training.
Personal Data
Date of birth: 10-04-1980
Nationality: Pakistani
Languages: English, Pashtu, Urdu, Arabic, Hindi, Punjab