Post Job Free

Resume

Sign in

Project Manager Water District

Location:
Princeton, TX
Salary:
140000
Posted:
June 24, 2022

Contact this candidate

Resume:

Glenn P. Estacio

Project Manager

**** ****** ****, *********, ***** 75407

Mobile: 808-***-****/626-***-****

Email: adric9@r.postjobfree.com

WORK EXPERIENCE:

Company Name: Garney Construction

Address: Leonard, TX

Title/Position: Quality Control/Assurance Manager

Inclusive Dates: November 4, 2019 to April 2022

Projects Undertaken/Handled

Position: Quality Control/Assurance Manager

Inclusive Dates: November 2019 – April 2022

Project Title: Bois D'arc Lake - WTP And Pump Stations Project (CMAR) North Texas Municipal Water District

Location: Leonard and Bonham, Texas

Contract Cost: $ 417,800,000

Project Description: This project includes pre-construction, procurement, and construction services for a water treatment plant with ultimate capacity of 280 MGD, two 70 MGD pump stations, a storage tank, and water and sewer pipelines. Also includes deep excavations, electrical, and paving.

Projects Undertaken/Handled

Position: Quality Control/Assurance Manager

Inclusive Dates: August 2020 to April 2022

Project Title: Sister Groove Regional Wastewater Resort Recovery Facility and Outfall Piping

Location: New Hope, Texas

Contract Cost: $ 329,271,086.61

Project Description: This project includes pre-construction, procurement, and construction services for wastewater treatment plant with ultimate capacity 16 million gallons per day (MGD). This facility includes liquid treatment process facilities, solid handling process facilities, peak flow handling facilities, and plant operation support facilities. Liquid treatment process facilities will include tankage and structures, piping, equipment, electrical power supply and distribution facilities and other items associated with preliminary treatment (raw wastewater screening and grit removal), primary treatment (clarifiers and sludge pumping); tertiary treatment (filtration) and disinfection (ultraviolet light). Solid handling process facilities will include open peak flow basins and associated drain pumping stations. Operations support will include an operations control building (administrative offices, wastewater laboratory, control room, and operator convenience facilities) and a maintenance storage building. Also, this facility will consist of approximately 26,000 linear feet of 78-inches or 96-inches diameter outfall pipeline from the facility site to permitted receiving waters at Stiff Creek, with an outfall dispersion structure at Stiff Creek.

Duties & Responsibilities:

Reviews all QC matters with Operations on all stages of construction, beginning with the submittals, Three (3) phase meetings and implementation and close-out.

Facilitates establishment of project specific quality control plans with the project team.

Reviews, evaluates and checks contract documents for discrepancies as the work is progresses and notifies appropriate persons of conflicts, deficiencies and discrepancies.

Facilitates Subcontractors’ pre-construction meetings along with the project team.

Coordinates and schedules with project team timely testing and certification of all building systems’ testing requirements prior to turn over of the project to the Owner.

Aggressively manages project schedule to ensure all project deadlines are met or targets are achieved.

Responsible for implementing and maintaining the Quality Control Program to ensure all work is performed in accordance with the plans, specifications and the approved Quality Control Plan and in a safely manner.

Performs daily quality control inspections of all on-going work to ensure compliance with contract requirements.

Coordinates with subcontractors and vendors on all material submittals requiring approval from either the Designer or the Owner. Reviews and facilitates approval of all submittals for contract compliance and submits to the approving authority.

Prepares and submits detailed Daily Quality Control Reports.

Coordinates all testing requirements for materials, factory tests and manufactures' certifications.

Maintains accurate records of all quality control operations, activities, testing and inspections performed on site.

Maintains accurate As-Built drawings on a regular basis.

Reviews close-out procedure to confirm all quality control issues have been addressed and resolved.

Coordinates turn-over and acceptance procedure and schedules with all concerned.

Manages, directs and organizes project teams (design to construction phases) that are assigned on on-going and to be assigned to upcoming projects.

Oversees project teams and field managers.

Reviews and approves cost estimates and project budgets for implementation.

Reviews work programs and construction schedules.

Reviews and approves Change Notices on the project

Reviews all phases of work to ensure that everything is within prescribed time frame and cost per plans and specifications and performed in a safely manner.

Reviews and approves manpower and equipment schedules and keeps track of logistics and procurement of materials.

Reviews & assesses project status/progress to identify problem areas that needs to be attended to and find solutions to problems encountered.

Plans, executes and manages all facets of the construction operation.

Manages and ensures proper execution of project contract.

Conducts regular meeting with all project teams, managers and supervisors

Recommends to project teams potential improvements and innovations relevant to the project implementation.

Represents the company in meetings, coordination and negotiation with outside entities such as Government agencies related with all existing and prospective projects.

Reports directly the President of the Company.

Company Name: Index Builders, Inc.

Address: 1019 Lauia Street, Unit 3 Kapolei, HI 96707

Title/Position: Operation Manager/Project Manager

Inclusive Dates: July 1, 2016 to November 1, 2019

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: April 2015 to November 2019

State Project Number: AO1041-13

AIP Project Number: 3-15-005-118

Project Title: Terminal Improvements to Shuttle Station Gates 6-62 at Honolulu International Airport Honolulu, Hawaii

Location: Honolulu, Hawaii

Contract Cost: $ 12,518,575.00

Project Description: The scope of work consists of addition of new skylights, rain screens, reroofing work, flooring work, and lighting improvements at the Diamond Head and Ewa side Wiki-Wiki Bus Stations, and other miscellaneous work as indicated on construction documents.

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: October 2016 to November 2019

State Project Number: AO1035-17

Project Title: HNL DH Concourse Improvements Honolulu International Airport

Location: Honolulu, Hawaii

Contract Cost: $ 9,003,100.00

Project Description: The scope of work consists of ceiling removal and replacement on the third floor of the Diamond Head Concourse including, but not limited to, removal and replacement of the fire sprinkler heads, ducts and air devices, light fixtures, security devices and hazardous material abatement. Additional work includes fireproofing of some existing steel beams, road trenching work to tie-in fire sprinkler lines to existing underground water lines, and pipe chase enclosures for fire sprinkler risers

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: July 2016 to December 2017

State Project Number: AO1035-17

Project Title: State Capitol Building Replace Upper Roof

Location: Honolulu, Hawaii

Contract Cost: $ 6,700,000.00

Project Description: Work is generally consisting of replacing the upper roof which includes removing an adhered sheet membrane, demolishing and removing original ceramic tile and membrane. The work requires demolishing and removing skylight infill installed, removal of existing drain bowl, removal of mosaic tiles at soffit, spall repair. After all the demolition works, the finishes are installation of new PVC membrane, installation of new area drain, installation of new soffit cement plaster with integrated color finish and paint finish. At the four-mechanical core, part of the work is; grind all calcium deposit to bare concrete, replacement of roof hatches, replacement of ladders, installation of PVC membrane, installation of water proofing and finish paint on walls.

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: August 2016 to June 2017

Project Title: Kaneohe Community Senior Center Various Exterior and Structural Repair

Location: Honolulu, Hawaii

Contract Cost: $ 1,091,700.00

Project Description: Various exterior activities are replacement of existing roof for the three building and two walk way canopy. Standing seam metal roof is the new roof installed. Part of the activity are installation of new skylight and new gutters, removal and replacement of decayed eaves soffit and building wood siding and paint to match existing.

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: December 2016 to February 2017

Project Title: Repair Football Stadium Bleachers and Renovation of Library

Location: Mililani High School, Mililani, Hawaii

Contract Cost: $ 2,608,850.00

Project Description: Work are demolishing existing bleacher, spall repair, Installation of ADA spots and installation of new bleachers and railing. Remove and replace air-conditioning units and repainting of the school library.

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: August 2016 to June 2017

Project Title: Renovation of Auditorium and Library

Location: Kapiolani Community College (KCC-UH), Hawaii

Contract Cost: $ 4,518,698.00

Project Description: Remove and installed new air-conditioning unit of library and auditorium. Remove and installed resilient flooring of the auditorium. Remove and installed new carpet. Remove and installed new lighting fixture. Repainting of auditorium and library. Asphalting of parting area. Stripping of parking area.

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: December 2016 to March 2017

Project Title: DOTH Job No. H.C. 10558 Repair Roof

Location: Pier 10-11 Shed Honolulu, Oahu, Hawaii

Contract Cost: $ 1,300,100.00

Project Description: Scope of work consisted various roof repairs at the Pier 10 and 11 Shed. Major work items included repair and replacement of termite damaged and deteriorated wood members, corroded steel beams, and delaminated concrete column as well as removal of hazardous material from the facility.

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: April 2016 to November 2017

Project Title: DAGS Job No. 12-33-7607 Improvement of Ho’opono Buildings A & B Air-conditioning, restroom, roof, and other.

Location: Honolulu, Hawaii

Contract Cost: $ 1,491,100.00

Project Description: Scope of work consisted patching of holes in plaster ceilings, installation of new floor drains and cover in basement men’s restroom, repainting of rusted drain lines and improvement of basement and building B restrooms, removal and replacement of courtyard slab, repair of planter wall, replacement of windows in home management office. Re-roofing of Building A, modernization of courtyard and courtyard restroom, replacement of window mobility training room. Improvement of wall covering and sound insulation, improvement of building walls in building A & B. Installation of additional acoustical insulation and new wall to minimize noise in basement office. Patching of walkway cracks, replacement of canopy and repainting wood column beam.

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: July 2016 to November 2017

Project Title: Free Standing Restaurant Building (Jollibee) with Drive-thru and Parking

Location: Kamakana Ali'i Shopping Center Kapolei, Hawaii

Contract Cost: $ 4,600,000.00

Project Description: Construction of free-standing restaurant building with drive-thru facility and patio. Construction of building involved verification of locations for proper care in excavation of the area, demolition and removal of all concrete curbs, structures, pavement for the new concrete foundation and structural steel framing. The building includes custom glass work, metal stud, gypsum board, doors, finish hardware, acoustical ceiling, resilient flooring, painting, new water line system, insulation, HVAC, fire sprinkler, fire alarm systems, telephone and data systems.

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: January 2019 to May 2019

Project Title: Renovation of Free Standing Restaurant Building (Jollibee) with Drive-thru and Parking Location: Daly City, California

Contract Cost: $ 3,500,000.00

Project Description: Construction of free-standing restaurant building with drive-thru facility and patio. Construction of building involved verification of locations for proper care in excavation of the area, demolition and removal of all concrete curbs, structures, pavement for the new concrete foundation and structural steel framing. The building includes custom glass work, metal stud, gypsum board, doors, finish hardware, acoustical ceiling, resilient flooring, painting, new water line system, insulation, HVAC, fire sprinkler, fire alarm systems, telephone and data systems.

Projects Undertaken/Handled

Position: Project Manager

Inclusive Dates: January 2019 to September 2019

Project Title: Renovation of Various School Package

Location: Waianae, and Waipahu, Hawaii

Contract Cost: $ 5,718,516.00

Project Description:

Nanakuli Elementary School

Location: 89-778 Halakea Ave. Waianae, Hawaii

Scope of Work: Remove, Supply and Install New Airconditioning Units, Electrical Lighting Fixtures at the Library. Supply and Installed window grilles on all window building. Repainting of Building B classrooms and Library.

Waianae Elementary School

Location: 85-220 McArthur St. Waianae, Hawaii

Scope of work: Remove, Supply and Install New Airconditioning Units, Electrical Lighting Fixtures at the Library. Supply and Installed window grilles on all window building. Repainting of Building 4 classrooms and Library.

Waianae High School

Location: 85-251 Farrington Highway, Waianae, Hawaii

Scope of Work: Remove, Supply and Install New Airconditioning Units, Electrical Lighting Fixtures at the Library. Supply and Installed window grilles on all window building. Repainting of Administration Building classrooms and Library. Asphalting of Parking and Stripping.

Waipahu Elementary School

Location: 94-465 Waipahu St. Waipahu, Hawaii

Scope of Work: Remove, Supply Airconditioning Units and Electrical Lighting Fixtures of 10 classrooms at Pre-school Building. Repair of windows of Pre-school building. Repainting of All the classroom at Pre-school.

Waipahu Intermediate School

Location: 94-455 Farrington Highway Waipahu, Hawaii

Scope of work: : Remove, Supply Airconditioning Units and Electrical Lighting Fixtures of Library. Supply and Install Grilles on the airconditioning units. Repainting of Library.

August Ahrens School

Location: 94-1170 Waipahu St. Waipahu, Hawaii

Scope of Work: Asphalting and stripping of main Parking Area

Duties & Responsibilities:

Overall management of on-going projects.

Negotiate, prepare and approve buyouts.

Supervises and oversees project team and field managers.

Reports directly to the company CEO.

Reviews and approves cost estimates for implementation

Review and approve work programs and schedules.

Reviews and approves Change Notices of the project

Reviews all phases of work to ensure everything was within prescribed time frame and cost per plans and specifications.

Conducts weekly meeting with the project organization.

Reviews and approves manpower and equipment schedules and keeps track of logistics and procurement of materials.

Reviews & assesses status of projects to identify problem areas that needs to be attended and find solutions to problems encountered.

Plans, executes and manages all facets of the construction period.

Manages and regularly meet with the project team to ensure proper execution of project contract.

Recommends to project team potential improvements and innovations relevant to the project that may be implemented.

Company Name: Talion Construction, LLC

Address: 819 Moowaa St., Suite 106, Honolulu, HI 96817

Title/Position: Program Manager/Project Manager/Construction Quality Control Manager

Inclusive Dates: November 1, 2015 to June 30, 2016

Duties & Responsibilities:

Manages, directs and organizes project teams (design to construction phases) that are assigned on on-going and to be assigned to upcoming projects.

Oversees project teams and field managers.

Reviews and approves cost estimates and project budgets for implementation.

Reviews work programs and construction schedules.

Reviews and approves Change Notices on the project

Reviews all phases of work to ensure that everything is within prescribed time frame and cost per plans and specifications and performed in a safely manner.

Reviews and approves manpower and equipment schedules and keeps track of logistics and procurement of materials.

Reviews & assesses project status/progress to identify problem areas that needs to be attended to and find solutions to problems encountered.

Plans, executes and manages all facets of the construction operation.

Manages and ensures proper execution of project contract.

Conducts regular meeting with all project teams, managers and supervisors

Recommends to project teams potential improvements and innovations relevant to the project implementation.

Represents the company in meetings, coordination and negotiation with outside entities such as Government agencies related with all existing and prospective projects.

Reports directly the President of the Company

Title/Position: Project Manager/Construction Quality Control Systems Manager (CQCSM)

Inclusive Dates: May 1, 2015 – October 31, 2015

Duties & Responsibilities:

Reviews all QC matters with Operations on all stages of construction, beginning with the submittals, Three (3) phase meetings and implementation and close-out.

Facilitates establishment of project specific quality control plans with the project team.

Reviews, evaluates and checks contract documents for discrepancies as the work is progresses and notifies appropriate persons of conflicts, deficiencies and discrepancies.

Facilitates Subcontractors’ pre-construction meetings along with the project team.

Coordinates and schedules with project team timely testing and certification of all building systems’ testing requirements prior to turn over of the project to the Owner.

Aggressively manages project schedule to ensure all project deadlines are met or targets are achieved.

Responsible for implementing and maintaining the Quality Control Program to ensure all work is performed in accordance with the plans, specifications and the approved Quality Control Plan and in a safely manner.

Performs daily quality control inspections of all on-going work to ensure compliance with contract requirements.

Coordinates with subcontractors and vendors on all material submittals requiring approval from either the Designer or the Owner. Reviews and facilitates approval of all submittals for contract compliance and submits to the approving authority.

Prepares and submits detailed Daily Quality Control Reports.

Coordinates all testing requirements for materials, factory tests and manufactures' certifications.

Maintains accurate records of all quality control operations, activities, testing and inspections performed on site.

Maintains accurate As-Built drawings on a regular basis.

Reviews close-out procedure to confirm all quality control issues have been addressed and resolved.

Coordinates turn-over and acceptance procedure and schedules with all concerned.

Job Description: Performs three phases of construction control, coordinates the construction process with the Government & subcontractors. Ensures that scopes- of- work are performed in accordance with contract plans and specifications. Ensures that works are performed in accordance with pertinent and applicable rules and regulations such as the Unified Building Code and other national and local guidelines and standards. Ensures that the implementation of the project is in compliance with the contract plans and specifications, actively promoting and supporting the quality control program at the project site. Ensures that the appropriate and required testing program is implemented, evaluated, reviewed, monitored and documents results. Initiates stop-work or re-work items for non-compliance and ensures the implementation & documentation of corrective actions. Inspects and documents all materials that were received to ensure compliance with contract documents. Facilitates submittal process, including technical data for materials, designs and plans. Ensures that all submittals meet the contract and project requirements and that they are submitted to the Reviewer/Approving Authority as required in a timely manner. Additional responsibilities, include schedule and coordination of meetings, Conducts Quality Control Meetings, inspections & enforcement of safety program and performs daily inspections and reports, witness all testing requirements, Prepares Change Orders & Extra Works.

Projects Undertaken/Handled:

Position: Project Manager/Quality Control Systems Manager –

Inclusive Dates: July 2015

Contract No.: 62478-13-D-4007/Task Order #0022

Project Title: Replace Chiller at B-654/Replace Window AC at B-2110H

Location: JBPHH, Oahu, Hawaii

Contract Cost: $ 1, 614, 186.00

Project Description: The general scope of work involves selective demolition on the existing AC piping system, replace existing chiller with new and associated piping, controls, electrical distribution, lighting fixtures, fire-stopping, concrete in-fill and patching, thermal insulation, paints and coatings. Work involves site preparation, demolition, excavation and backfilling for utilities systems. Work includes all testing, commissioning & certifications, clean up and any other incidental items necessary to complete the work.

Position: Project Manager/Quality Control Manager –

Inclusive Dates: May 2015 to July 2015

Contract No.: 62478-13-D-4007/Task Order #0005

Project Title: Replace Sewer Force Main at PS-1696

Location: Kaneohe Marine Corps Base Headquarters, Oahu, Hawaii

Contract Cost: $ 1, 130, 664.00

Project Description: The general scope of work involves installation of new piping to replace an existing 8-in asbestos cement sewer force main from Sewer Pump Station 1696 (PS 1696) to the existing sewer line running along Harris Avenue. Work involves site preparation, demolition, excavation and backfilling for utilities systems. Work includes all testing, certifications, clean up and any other incidental items necessary to complete the work.

Company Name: Nan, Inc.

Address: 636 Laumaka St., Honolulu, HI 96817

Title/Position: Quality Control Systems Manager

Inclusive Dates: August 2011 to April 30, 2015

Duties & Responsibilities:

Reviews all QC issues with Operations at all stages of construction beginning with the submittals, Three (3) phases of control meetings and implementation.

Reviews close out processes to confirm all quality issues have been inspected and resolved

Facilitates establishment of a project specific quality control plan with the project team

Monitors contract documents and checks for discrepancies as the work progresses and notifies appropriate persons of conflicts and discrepancies.

Facilitates Subcontractors’ pre-work meetings with support from the project team

Coordinates with project team schedules for timely testing and certification of all building systems testing requirements prior to turn-over of the project to the Owner.

Aggressively manage project schedule to ensure all project deadlines are achieved.

Responsible for implementing and maintaining the Quality Control Program to ensure all work is performed in accordance with the plans, specifications and the approved Quality Control Plan.

Performs daily quality control inspections of all work in progress to ensure compliance with contract requirements.

Coordinates with subcontractors and vendors on all material submittals requiring approval from either the Designer or the Owner. Reviews and approves all submittals and checks for contract compliance and then submits to the approving authority.

Prepares and submits detailed Daily Quality Control Reports.

Coordinates all testing requirements for materials, factory tests and manufactures' certifications.

Maintains accurate records of all quality control operations, activities, testing and inspections performed on site.

Maintains accurate As-Built drawings on a weekly basis.

Implements company safety policy.

Job Description: Perform three phases of construction control, coordinating the construction with the Government & subcontractors. Ensure the works is performed in accordance with contract specifications, pertinent building codes & practices, national and local standard. Ensure the implementation of contract and plans, actively promoting and supporting the quality control program at project sites. Ensure the appropriate and required testing program is implemented, evaluate, review, monitor and document results. Initiate stop work or re-work for non-compliance and ensure the implementation & documentation of corrective action. Inspect and document the receipt of all materials to ensure compliance with contract documents. Facilitate the submittal process, including materials, designs and plans. Ensure the submittals meet the contract and project requirements and submitted to the client as required in a timely manner. Additional responsibilities, include coordination of meetings, Conduct Quality Control Meeting, inspect & enforcing safety program and performing daily inspection and reports, Witness all Testing Requirements, Prepare Chance Order, Extra Works, Schedule, and Monthly Billing.

Projects Undertaken/Handled:

Position: Construction Quality Control Systems Manager

Inclusive Dates: March 2013 to April 2015

Contract No.: 62478-13-D-4007/Task Order #0016

Project Title: Joint POW/MIA Accounting Command (JPAC),

Location: JBPHH, Oahu, Hawaii

Original Contract Cost: $ 65, 000,000.00

Final Contract Cost: $ 85, 000,000.00 ++

Project Description: The scope of work involves the construction of a three-story building to house the new JICPAC Headquarters with supporting facilities. The structure was built on concrete piles/spread footings, concrete ground floor slab, hollow core planks with concrete topping, precast concrete exterior walls, structural steel, metal fabrications, finish carpentry work, metal roofing, metal wall panels, modified bitumen sheet roofing, roof insulation, flashing and sheet metal, doors, aluminum windows, curtain wall and glazed assemblies, architectural finishes, building specialties, hydraulic elevators, fire suppression system (Wet Pipe Fire Sprinkler System, Pre-action Fire Sprinkler System, and Clean Agent Fire Extinguishing System FM200), fire alarm and mass notification system, plumbing, air conditioning and ventilation, emergency generators, photovoltaic panels system, intrusion detection control system, close circuit televisions, security control system, laboratory ( Autopsy system, Surgical Lights, Fume hoods, Cat-Scan, X-ray, Cold Storage, & many other equipment to complete DNA analysis), electrical work, telecommunication and incidental related work. Supporting facilities include landscaping, asphalt concrete pavements, concrete pavements, water feature, chain link fence and gates, connecting utilities, sewer lines (including Tie-in), storm drainage structures, subsurface detention systems, Overhead and underground electrical Lines, telecommunications (including four (4) Miles of trenching), photovoltaic panels and supporting structures, and miscellaneous site improvements.

Position: Project Manager/Construction Quality Control Manager

Inclusive Dates: September 2012 to February 2013

Contract No.: 62478-07-D-4007

Project Title: Renovation of MCBH Officers Club Swimming Pool

Location: MCBH, Kaneohe, Oahu Hawaii

Contract Cost: $ 1,100,000.00

Project Description: The general scope of work involves the Selective Demolition; Waterproofing; Installation of Tiles; Renovation of Pumphouse, Remove and replace process piping, pumps, vacuum, and strainers; Install pre-form trench drain.

Position: Project Manager/Construction Quality Control Manager

Inclusive Dates: January 2012 to August 2012

Contract No.: 62478-07-D-4007

Project Title: Upgrade Electrical and Fire Alarm Bldg. 661

Location: PH Sub-base, JBPHH, Oahu Hawaii

Contract Cost: $ 3, 100,000.00

Project Description: The general scope of work involves the selective demolition, carpentry work, interior electrical distribution, light fixtures, alterations on the mass communication system & fire alarm systems, including firestopping, patching and caulking, painting. Work includes all testing, commissioning & certifications, clean up and any other incidental items necessary to complete the work.

Position: Project Manager/Construction Quality Control Systems Manager

Inclusive Dates: November 2011 to December 2011

Contract No.: 62478-07-D-4007

Project Title: Upgrade RTF Station Renovation

Location: Lualualei, Nanakuli, Oahu, Hawaii

Contract Cost: $ 5, 700,000.00

Project Description: The general scope of work involves the demolition of the existing switch gear, transformer banks and enclosure, construct a one (1) room operators office station, HAZMAT, civil utilities, earthwork, architectural, structural, concrete work, masonry, EFS/EIFS, Misc. metal fabrication & installation, gypsum board ceiling and wall partitions, installation of split-type AC system, interior electrical distribution,



Contact this candidate