OGUNYALE SUNDAY OLANREWAJU
WORK EXPERIENCE EDUCATION
CABLE SATELITE TECHNICIAN
Custom Communication Incorporated Nocross GA
August 2020-Nov2020
FACILITY MAINTENANCE MANAGER
2Ray Gas Station
January 2018 – August 2020 College Park, Georgia PROJECT MANAGEMENT TECHNOLOGY
• Plan and promote the daily schedule of employees
• Create and maintain budgets
• Coordinate with and report to management
MAINTENANCE ENGINEER PHYSICS WITH ELECTRONICS
Westin Hotels
March 2017 - October 2017 Indianapolis
• Intercom Maintenance, General Facility Maintenance
• Gust/Customer Room Support Services
TEAM LEAD, TECHNICAL SCIENCE TECHNOLOGY
ZTE Nigeria Limited
December 2011 - May 2016 Maitama, Abuja
Zone roll out work
•Manage BSS/IPRAN implementation activities in SS& SE
•Manage PMC/PCP supervisors
•Manages 3G rollout activities.
•Manages LTE rollout exercise in SS region.
Scheduling of site activities
•Review and approve Site specific drawings (site lay out + equipment installation drawings) coming from
service suppliers
•Organizes kick-off meetings for starting sites
Service supplier interface
•Manage service supplier teams (TI)
•Prepare together with cost and progress engineer purchase orders for site works to service suppliers
•Follow up service supplier performance
Meetings and reporting
•Follow up and report the work progress related to time schedule and quality to regional roll-out manager
•and escalate the deviations
Documentation
•Support set up and follow up documentation processes as set up by regional project manager
TI SUPERVISOR, (NSN)
Nokia Siemens Networks
January 2011 – November 2011 Ikoyi, Lagos
•Installation, commissioning and Integration of Nokia Siemens Flexi BTS Series, Siemens Flexi BSC,
Siemens Flexi Hopper series
•Operation ‘support systems’ to client
•Maintenance of Nokia Siemens BSS equipment
•Telecom Implementation Supervision
FIELD SERVICE ENGINEER
LM Ericsson Nigeria Limited
October 2010 – January 2011 Ebeano, Enugu
•Perform BSC and BTS node commissioning, integration and maintenance,
•Installation, Commissioning and Integration of Ericsson RBS 6000 series
•Ericsson BBU Swap and Upgrade.
•Operational experience of digital cross-connects systems and site integration
•identifying base station sites for system coverage provision and perform site surveys with other
network implementation teams in order to verify suitability of the sites for zoning, acquisition and
construction
•Relates with client project engineers to ensure the deployment of an optimum system thereby making
sure that service coverage is in line with the objective and the strategy adopted by the service providers
•Troubleshooting of the BTS and BSC related problems on Motorola related BSS equipment
•Co-ordination of all assigned network site construction activities from startup meetings to site handover
******.********@*****.***
College Park, Georgia
Dedicated specialist with a well-earned reputation for delivering unequal service in work practices and according to specifications with proven expertise and strong ability to secure reliability, increase performance and introduce operational efficiencies whilst working in a team environment with multiple priorities and tight deadlines.
A highly organised professional with years of demonstrated success as an engineer. A hardworking, resourceful and ambitious individual with extensive understanding of engineering theories and their practical applications
HND MInstP
2015-2017
Federal University Of Technology Akure. (FUTA)
Post Graduate Program
1996 – 1998
Federal Polytechnic Bida
Higher National Diploma
1993 – 1995
Federal Polytechnic Bida
National Diploma
TRAINING CERTIFICATION
Member, Project Management Institute. (PMI)
Member, Institute of Physics, London (MInstP)
Member, Awarding Body of International Occupation
Safety and Health (ABIOSH), HSE
ZTE Nigeria Training
(General Overview of ZTE iBSC; Configuration and Integration of ZTE SDR; ZTE 3G & LTE General overview; Overview of MTN site standard and specification)
Motorola Training Centre (Lagos)
(Motorola BSS 11 [BSS Operational Theory] Training – August,
1997; Motorola SYS 02 [Introduction To BSS & GPRS Database]
ZTE Training Centre (Abuja/China)
(Network Planning and Optimisation Training; BSS Installation Techniques; CDMA [MSS & BSS] Overview; GSM [MSS & BSS] Overview; GSM & CDMA Power System overview; Optimisation Techniques; Configuration of CDMA Terminals; General Overview of WiMax Technology; Microwave Transmission Planning, Survey,
Design and Implementation using Pathloss 4.0; General knowledge of Tools used for Survey and Optimisation
OGUNYALE SUNDAY OLANREWAJU
TRACK RECORDS
EXPERIENCE
TEAM LEAD, TX/BSS IMPLEMENTATION ENGINEER
Motorola Tanzania Limited
May 2008 – February 2009 Dar Es Salam, Tanzania
•Supervision of Vodacom/Motorola Tanzania 81 Turnkey BTS site expansion project and Integration of same on the BSC
•BTS and BSC site survey for site roll-out
•Installation, configuration, cross connection to GB link and integration of Motorola PCU for 3G GPRS service
•Configuration and Integration of Ericsson Access Radios (Minilink and Traffic Nodes)
•BSC, BTS and XCDR configuration, commissioning and integration
•Turnkey project site supervision and Inspection, conduction of CA, PAC and FAC and site handover to the operator/client
•Ericsson Traffic Node Configuration for Microwave Transmission Mini Link
•Identifying base station sites for system coverage provision and perform site surveys with other network implementation teams in order to verify suitability of the sites for zoning, acquisition and construction
SENIOR TX/BSS ENGINEER
Motorola Nigeria Limited
June 2007 – April 2009 Victoria Island, Lagos
•BSC, BTS and XCDR Configuration, Commissioning and Integration
•Turnkey project site supervision and Inspection, conduction of CA, PAC and FAC and site handover to the operator/client
•Troubleshooting of the BTS and BSC related problems on Motorola related BSS equipment
•Relate with field staff in resolving problems related to call failures, coverage related issues by rendering support services and also solving the problem remotely at the BSC
•BTS/BSC troubleshooting if there is any bad performance in the network
•Coordination of all assigned network site construction activities from start up meetings to site handover
•Supervision of access radio installation and regional network roll out
•Coordination of all BSS Implementation projects within the region
•Performs earth test on earthing points before any installation is done on the site
BSS ENGINEER
ZTE Nigeria Limited
May 2005 – May 2007 Maitama, Abuja
•Identifying base station sites for system coverage provision and perform site surveys with other network implementation teams in order to verify suitability of the sites for zoning, acquisition and construction
•Supervision of turnkey site deployment and supervision for Mtel Nigeria, Min of Comm. Rural Telephony Project (NRTP),Intercellular Networks etc.
•Installation, commissioning and integration of MSS and BSS equipments
•Performs drive test
•The configuration of cell sites physical and radio resources and their PCM interface port at the BSC from the OMC-R (Operation and Maintenance Centre)
•E1 Integrity Test through Loop back and Bit Error Rate Tests
NETWORK ENGINEER
Globenet Nigeria Limited
December 2001 – December 2004 Ikoyi, Lagos
•Identifying base station sites for system coverage provision and perform site surveys with other network implementation teams in order to verify suitability of the sites for zoning, acquisition and construction
•Supervision of turnkey site deployment and supervision for Mtel Nigeria, Min of Comm. Rural Telephony Project (NRTP),Intercellular Networks etc.
•Installation, commissioning and integration of MSS and BSS equipments
•Performs drive test
•The configuration of cell sites physical and radio resources and their PCM interface port at the BSC from the OMC-R (Operation and Maintenance Centre)
•E1 Integrity Test through Loop back and Bit Error Rate Tests
WIRELESS NETWORK ENGINEER
Taylor Communication Solutions Networks
January 2001 – November 2001 Street Broad, Lagos
•Project planning and site survey
•Implementation and support service of IPLC, DPLC and ILL for organizations like SITA, Econet Wireless, Linkserve, and System Worldwide
•Implementation of Wide Area Network for institutions like Standard Trust Bank, SITA, Prudent Bank, First City Monument Bank, Statoil, Amadeus, Transact travels, etc.
•Configuration and Installation of diverse kinds of modem like Motorola codex modem, RAD modem, Pandatel, Multitech used on Leased circuit for WAN data communication
•Telecommunication Cable Network Design
•Installation and configuration Multiplexers (MUX) and Encryptors used on E1 fiber optics
ACCOMPLISHMENTS
-Successfully managed and supervised the swapping of over 2000 BTS and Ericsson NodeB from MTN Nigeria Networks to ZTE SDR
-Successfully managed and supervised the swapping of over 1099 Huawei hybrid power systems to ZTE Hybrid power systems in MTN Nigeria Networks Regions.
-Manages Telecom equipment deployment and Integration and making sure the site meets the required KPI for FAC
-Configuration, Commissioning and integration of Nokia Siemens Networks Flexi BSS Equipment
-Installation, configuration, cross connection to GB link and integration of Motorola PCU for 3G GPRS service.
-Installation, Commissioning and Integration of Ericsson RBS 6000 series.
-Ericsson BBU Swap and Upgrade.
-Configuration and Integration of Ericsson Access Radios (Minilink & Traffic Nodes)
-Performed Microwave Transmission design and Implementation for ZTE in Mtel Nigeria GSM project and National Rural Telephony CDMA Project using Pathloss 4.0
-Identified base station sites for system coverage provision and perform site surveys with other network implementation teams in order to verify suitability of the sites for zoning, acquisition and construction for ZTE in Mtel Nigeria GSM project.
-Performed inter-cell and intra-cell site optimization for Network performance
-Commissioning and Integration of several Motorola BSC & XCDR on Zain Nigeria Networks
-Involved in implementing high performance operational wireless networks which include initial RF network design, re-design, regular design reviews, RF build verification, system RF acceptance, optimization and continuous technical support to all deployment teams
-Team Leader in Installation, Commissioning and Integration of ZTE ADSL using DSLAM on NITEL PSTN
-Commissioning and integration of over 100 sites in Vodacom Networks in Tanzania
KEY COMPETENCIES
Interpersonal
Communication
Analytical
Multi-Tasker
High Autonomy
New Challenges
Highly organised
Problem-solving