Post Job Free
Sign in

Mechanical Engineer / Piping Engineer

Location:
Mandaluyong, Philippines
Salary:
USD $10000 TAX FREE
Posted:
June 17, 2022

Contact this candidate

Resume:

*** *. ***** ******

Barangay New Zaniga

Mandaluyong City, 1550

Philippines

Mobile Number: +63-945-***-****

+63-920-***-****

+63-919-***-****

Telephone Number: +63 2 8532 0701

Email Add:

***************@*****.***

PROJECT ENGINEER (TANK/SMP)-RONALDO B. NORIEGA

Summary

Highly motivated and results driven Mechanical Engineer with more than Twenty three (23) years of extensive experience in the field of inspection, supervision, erection, fabrication & engineering works involving plant piping, tank, structural, mechanical, cross country pipeline and vessels intended primarily for oil and gas construction. Fully conversant with all relevant International Engineering Standards

(API, ASME, ANSI, SAS, ASTM and AWS) and with firm understanding of all HSE practices.

RELEVANT EXPERIENCE: CHICAGO BRIDGE & IRON COMPANY (CB&I) - 25 Apr 1994 to 29 Mar 2017 Experience

Sep 26, 2016 to Mar 29, 2017 CB&I Contractors Pty Ltd (Australia) Chevron - Wheatstone LNG Plant Project

Onslow, Western Australia

May 12, 2014 to Sep 7, 2016 CB&I Kentz Joint Venture CKJV (Australia) Chevron - Gorgon LNG Plant (ME&I) Project

Barrow Island, Western Australia

Sr. Project Engineer (SMP)

Commissioning Works (Testing and Re-instatement)

Assisting Commissioning Manager and Commissioning Superintendent (Testing and Re- instatement works).

Preparation of test package and do line checking for customer approval and acceptance prior for testing.

Line checks prior for test packages and give necessary information to the commissioning group. Make punch listing of all outstanding materials & reinstatement of supports, guides and other missing materials.

Preparation of method statement, testing procedure, testing plan, exclusion zoon prior for testing (hydro test and pneumatic test).

Sub-system walk down with the Client (Chevron/KJVG/Bechtel) for acceptance & signature or sign off.

Red spade installation and technical coordination with Pre-com.

Attending coordination meetings with client project meetings.

Prepares daily report and submit to Commissioning Project Manager.

Implementation of safety guidelines.

June 17, 2012 – Sep 1, 2013 CB&I Thailand Ltd.

Fabrication Shop and Assembly Area:

8 CB&I Projects in different Country

119/82 Moo. 4, T. Plutaluang Sattahip

Chonburi 20180, Thailand

Sr. Project Engineer (Tank & SMP)

Fabrication & Assembly Works

Assisting Facility & Shop Manager and Facility & Shop Superintendent.

Management of sub-contractors, supervisors and labor performing SMP installation work.

Coordinate the construction aspect of projects from tender phase through to handover.

Coordinate to all Field Engineer’s all work package prior for fabrication and assembly of tank, spools, equipment and structural.

Coordinate to engineering department all redline mark-up drawing’s, revision drawing’s and as-built drawings.

Coordinate & follow up to procurement department all material’s need in the project as per purchase order (structural, piping, equipment and tank plates).

Prepares daily report and submit to Project Manager.

Assisting and supervising the sub-contractor and do inspection of sphere shell plate fabrication (dishing, lay-outing, cutting and final inspection and checking prior for shipping).

Involvement of planning, work pack development and JHA preparation.

Implementation of safety guidelines

Dec 27, 2010 – Feb 27, 2012 CB&I EAME DUBAI

Erection of (22) Misc. Storage Tanks

Ruwais Refinery Expansion Project

Samsung Engineering Company Ltd. Project,

Package #3 Offsite & Utilities

Ruwais, Abu Dhabi, U.A.E

Construction Supervisor (Tank)

Erection Works:

Assisting Project Manager, Site Superintendent, Project Engineer and Site Supervisor.

Preparation of project document’s, method statement, inspection test plan, project schedule, project plan matrix, material shipment and others document need for customer approval.

Daily meeting with the Superintendent, Project Engineer’s, QA/QC & Safety Supervisor about Safety, Quality and Productions.

Coordinate to engineering department all redline mark-up drawing’s, revision drawing’s and as-built drawing’s as per site condition.

Preparation of test package for customer acceptance prior for hydro test.

Raise Request for Information (RFI) and field instruction (FI) for customer approval.

Supporting field crew where Engineers / drawing clarification required construction.

Attending coordination meetings with client project meetings.

Preparation of materials delivery prior for tank erection, piping erection and structural erection

Oversee the installation of mechanical, piping and structural projects within the refinery.

Coordinate the construction aspect of projects from tender phase through to handover

Prepares daily report and submit to Project Manager.

Implementation of safety guidelines.

Fabrication & Assembly Works (Structural):

Management of sub-contractors, supervisors and labor performing structural assembly work.

Coordinate the construction aspect of projects from tender phase through to handover.

Coordinate to all Field Engineer’s all work package prior for fabrication tank roof plates, bottom plates and structural.

Coordinate & follow up to procurement department all material’s need in the project as per purchase order structural, piping, equipment and tank plates.

Prepares daily report and submit to Project Manager.

Implementation of safety guidelines.

Apr 7, 2010 – Nov 27, 2010 CB&I Eastern Anstalt Qatar Commissioning Works (38 Misc. Tanks, including Piping, Structural and Equipment)

Shell Pearl - Harbor GTL Project

Ras Laffan, Qatar

Mar 8, 2009 – Mar 7, 2010 CB&I Peruana S.A.C.

Commissioning Works (Testing & Re-instatement Works) Peru LNG SRL, Peru LNG Export Project

Pampa Melchorita, Peru

Construction Supervisor / Sr. Project Engineer (Tank & SMP) Commissioning Works (Testing and Re-instatement)

Assisting Commissioning Manager and Commissioning Superintendent (Testing and Re- instatement).

Preparation of test package for customer approval and acceptance prior for testing and re-instatement.

Preparation of method statement, testing procedure, testing plan, exclusion zoon prior for testing.

Line checks prior for test packages and give necessary information to the commissioning group. Make punch listing all outstanding materials & reinstatement of supports, guides and other missing materials.

Sub-system Walk down with the Client acceptance and sign off.

Red spade installation and technical coordination with Pre-com.

Attending coordination meetings with client project meetings.

Prepares daily report and submit to Project Manager.

Implementation of safety guidelines.

Feb 14, 2008 – Jan 19, 2009 CB&I Eastern Anstalt

Erection of 2 Units of 50.0M dia X 40.5M High DWFC Ammonia Storage Tank

Snamprogetti S.P.A. (SP) Project

Qafco-5 Project – Qatar Fertilizer Company

Mesaieed, Qatar

Construction Supervisor/Site Superintendent (Tank foundation/Piling & Concreting) Civil Works:

Assisting and supervising the subcontractor for soil investigation, ground leveling, piling works, test pile & production pile and concrete pouring for tank foundation.

Daily meeting with the Sub-contractor Managers, Superintendents, & QA/QC about Safety, Quality and Productions.

Attending coordination meetings with client project meetings

Preparation of method statement, piling procedure, excavation plan, exclusion zoon prior for digging.

Prepares daily report and submit to Project Manager.

Implementation of safety guidelines.

Oct 10, 2007 – Feb 13, 2008 CB&I Eastern Anstalt

Re-bottom of 1 unit of 16.0M dia X 2.5M High Cone

Roof Tank (Live Plant)

Krupp Uhde Project

Qafco-4 Expansion Project - Ammonia Storage Tank

Qatar Fertilizer Company, Mesaieed, Qatar

Nov 13, 2006 – Oct 9, 2007 CB&I Eastern Anstalt

Erection of 1 unit of 20.0M dia X 24.1M High CRT

BEMCO Project - Thermal Energy Storage Tank #2

West Bay District Cooling Plant #2

Doha, Qatar

July 17, 2006 – Nov 12, 2006 CB&I Eastern Anstalt

Preparation of Project (1 unit of 20.0M dia X 24.1M High Cone Roof Tank)

BEMCO Project - Thermal Energy Storage Tank #2

CB&I Eastern Anstalt, Ennoc House 2

Dubai, UAE

Dec 8, 2005 – Apr 9, 2006 CB&I Eastern Anstalt

Erection of 1 unit of 18.0M dia X 25.0M High CRT

Bemco Project - Thermal Energy Storage Tank #1

West Bay District Cooling Plant #1

Doha, Qatar

Construction Supervisor (Tank including piping and structural) Erection Works:

Assisting Project Manager, Site Superintendent and Project Engineer.

Preparation of project document’s, method statement, inspection test plan, project schedule, project plan matrix, material shipment and others document need for customer approval.

Daily meeting with the Superintendents, Engineer’s, Supervisor’s QA/QC, & Safety Supervisor’s about Safety, Quality and Productions.

Coordinate to Engineering department all redline mark-up drawing’s, revision drawing’s and as-built drawing’s as per site condition.

Preparation of test package for customer acceptance prior for hydro test.

Raise Request for Information (RFI) and field instruction (FI) for customer approval.

Supporting field crew where Engineers / Drawing clarification required construction.

Attending coordination meetings with client project meetings.

Prepares daily report and submit to Project Manager.

Preparation of materials delivery prior for tank erection, piping erection and structural erection.

Preparation of bottom plates, roof plates, piping, structural and other accessories prior for tank erection.

Oversee the installation of mechanical, piping and structural projects within the refinery.

Coordinate the construction aspect of projects from tender phase through to handover

Implementation of safety guidelines.

June 3, 2005 – Dec 7, 2005 CB&I Eastern Anstalt

2 unit 125,000 MT DWFC Propane Tank and (2) 110,000 MT DWFC Butane Tank

CMSA LNG Plant Project

RasGas LNG Plant Project

Ras Laffan, Qatar

July 9, 2003 – Apr 29, 2005 CB&I Nigeria Limited

TSKJ LNG Plant Project

Nigeria LNG Project - Train #4 Project

River State, Bonny Island, Nigeria

Apr 14, 2003 – July 8, 2003 CB&I EAME Dubai

Erection of 6 units of 60.0M dia. X 18.0M High H2O Tank Marubeni-Taisei Consortium Project

Shuweihat Water Transmission Scheme Project

Lot-D Mussafah Pumping Station

Mussafah, Abu Dhabi, U.A.E.

Aug 2002 – Dec 2002 CB&I Philippines Inc.

Erection of 2 units of 12.5M dia. X 10.0M High CRT and 1 unit of 45.0M dia. X 24.0M High CRT

Total Fina Elf Corporation Project

Alas-asin, Mariveles, Bataan, Philippines

Project Engineer (Tank & SMP)

Erection Works:

Assisting Area Construction Manager and Site Superintendent.

Preparation of project document’s, method statement, inspection test plan, project schedule, project plan matrix, material shipment and others document need for customer approval.

Coordinate to Engineering department all redline mark-up drawing’s, revision drawing’s and as-built drawing’s as per site condition.

Preparation of test package and do line checking for customer acceptance prior for testing.

Raise and submission of documents to customer approval (RFI & FI).

Supporting field crew where Engineers / Drawing clarification required construction.

Preparation of materials delivery prior for tank erection, piping erection and structural erection.

Do lay-outing and leveling of tank foundation prior for tank erection.

Preparation of bottom plates, roof plates, piping, structural and other accessories prior for tank erection.

Coordinate the construction aspect of projects from tender phase through to handover.

Prepares daily report and submit to Project Manager.

Implementation of safety guidelines.

Feb 20, 2002 – June 15, 2002 CB&I Malaysia SDN. BHD. JMSB-KMSB-SIME Consortium Project

Malaysia LNG Train #6 - MLNG Tiga Plant Project

Bintulo, Sarawak, Malaysia

Apr 27, 2000 – Dec 19, 2001 CB&I Overseas LLC-Singapore

*Demolition and Rebuild of 1 unit of Boiler and 5 Misc. Vessel (Repair Works Internal only)

Singapore Olifens Project

Jurong Island, Singapore

*(2) 36.0M dia. X 24.0M High FRT (Bottom Repair)

*(1) 42.0M dia. X 30.0M High FRT (Roof Repair)

ExxonMobil Project - Singapore Pty Ltd Project

Pulau Pesek, Jurong Island, Singapore

*Erection of 1 unit of Gas-Oil Tank including piping and equipment

Turnkey Project

Petro Chemical Corporation of Singapore Project

Pulau Ayer Merbau, Jurong Island, Singapore

June 22, 1997 – July 22, 1998 CB&I Constructors South Africa Pty. Ltd.

*Erection of 8 Misc. Tanks (including piping and

structural)

Saldanha Steel Plant Project

Saldanha, South Africa

*Erection of 4 Misc. Tanks (including piping and struct’l) Caltex Capetown Refinery Project

Capetown, South Africa

June 22, 1996 – May 10, 1997 CB&I Eastern Anstalt

*Erection of 12 Misc. Floating Roof Tanks (including piping and structural)

Equate Petroleum LNG Project

Fahaheel, Kuwait

*Erection of 2 Misc. Floating Roof Tanks (Including piping and structural)

Texaco LNG Project

King Fahad Road, Kuwait

Nov 23, 1994 – Nov 23, 1995 CB&I Eastern Anstalt

Erection of 22 Misc. Tanks (including piping and

structural)

Chiyoda Japan Company Project

Qatargas LNG Plant Project and Qatargas Upstream

Development Project

Ras Laffan, Qatar

Sr. Field Engineer (Tank / SMP)

Erection Works:

Assisting Area Construction Manager, Site Superintendent, and Site Supervisor.

Coordinate to Engineering department all redline mark-up drawing’s, revision drawing’s and as-built drawing’s as per site condition.

Preparation of test package and do line checking for customer acceptance prior for testing.

Raise and submission of documents to customer approval (RFI & FI).

Supporting field crew where Engineers / Drawing clarification required construction.

Attending coordination meetings with client project meetings.

Preparation of materials delivery prior for tank erection, piping erection and structural erection.

Do lay-outing and leveling of tank foundation prior for tank erection.

Preparation of bottom plates, roof plates, piping, structural and other accessories prior for tank erection.

Coordinate the construction aspect of projects from tender phase through to handover

Carefully reviews method statement, ITP’s, construction drawings and survey information to make sure an area is stable enough to support a tank structure.

Planned site walks and ordered all necessary materials needed for projects.

Participated in client meetings resolved client and management project issues.

Supervises the works of the tank/ piping fabricators including ironworkers / erectors / welders, crane operators, helper, etc. to ensure that the work to be performed is completed on schedule and to the standards and specifications required.

Coordinate labor and resources to make sure that deadlines are met.

Prepares daily report and submit to Project Manager.

Implementation of safety guidelines.

Apr 25, 1994 to Nov 1994 CB&I Philippines Incorporated Caltex Project (Piping Works)

CB&I Warehouse

San Pascual, Batangas

Philippines

Field Engineer Trainee / PWHT Technician

PWHT Technician Works:

Assisting Site Superintendent, Welding Supervisor and Project Engineer.

Report all Post Weld Heat Treatment (PWHT) daily progress report to QA/QC Manager.

Preparation of all documentation for submission for customer approval and acceptance.

Preparation of spool & equipment for post weld heat treatment (PWHT).

Implementation of safety guidelines.

Skills/Training/ Workshops Attended:

General Machine Shop, National Manpower & Youth Council, Mariveles, Bataan, Philippines – 1989

APC-1 CB&I (Philippines), Batangas Warehouse – November 1994

Philippine National Red Cross- Standard First Aid Training – June 1999

Philippine National Red Cross – Basic Life Support (CPR) Training – June 1999

APC-1 CB&I Overseas LLC-Singapore – September 11 – 16, 2000

SIPP 1 & 2 CB&I EAME (Dubai) – January 23 to 28, 2011

Mobile Crane Safety General Training (CB&I EAME Dubai) – May 16, 2011

CKJV – Work safely at Heights – May 20, 2014

Chevron – Incident, Injury Reporting and Actioning – May 16, 2014

Chevron – Managing Fatal Risks – May 16, 2014

Chevron - Hazard and Risk Management – March 2, 2015

Chevron - Permit to Work for Work Team Leader – March 3, 2015 Computer skills:

Knowledge of Microsoft Office Applications (MS Word, Excel, PowerPoint, Project etc.) and various in-house developed software programs as gained through hands on experience. Also, familiar with drafting packages like Smart Plant Review (SPR), & Navis Works (simulation). Educational attainment:

Bachelor of Science in Mechanical Engineering - Year 1988 Manuel Luis Quezon University

Hidalgo Street, Quiapo, Metro Manila, Philippines

REFERENCES:

Mr. Ulysses Egaran Mr. Regel Almodiel

Digital Operations & Tender Manager Project Manager Clough Australia THAI OIL Project

*******.******@***********.*** Atlantic Gulf and Pacific Philippines *****.********@*********.***

+63-998-***-****

Mr. Alex Noguerra Mr. Limuel Macatangay

Area Construction Manager Project Engineer

Clough Australia Golden Pass LNG, NCSA Construction ****.********@*****.*** Cell: +1-337-***-****

Mobile - +61-448-***-*** ******.**********@*********.*** 3752 S.Gulfway, Sabine Pass TX 77655

USA

Mr. Sergio Saludo Mr. Alan Mendoza

Project Manager Project Manager

McDermott International Inc. (UAE) McDermott International Inc. (UAE) *******@*********.*** ********@*********.***

Office - +971-*-******* Mobile - +971-**-***-****

Mobile - +971-***-***-***



Contact this candidate