Post Job Free

Resume

Sign in

Electrical Engineer Facilities

Location:
Nepal
Posted:
June 13, 2022

Contact this candidate

Resume:

RESUME OF SANAT KUMAR KHATRI

(Electrical Engineer)

Cell: 009**-********

E-mail: adrdyc@r.postjobfree.com

(Available at Qatar with valid QID and NOC)

OBJECTIVE

An endeavor to establish myself as a successful dynamic professional in electrical engineering field with the entire inherent caliber within me. I wish to polish myself to such an extent that I may cope with any work environment in the competitive world of highly skilled technical brains of the present and coming era.

PERSONAL PROFILE

Name : Mr. Sanat Kumar Khatri

Father's Name : Mr. Dhruba Bahadur Khatri

Nationality : Nepali

Date of Birth : 29

th

June, 1987

Marital Status : Married

Languages Known : Fluent English, Nepali & Hindi.

License : Qatar Driving License

(Vaccinated against Covid-19 with Janssen vaccine) EDUCATIONAL QUALIFICATION

COMPUTER SKILLS:

Excellent command in MS-Office, MS-Excel, MATLAB Software, Basic knowledge in CAD, C and C++.

Page 1 of 6

DEGREE OBTAINED BOARD/UNIVERSITY YEAR PASSED DIVISION/GRADE B.E. (Electrical)

Institute of Engineering, Pulchowk campus,

2011

First (78. 27% )

Tribhuvan University

+2 (Class XII STD.) H.S.E.B 2006 Distinction (77%) S.L.C. (Class X Std.) H.M.G. Nepal 2004 First ( 73.75 % ) PROFESSIONAL PROFILE:

Bachelor Degree (B.E in Electrical Engineering with more than 8 years of professional experience in fields like facilities management, Repair and Maintenance of EHV Cables, Electrical Power Transmission/Distribution Cabling & Fiber Optic Cable Installation etc. Worked successfully on various Industrial and Commercial organizations ensuring smooth operation, maintenance and timely completion of various construction projects with strategizing techniques for effective utilization of manpower and equipments. An effective communicator and a team leader with excellent analytical and problem-solving skills and also experience of managing limited resources optimally.

The general details of the work as Electrical engineer done are: 1. Maintenance of electrical equipment and other building infrastructure. 2. Planning and Coordination for maintenance schedule for various equipment. 3. Monitoring and inspection for firefighting equipment. 4. Determining facility and equipment specifications. 5. Estimation of project cost and preparation of budgets. 6. Gathering drawings, manuals etc for efficient installation/repair works 7. Preparation of Standard operating procedure.

8. Planning and co ordination with different departments for outage schedule. 9. Maintenance and repair of EHV cables during any type of fault. 10. Cable Route Survey, Existing Utility & Route feasibility study by taking corridor availability criterion.

11. Knowledge of various Site Acceptance Tests (SAT) Procedures for the EHV Cables and Joints.

12. Awareness on the Cable Current Carrying Capacity Calculation (CCC) and the Thermal Backfilling / Trench Cross Sectional Design. 13. Preparation of method of statement for various operations. 14. Assists in document submittal to clarify various comments raised by client/consultant.

15. Knowledge of road crossing procedure by open cut and HDD methods. 16. Successfully Executed Projects involving Re-laying of existing XLPE & Oil Filled Cables and Oil Filled to XLPE Transition Joints. 17. Well versed in Qatar Standards and Procedures for obtaining permissions and approvals from various Governing Bodies.

18. Effective planning and utilization of available resources like equipments, machinery and manpower for a successful and profitable execution of the projects handled.

19. Carried out various projects for internationally renowned cable manufacturing companies as LS Cable, SAUDI CABLE and MITSUBISHI Cables etc for cable ratings vary from 11kV to 220kV.

20. Knowledge on the various stage wise Qualification Inspections Procedures & Check lists (Erection Control Forms).

21. Knowledge on Pre-commissioning testing Procedures, Fault Locating and Repairing for EHV-UG Cables.

22. Technical interaction with Clients, Consultants and Suppliers / Vendors. Page 2 of 6

23. Knowledge of freezing and window cut technique to determine the oil leakage section for oil filled cable,

24. Knowledge to identify the shutdown cable.

25. Knowledge of repair of oil leak from cable joints and cable sealing ends. 26. Good idea of shut down procedure for fault repair. 27. Good idea about electrification design for the residential houses and industries. 28. Good idea on BOQ Items, Rates and Invoicing for the Works Done WORK EXPERIENCE / HISTORY

More than 9 years of experience in working with different Electrical Power Generation, Transmission, Maintenance and Communication Infrastructure Development Projects in Saudi Arabia, Qatar & Nepal. Duration: Nov 2019 to till date.

Company: Hotel Kailashkutee

Position:

Facilities Engineer

Country: Nepal

Working as Facilities Engineer with Hotel Kailashkutee . Duration:

November 2017 to May 2019.

Company:

Siemens

Position:

Engineer

Country:

Qatar

Worked as Engineer with Siemens, Qatar.

Duration:

April 2016 to July 2017.

Company:

KEC

Position:

Senior Electrical Engineer

Country:

Saudi Arabia

Worked as Senior Electrical Engineer with KEC International Limited, Saudi Arabia.

Page 3 of 6

Duration:

2011 August to 2015 July.

Company:

Kemco Electrical & Mechanical Est., Qatar

Position:

Engineer

Country: Qatar

Worked as Engineer with KEMCO (Kemco Electrical and Mechanical EST.) Qatar, for EHV Oil Filled Cable repair and maintenance work as Main Contractor for KAHRAMAA (Qatar general electricity and water Corporation) on various cables routes all over Qatar and EHV & HV underground cable installation Main contractor for LS cable, Saudi Cable, NCC etc. DETAILS OF PROJECTS HANDLED

From November 2017 to Till May 2019

Contract no : GTC/643A & 643D/2014 Phase 12 Substations

(Laying of 66KV XLPE power cable between Ain Khalid S/s – Ain Khalid North S/s to Umm Al Seneem-1 S/s: Laying of 66 KV XLPE power cable between Ras Abu Aboud Super S/s- Khalifat-2 S/s.)

Client : Kahramaa

Main Contractor : Siemens

Consultant : ENERGO PROJEKT ENTEL

From April 2016 to July 2017

Contract no

: 440******* Construction of 132 KV D/C UGTL between PP-2& PP1

Client : National Grid

Main Contractor : KEC

Consultant : Palace Consulting Engineers

Page 4 of 6

From March 2014 to July 2015

GTC 528/2013 : Extension for LV cables

Client : KAHRAMAA, Qatar

Main Contractor : KEMCO

From September 2012 to March 2014

GTC 428/2011 : Repair and maintenance of EHV oil filled cable Client : KAHRAMAA, Qatar

Main Contractor : KEMCO

Received appreciation letter from KAHRAMAA for the work done for repair of damage cable by third party.

From June 2012 to September 2012

GTC 394/2010 : 66 kV Underground Cable Laying between Ras Abu Aboud Super S/s to Doha Land-1 S/s.

Client : KAHRAMAA, Qatar

Main Contractor : Saudi Cable Company

Consultant : ENERGO PROJEKT ENTEL

From Feruary 2012 to June 2012

GTC 213/2008 : 11 kV Cable laying

Client : Qatar Petroleum, Qatar

Main Contractor : LS Cable

Consultant :

From August 2011 to February 2012

GTC : Under Ground Cable diversion work at Mesaieed Substation.

Client : KAHRAMAA, Qatar

Main Contractor : Saudi Cable Company

Consultant : ENERGO PROJEKT ENTEL

From December 2010 to August 2011

National Trading : Worked as a design engineer for residential houses Page 5 of 6

REFERENCE:

MR. SANJAYA SHAH

Manager, Projects

P.O.Box : 2642, KEMCO

DOHA, QATAR

Phone No. :66523786

E-mail: adrdyc@r.postjobfree.com

MR. VARUN KRISHNAN

Manager

P.O.Box : 616, KEC International

Jeddah, Saudi Arabia

Phone No. :009**-*********

E-mail: adrdyc@r.postjobfree.com

MR. ASLAM KADUR

Manager

Siemens

Phone No. : 009**-********

E-mail: adrdyc@r.postjobfree.com

Mr. Manoj Shrestha

HOD

Phone No.: 00977 986*******

Page 6 of 6



Contact this candidate