CURRICULUMVITAE
NOEL V. DE GUZMAN
Mobile Phone Nos. +965******** +639*********
E-mail address: **.***.********@*****.***
Position Applied For:
ELECTRICIAN / ELECTRICAL TECHNICIAN
ELECTRICAL SUPERVISOR
Objective: To be a part of a team that could boost company’ standard in terms of Project Monitoring, Quality Assurance & Quality Control, Inspection, Document management, Supervised and System mechanical completion in the field of construction regarding Electrical lead to Handed over to client.
Nationality: Filipino
EDUCATION, QUALIFICATIONS & TRAINING DETAILS
TITLE
EDUCATION
BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING
Holy Angel University, Angeles City, Philippines
1985 – 1990
QUALIFICATIONS
REGISTERED MASTER ELECTRICIAN
Philippines Professional Regulation Commission
Licensed No. : 0015112-95
INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERS OF THE PHILIPPINES NATIONAL MEMBER
Holy Angel University Chapter, Philippines
SPECIALIZED TRAINING / SEMINARS
BOSHIET,INCLUDING EBS,SAFETY induction,sea SURVIVAL,HUET WITH EBS,FIRE fighting and self rescue TECHNIC,with OPITO approved
Safety induction course including fire theory and the practical use of fire extinguishers – ABV ROCK GROUP, SSSP project, safety dept., site no. 6, may 2, 2001,auto cad training,work permit training course as per ARAMCO requirements
Review and training about specification and standards SABIC and ARAMCO plus NEC,IEC and ISO standard requirements .
SYNOPSIS OF PROFESSIONAL WORK EXPERIENCE
Almost 22 years experience of establishing product compliance with respect to quality specification and standards by means of engineering & construction, inspection, servicing and testing, operations and maintenance services in the field of oil and gas, petrochemicals, building structures, Substation buildings, water treatment plant, power plant, logistic buildings, hotels, hospitals, accommodations, mosque and gasoline station with telecommunications buildings, as well as various electrical instruments and instrumentations including transformers, motor control center, switchgear, distributed control system, HVAC unit, cathodic protection system in the Arabian gulf region and Asian country. Continued electrical upgrading is applied up to present to enhance more electrical engineering innovations and technology/including maintenance operation of oil and gas in off-shore and on-shore industry.
Trainings and Seminars:
PULSE safety leadership for the workforce
IMS /EMS/OSHA/QMS
H2S Awareness and Safety Training
Basic Safety Training (Elementary First Aid & Basic Fire Fighting)
BOSIET and HUET Training for offshore industry
Work permit receiver and issuer safety Orientation
Safety induction
Auto cad training
Testing and commissioning
LOTO induction training
SUMMARY OF EXPERIENCE;
Self Employed : From March 2020 to Present
Company: FDH Fluor Daewoo Hyundai Eng’g and Construction.
Date inclusive: May 2017 - January 31, 2020
Kuwait/ KIPIC Project +965********
Position Held: Building Electrical Supervisor
Duties and Responsibilities
Engineering drawing coordination
Preparation of materials or BOQ bill of quantities needed.
Preparation of shop drawings
Review ERFI drawing and discrepancies.
Review Method statement and ITP
Review IFCUN drawings.
Review markup drawings as per site condition.
Preparation of monthly, weekly and daily progress report.
Review plan drawings, project standards, specification and requirement prior to scope of work contract.
Modify drawings and prepare redline as built for revision.
Overseeing and Supervision of electrical and instrument installation of equipment, cable trays, Conduits and supports system, Grounding system and Lighting system, EICS communication system, and F&G fire alarm system.
Monitor construction progress and preparation of report.
Review mile marker correspond to weekly and monthly progress
Maintain the Quality for assurance of during inspection and execution,
Quality punch list corrective action arrangement preparation.
Attending Tool box meeting prior for Safety standard requirements
Attending Minutes of meetings, Engineering meeting and Construction coordination meeting.
Coordination with progress activities to all involved personnel.
Coordination of wòrk activity/discrepancies into other discipline.
Material coordination and inspection.
Supervision of Testing and commissioning of 34.5KV to 600V//480/230V SWGR. Low voltage SWGR, Motor, other equipmen Punch list preparation prior for MC walk down.
Supervision of Punch list clearing Supervision prior for Precom and Energization.
Company: DANSUNG Engineering and Construction
Tashkent,Uzbekistan
Tel . no. 009***********/ +998*********
Assignment: UKAN/LUKEOIL project POWER
Inclusive Dates: July 26, 2016 to November, 2016
Position Held: Electrical Field Engineer/Supervisor
Duties and Responsibilities
Engineering planning coordination
Preparation of materials or BOQ bill of quantities needed.
Preparation of schedules and daily progress report.
Review plan drawings, project standards, specification and requirement prior to scope of work contract.
Modify drawings and prepare as built for revision.
Overseeing and Supervision of electrical and instrument’ Installation of equipment, cable trays, Conduits and supports system, Grounding system and Lighting system communication system, and fire alarm system, and instrument devices.
Maintain the Quality for assurance of during inspection and execution,
Arrange Tool box meeting prior for Safety standard requirements.
Minutes of meetings and Construction meeting Coordination.
Coordination with progress activities to all involved personnel.
Preparation of shop drawing for as built.
Coordination of activities into other discipline.
Material coordination and inspection.
Supervision of Testing and commissioning activity for Substation from low voltage 24V to High voltage 34.5KV
Company: GS NEOTEK Company limited
Jubail lndustrial city.KSA 31961
Tel . no. 009***********
Assignment: /Technip, KEMYA project
Inclusive Dates: March 2014 to September, 2015
Position Held: Electrical Engineer/Supervisor
Duties and Responsibilities
Preparation of drawing and schedules
Review plan drawings, project standards and requirement prior to scope of work contract.
Preparation of documents drawings and modification for as built drawings in accordance with ITP and CMS,
Doing the inspections of work progress for process area and Substation up to 34.5 KV with clients.
Overseeing and Supervision of electrical and instrument installation of equipments 34.5KV to 600V//480/230V SWGR,XFMR,PANEL BOARDS, control panels, Grounding system and Lighting system, communication panel,instrument panel and fire alarm system
Preparation of materials takeoff and needed on site,
Preparation of schedules and progress reports,
After completion execute punch clearing and Initiate the testing and commissioning of equipment
Maintain the Quality for assurance of during inspection and execution,
Tool box meeting of Safety implementations with full responsibilities.
Attending meetings and Coordination with progress activities to clients, subcontractor and to all involved personnel
Overseeing the construction,Pre com for Substation and Control Buildings.
Supervision of punch clearing prior for Energization.
Supervision of Testing and commissioning of 34.5KV to 13.8KV/6KV/ 600V//480V/24V SWGR. Low voltage SWGR, Motor, other equipment
Company: NOOR ADVANCE ENGINEERING AND CONTRACTING COMPANY
P.O. box 3446, Prince Bin Abdul Aziz street Al Khobar, 31952 Kingdom Of Saudi Arabia
Tel.: +966*-*******
Assignment: Logistic Buildings High rise Hotels, Hospitals, Printing press, Accomodation buildings and 16 storey Training Center Industrial project
Inclusive Dates: June 2013 to January 31, 2014
Position Held: Electrical Engineer
Duties and responsibilities;
Attending meeting and discuss progress activities
Review plan drawing and rectification of discrepancies
Estimates materials and take off and procurements
Plan drawing preparation for modification and arrangement of design.
Hands on Electrical activities wiring termination and installations
Preparations of layouts and installation of conduit sleeves and stub-up and ductbank
Preparation of work for switchgear and panel boards with support assembly and installations
Preparations of materials and tools requirements on site premises
Implement safety precautions for every individuals or responsible
Cable pulling Supervision and hands on activities
Mobilization of temporary facilities and portable cabin offices with utilities and accommodations.
Including substation for medium voltage power supply
Inspection of material‘s from supplier like from 34.5KV to 600V//480/230V SWGR and Panel Boards and transformer
Quality implementation and preparations of documents .
Overseeig for Testing and Commissioning of Equipment and devises prior for energization.
Company: DAELIM ENGINEERING AND CONST. CO. LTD. (EPC CONTRACTOR)
P. O. Box 11922,Jubail Industrial City 31961 Kingdom Of Saudi Arabia
Tel.: +966*-****** fax: +966*-*******/0763
Assignment: Saudi Aramco Total Refinery Project/ EPC project
Inclusive Dates: November’ 2010 To October 2012
Position Held: Electrical Engineer (Satorp project)
Duties and responsibilities
Prepare proper planning schedules for progress
Coordinate work activities to Sub contractor
Provide Design drawing and modifications in soft and hard copies, and as built
Implementing and Analyzing installation of all system.
Supervise layout and installation of RGS/PVC conduit for Transformers
Supervise and lead conduit installation for power, lighting, fire alarm, communication and HVAC.
Supervise fabrication of supports and bracket
Supervise GIS Switchgear and panel board installation. Up to 75 KV
Supervise Transformers installation
Prepare work schedule and Supervise installation of cable tray/.lighting system installation.
Supervise Pre- Commissioning activities for the ff in accordance of FAT and SAT: for
Annunciator panel of Switchgear and transformer equipments for substation
Energization of equipments / transformers and switchgears / power panels and motors and controls commissioning and testing.
Lighting, data communication,and fire protection system supervision at substation building
Position Held: QAQC Electrical Engineer /Inspector (Saudi Kayan Cracker Project)
Inclusive Dates: November’ 2008 to October 2010
Duties and responsibilities:
Planning arrangement and coordination
Review quality documents; construction method statement, inspection & test plan, test forms including material approval as per client standards & specifications, incorporated with engineering and construction group.
Lead and provide guidance To E&I qc inspection teams where and when required to ensure quality implementation.
Maintain inspection records, test equipment calibration certificates, quality related documents, codes, standards, specifications, drawings etc. As required by quality system.
Preparation and compilation of incoming/ outgoing communications, correspondences and inspection reports associated with QAQC department in preparation for audit.
Carry out inspection & witness testing of electrical installations, materials, equipment, components and assembly based on approved drawings and specifications.
Conduct periodic site inspections and issue surveillance reports, punch list, NCR’S, site quality deficiency report’s and follow up on corrective actions & implementation as required.
Coordinate with subcontractors and client as well as promote and maintain effective communications and relations (verbally and in writing) with supervisors, superiors and the project management team.
Preparation of QA/QC monthly progress reports.
Verification of approved material test certificates and test reports to ensure incoming materials are conforming to project standards & specifications.
Ensure all measuring and testing devices are effective, calibrated and records are up-to-date.
Actively participate on audit, QAQC & construction progress meetings in resolving issues pertaining to engineering, construction and QAQC activities as well as closing of SSR, NCR’S, SQDR’s and RFI punch lists.
Review prospective CV’s and conducts interviews on proposed site QC inspectors and staff.
Preparation of M.O.M., QA reports and other duties as assigned by QAQC manager.
In charge supervision for installation and pre-commissioning Switchgear and transformer equipment for substation
Witness inspection for pre commissioning controls and communication gateway / annunciator panel of switchgear and transformer equipment for commissioning and testing at Substation buildings. From 34.5KV to 13.8KV/6KV/ 600V//480V/24V
Company: MEGAWATTS ENGINEERING SERVICES
JURONG EAST, SINGAPORE
Project: Trident 15 And Trident 09 Transocean /Chevron Offshore and Onshore Substation and Control buildings
Position Held: Electrical Engineer – (Project Supervisor)/Operation and Maintenance
Inclusive dates: February 2008 to Aug. 2008
Keppel Fels Facilities, Kian Tech. Avenue Jurong Singapore /Sungkhla Thailand
Reason for leaving: Completion of Assignment
Transocean Oil Rig Offshore and Onshore
Inclusive Dates: February’ 2008 To August 2008
Duties and Responsibilities:
Materials requisition and report writing
Quality inspection and maintenance services
Think plan preparation for daily activities
Prepare work schedule
Coordinates activities to engineering department prior to execute.
In charge supervision for mobilization of project offices and electrical facilities.
Performed installing, commissioning on electrical equipment such as lightings, power distribution panel generators, motors,
and motor controls. FPSO, Project
Performed installing, commissioning on electrical equipment such as lightings, power distribution panel, generator, motors & controls.
Performed loop and continuity check on all wiring and termination, insulation resistance and test all cables and wiring.
Perform injection test on all protection relay and metering, check fuses rating and protection setting.
Performed solo run test and monitoring of all motor drives.
Checklist preparations such as equipment description, principles, rating ranges, test records and inspections.
Performed and execute safety electrical locked-out/tag out and energy isolation safety procedures.
Powering up UPS and DC Panel
Loop checking of electrical lightings from lighting panel to field and check for insulation resistance.
Testing and commissioning of Motor Control Center (MCC) such as breakers, current transformer, potential transformer,
overload relay, ground fault relay, and contactors with FAT and SAT
Carry out HV and LV isolations and Terminations
Check and rectify in-correct electrical installation in punch list items make corrective action/measure on backlog and prepare a red line mark up drawing for as built.
Company: NESMA AND PARTNERS CO. LIMITED
(General Contractor Company)
Inclusive dates: February 2006 To February 2008
Position Held: Electrical /Instrument Technician /Supervisor
Reason for leaving; Career Growth
Scope of Work:
Construction of Power Transmission and distribution lines for Three phase primary 230KV receiving Substation buildings
Projects Involved:
Saudi Kayan/Fluor/NESMA – Al Jubail Saudi Kayan Petrochemical Complex 230 KV Receiving Substation Building
Duties and Responsibilities:
In charge supervision for mobilization of project offices and electrical facilities.
In charge supervision for electrical & instrumentation works.
Maintenance of temporary electrical facilities including emergency diesel engine generator.
Analyzing installation of grounding system.
Supervise layout and installation of RGS/PVC conduit for Transformers
Supervise and lead conduit installation for power, lighting,fire alarm,communication & HVAC system
Supervise fabrication of supports and brackets.
Supervise GIS swithgear and panel board installation.
Supervise Transformers installation.
Prepare work schedule.
Supervise installation of cable tray/.lighting system installation.
Supervision of Testing and commissioning of 75KV to 600V//480/230V SWGR. Low voltage SWGR, Motor, other
Projects Involved: Saudi Aramco/Agap/Nesma/Bemco – Duba Bulk Plant
Duties and Responsibilities:
Coordinated and Supervision for electrical & Instrumentations activity in accordance of the work.
Preparation of work schedule & distribution of manpower for each activities stated.
Resolving problems with regards to unavoidable circumstances through electrical layouts and premises.
Preliminary testing procedure execution for commissioning
Completion of installations for substations and additional process lines and two (2) tanks within the premises pumping station and loading arm thru satellite building and control building.
Projects Involved:
NATPET/NESMA/TECHNIP – Yanpet National Petrochemical Corp.
Duties and Responsibilities:
Coordination and Supervision of electrical installations assemblies.
Analyzers installations and termination.
Pre-commissioning execution for power and lightings.
Submit and turn over materials and completion for the succeeding company projects.
Inspection of protection relays.
Report activity preparations and as built drawings.
Company: SAUDI OGER CO.LIMITED
Diriyah camp, RIYADH, KSA
Inclusive dates: January 2005 to January 2006
Position Held: Technician Electrical Engineer ( Operation And Maintenance Department)
Project involved; KING ABDULAH’S PALACE
Duties and Responsibilities:
Coordinate to control operator the work activity in line.
Supervision and monitoring of on-going construction works of distribution lines for the RAWDHA
Line survey and maintenance inspection from main line substation to utility Substation, including 13.8KV/ 5KV Distribution lines.
Preventive Maintenance for all 45 UPS room and 48 Substation around the palace / including trouble shooting
Conduct final inspection, Testing and final checking of connections before Energization
Supervision of Testing and commissioning of 75KV to 600V//480/230V SWGR. Low voltage SWGR, Motor, other 34.5KV to 13.8KV/6KV/ 600V//480V/24V
Company: ABV ROCK GROUP CO. LIMITED
P.O. Box 4538, Madinah/Abah 21411,
Kingdom of Saudi Arabia
Tel.: (+966-4) 847-2151 Fax: (+966-4) 847-1267
General Contractor Company
Inclusive dates: February 2001 To November 2003
Position Held: Electrical /Instrument Engineering technician
Reason for leaving: Finished Project
Projects Involved: Construction Of Storage Plant and building Substation
Petrochemical, Oil & Gas Plant Booster Pipeline
Duties and Responsibilities:
Coordination for every discipline in line of the activities
Installation of high and low voltage Motor Control Center (MCC) to Marshalling Rack and to Distributed Control System.
Loop checking and calibration of instrument devices.
Installation of stainless tubing for instrument devices.
Installation and repair electrical supply, control and signal for electrical motors.
Cable pulling and terminations to MCC (Motor Control Center) to Marshalling Rack and to Data Control System.
ABB Photo control, Decontek, Allen Bradley, Siemens, GE, Control System, PLC diagnose and fault findings including analyzers, installations And testing.
Installation and assembly of Power Panel.
Documentation and Review drawings for sub contractors drawing
Electrical inverters panel installation, cable pulling and terminations.
Conduct Megger testing and Hi-potential testing.
Drawings and Vendor prints through document transmittals including Work Instructions
Report activity preparations and as built drawings.
Progress reports & records, actual work activities and coordinate with concerned supervisors to client on Inspections & Electrical Construction, System Mechanical Completion for Substation buildings,
Preliminary testing execution for commissioning Motor solo run test .
Company: FORMOSA CHEMICALS AND FIBER CORPORATION
31-200 Hsu Tsou Tribe, San Sheng Village
Mai-Liao Yunlin, Taiwan
Tel.: +886-5- 6912345 ext. 3155-3164
Fax:+886-*-*******
Inclusive dates: May 1998-Aug. 1999
Position: Electrical And Instrumentation Maintenance technician
Projects Involved: PTA (I, II & III) And SM (I & II) (Power Plant) Aroma (I & Ii)/DMF MPI (Power Plant), Refinery (1, 2 & 3) & Olefin
Duties and Responsibilities:
Loop checking and calibration of instrument devices and trouble shooting.
Installation of stainless tubing for instrument devices.
Installation of electric conduit to supply power control signal for instrument devices.
Installation and repair electrical supply, control and signal for electrical motors.
Cable pulling and terminations to MCC (Motor Control Center) to Marshalling Rack and to Distributed Control System.
Installation and assembly of Power Panel and Control System for Substation and control building.
Documentation assistance for contractors drawing preparation.
Electrical inverters panel installation, cable pulling and terminations.
Performed installing, commissioning on electrical and instrument such as lightings, power distribution panel, motors &controls.
Performed loop and continuity check on all wiring and termination, insulation resistance and test all cables and wiring.
Perform injection test on all protection relay and metering, check fuses rating and protection setting.
Performed solo run test and monitoring of all motor drives.
Checklist preparations such as equipment description, principles, rating ranges, test records and inspections.
Performed and execute safety electrical locked-out/tag out and energy isolation safety procedures.
Energization forUPS and DC Panel
Loop checking of electrical lightings from lighting panel to field and check for insulation resistance.
Testing and commissioning of Motor Control Center (MCC) such as breakers, current transformer, potential transformer, overload relay, ground fault relay, and contactors.
Carry out HV and LV isolations and Terminations
Check and rectify in-correct electrical installation in punch list items make corrective action/measure on backlog and prepare a red line mark up drawing for as built.
Understand to read and work from engineering/vendor drawings SAT and FAT.
Company; UME/SMAS/AYTB COMPANY LIMITED
P. O. Box 31992 Al Qurayah, Abqaiq
Kingdom of Saudi Arabia
Tel no.: +966-*-******
Fax no.: +966-*-******
Inclusive dates: May 1992-Sept. 1996
Position: Electrical & Instrumentation Supervisor/Technician
Projects Involved: Foxboro-SASREF Modification Control Room and Aramco VI
Duties and Responsibilities:
Do the inspections with the client in order to maintain Quality standards requirements for Substations up to 34.5 down to 13.8 KV
Prepare Documentation for the assistance for contractors/ drawing preparation.
Prepare work schedule.
Foxboro SASREF Project.
Assist loop checking and calibration of control system of the modules like UFM, UCM and UIO card or PCBs using thermocouple simulator calibrator tester SPEC calibrator system, AIF calibrator, Multi line tester and variable resistor.
Console termination controls and power supply installation.
CCTV cable laying and cable tray assembly and termination.
Projects Involved:
SADAF Expansion Salt Plant Project
Duties and Responsibilities:
Prepare as built drawings.
Assist cable pulling records, supervision and installations for high and low voltage.
Loop checking and calibration of instrument devices.
Installation and repair electrical supply, control and signal for electrical motors.
Cable pulling and terminations to MCC (Motor Control Center) to Marshalling Rack and to Distributed Control System.
Installation and assembling of power and lighting panel
Installation of high voltage and low voltage switchgear.
Company: CAGAYAN ELECTRIC POWER AND LIGHTS CO. INC. (GEPALCO)
Construction Division
Suite A, 8th Floor, Strata 100 Bldg.
Emerald Avenue, Ortigas Complex
Pasig, Metro Manila, Philippines
P. O. Box 636, Greenhills telex: 4028
Tels.: +632-***-**** to 37,
+632-***-****, +632-***-**** & +632-***-****
Inclusive dates ; Jan. 1989-June 1991
Position: Electrical Aide/Electrician
Projects Involved: High rise Hotels, Airmens Open Mess and U. S. Navy Dormitories high rise buildings
Duties and Responsibilities:
Review work scope and prepare drawings prior for inspection for Substation
Prepare plan for the necessary job prescribe to be started by the electrical superintendent.
Implementing safety precautions as a work permit receiver.
Materials take off in accordance of the work.
Prepare shop drawing for field action request.
Hands on the installation activity, termination and installation of the following:
Electrical motors and control system
Lighting outlets, receptacle outlets and controls
Panel board including circuit breakers and safety devices.
Switchgear and transformer installation
Company: ROYAL INTERNATIONAL BUILDERS CO. LTD.
Cor. North Express way
Meycauwayan, Bulacan, Philippines
Tel. No: +63 2 8927812
+63 2 8927813 Position: Electrician
Inclusive dates: Jan. 1987-Oct. 1987
Projects Involved: Mobility, 22 Medical Storage and Mc Terminal buildings
Duties and Responsibilities:
Estimation of materials, maintenance and installation of electrical facilities.
Troubleshooting, termination and installation of the following:
Electrical motors and control of a system
Lighting outlets, receptacle outlets and controls
Panel board including circuit breakers and safety devices.
Communication devices and security system installation for buildings
*References:
Hong Deok Ki David Lee/ Sung Ho Lee
Electrical Manager Jerp 2b Proj. Construction Mgr. Halobutyl Project
Daelim Engg & Construction Saudi Arabia Mobile No; 050*******
Mobile No; +966********* / 009********* Ext.212 *******@********.**.**
******@******.**.**
Henry Agsaullo Mr. Sun Tae Soe
Electrical Lead QA Engineer Electrical field Manager
*****.********@******.*** Karakul / Uzbekistan
Mobile No.009*********** Mobile No.009***********
Cesar Ragos
Electrical And Instrument Qc Inspector
Abqaiq Aramco, K.S.A.
Mobile No.: +966*********
Eduardo S. Cortez
Electrical Designed Inspector
Aecom Singapore
**.******@*****.***
Mobile No. +658*******
I hereby declare under oath that all the information indicated herein are true and correct to the best of my knowledge and belief
TO WHOM IT MAY CONCERN,
I AM INTERESTED TO JOIN THE TEAM AS ELECTRICAL SUPERVISOR WHICH EXPANSION PROJECT HERE IN BATANGAS PLEASE DO ADVISE, I HAVE EXPERIENCE FOR MORE THAN 20 YEARS REGARDING MY CAREER FOR CONSTRUCTION OF MAY PROJECTS FOR OIL AND GAS,CHEMICAL AND PETROCHEMICALS, SUBSTATION AND LOGISTIC BUILDING, INCLUDING COMMISSIONING AND OPERATION MAINTENANCE AFTER MECHANICAL COMPLETION AND HANDING OVER DOCUMENTS. MY LAST PROJECT KIPIC AL ZOUR REFINERY UNDER FLUOR DAEWOO HYUNDAI JV FROM MAY 2017 UP TO JAN 2020.
YOU ARE PLEASE TO CONTACT ME HERE 006***********
THANKS AND REGARDS,
NOEL DE GUZMAN