Post Job Free
Sign in

Kinder Morgan Equipment Operator

Location:
Houston, TX
Salary:
$125,000/yr
Posted:
June 08, 2022

Contact this candidate

Resume:

JEFF LAWRENCE

***** ******* **. ******, **. *****

Cell: 541-***-**** Email: *.****************@*****.***

OBJECTIVE:

To secure a position with a company I can benefit with my experience and knowledge of Directional Drilling and Pipeline/Utility Construction. I am seeking employment with a company upholding excellent quality control standards with an emphasis on safety while creating new challenges to enhance my experience, to make me a more rounded and marketable asset for whom ever I’m associated and employed by.

Certifications:

OSHA 30, OQ Training / NCCER #11530822, ISTC SITE SPECIFIC TRAINING, First Aid / CPR

TWIC CARD

PASSPORT

JOURNEYMAN HEAVY EQUIPMENT OPERATOR

CDL (Class A) ALL ENDORSEMENTS

WILLING TO TRAVEL

FERC Compliance Experience

Texas Rail Road Commission Compliance Experience

Multi State Environmental Compliance Experience

Current Kinder Morgan CBT’s

WORK HISTORY:

ExxonMobil PII Project: Beaumont 2/3 (70 miles of 12” 10’ and 8”) AirSwift 8/21 – 4/22

80 Road Bores and 43 HDD Crossings

WHC Energy Services and Spartan Directional Drilling Conducted Work

Utility inspector responsible for Damage Prevention activities for mechanical excavation and hydro vac operations and determine which activities were constant observance (Hotline Crossings) and which were outside of ExxonMobil ground disturbance requirements. Ensure all environmental and land agreements are fallowed and executed properly. Additionally, make sure all contractor and sub contractors employees fallowed ExxonMobil safety and environmental standards and requirements.

ExxonMobil PII Project: 9.75 Miles of 24” Steel Crude Oil Pipeline (AirSwift 9/20 – 8/21)

Primoris Pipeline Services and Directional Service South

Lead HDD Inspector Over 11 HDD crossings and 15 Road Bores through an existing residential pipeline corridor

In charge of 5 HDD/Road Bore inspectors crossings varied in length of 350’ to 3300’

Making sure that all ExxonMobil Safety and environmental standards are followed and upheld as well as the HDD profile bottom tangent and radius of each crossing are maintained. Worked hand in hand with the primary contractor and drilling contractor during each crossing to maximize safety and environmental efficiency standards.

Kinder Morgan PHP Project (Spread 2/3) 42” Natural Gas Pipeline NEFS (3/20 – 8/20)

HDD/Utility Inspector

3254’ Crossing Under the Llano River (Junction, Texas)

2000’ Crossing Under the Pedernales River (Fredricksburg, Texas)

1600’ Crossing Under the Little Devils River (Harper, Texas)

ROW, Grade, Clearing, Road Bores

Texas Rail Road Commission compliance and Permit Adherence

Ensure Kinder Morgan safety and environmental standards are followed by contractor

verification that contractor fallowed design specifications during pilot hole, reaming and pipe installation phases.

Exxon/Mobil Expansion Project Baytown, Tx (Universal Pegasus International) 6-2019 to 3-2020

Strike: Contractor (Tx-187 Spread)

HDD Lead/Coordinator

2 HDD crossings

2817’ of 12” under Loop 207 in Mt. Belvieu, Tx

2550’ of 12” under Langston Rd. and Interstate 10 Mt. Belvieu,Tx

Read and interpret drawings and verify contractor compliance with Exxon/Mobil safety environmental and quality standards are met or exceeded

Meet with 3rd party line representatives to pothole and verify existing hotlines

Kinder Morgan Gulf Coast Express (Natural Energy Field Services) 3/19 – 5/19

Strike: Contractor Spread 4 - 5

HDD / Utility Inspector

Nueces River Crossing 2150’ of 42”

FM 666 Crossing 2400’ of 42”

Ensure Kinder Morgan safety and environmental standards are followed by contractor

Verification that contractor fallowed design specifications during pilot hole, reaming and pipe installation phases

Dominion Energy (Atlantic Coast Project) Quality Integrated Services 8-18 to 1-14-19

Price Gregory International: Contractor Spread 1 West Virginia

Environmental / Utility Inspector New Construction of 42” Natural Gas Pipeline

FERC Compliance, DEP Compliance

Oversee dewatering activities, seeding and mulching for winter stabilization, installation of erosion control devices, water body and buffer zone compliance

Ensuring the contractor is adhering to Dominion Energy safety and quality standards for road bores, lowering in, tie ins, backfill and clean up, padding

Enbridge (Nexus Project) : (MBF Inspection) 11/17 – 6/18 (Michels Pipeline)

HDD / Utility Inspector New Construction of 36” gas pipeline

Multiple HDD crossings of major Interstates, Rail Road, Wetland crossings

Oversee Dewatering activities, Lowering in, tie ins, back fill, Sheet pile crews, Road Bores, Swamp areas, DEQ compliance

Verify FERC ROW compliance daily with Environmental crews

Marathon Pipeline (Universal Pegasus): Utica Buildout Harpster to Lima 50 miles of 12” 1/17 – 9/17

ROW grade crew (Utility Inspector) Over seeing daily operations and ensuring the contractor and all subcontractors adhere to Marathon standards

Directional Drill (HDD Inspector) over seeing daily operations and ensuring all Marathon HDD design specifications are adhered to and all daily operations are safe and compliant with Marathon standards.

Final Clean up and Punch List (Main line) Seeding and Restoration for land owner sign off

Spectra Energy Group: (Texian Group) Atlantic Bridge and Access Northeast Projects 9/16 – 12/16

Preliminary Core Boring Oversite

Extra Work Space Layout

Access and Egress to and from existing and new ROW

Read and Interpret drawings

Coordinate and Manage all subcontractors and their work

Schedule and meet with City officials and agencies for work scope

Attend Preconstruction walk thru meetings

Compile and submit daily progress and update reports and spread sheets

FERC compliance

Spectra Energy Group: (Texian Group) AIM 2015 Project - Danbury, CT 8/15 – 8/16

HDD / Utility Inspector for 3,853’ Directional Drill for installation of 42” Natural Gas Line

FERC Compliance

Archeological site inspection and escort while test holes were dug.

Reporting, Planning, Consulting, of ROW clearing, tie - ins, valve sets and for extra work space limits and Reporting and hosting FERC representatives for on site compliance audits.

Upholding contractor and all subs to Spectra Energy compliance of safety standards and safety culture and values.

Contractor accountability and billing paperwork, approval and editing, material receiving and tracking.

Contractor and sub contractor compliance with both State and Federal regulations.

MCDANIEL TECHNICAL SERVICES – Ray, North Dakota and Killdeer, North Dakota 5/15 – 8/15

Lead/Chief inspector for Energy Transfer over Pipe Yards in Ray,ND and Killdeer,ND

Receiving, 20”,12”,and 24” @ 60’ length Approximately 750,000 feet all total

Over seeing offload and racking procedures and inputting NCR’s and CD’s according to

Energy Transfer Safety and Quality Procedures, Daily Reports and correspondence with ETC

Tallying pipe received totals daily into ( Word ) spread sheet

Overseeing daily operations and ensuring contractor abides by ETC Safety and Quality

Responsible for Inspection Crew of 3 to inspect pipe as it is offloaded and racked in pipe yard.

Verify ID/OD stenciles and check for coating damage, bevel damage, etc….

Chevron Pipeline - USGC Expansion Project – 6/21/14-1/31/15

Site Inspector: Installation of 7 Pipelines 3-12”, 1-8”, 1-10”,1-4”,1-16”

3000’ HDD Bundle drill under Railroad Tracks.

Open cut trench, Tie ins, Pig Trap Installation (Targa Facility) Mont Belvue, Tx.

Pipe Rack Construction (CP Chem.) Baytown,Tx

Slick Bores, Hydro Testing (Gulf Coast Pipeline Services), Dewatering, Swabbing, Cleaning and Drying Pipelines, Blanketing lines with Nitrogen, Punch list completion, Final cleanup.

Chief Inspector- Randy Rains 903-***-****

Chevron Lead HES (safety) Wayne Winder 303-***-****

Chevron Construction Coordinator Matt Odham

Chevron Capital Projects- PAPS/SEAWAY PROJECT- Beaumont terminal 1/21/14-6/18/14

Chief Inspector: Issue and Review all Permits. Take up and Re- lay of 24” Crude oil line. New Pipe lay of 10” and 14” Acetylene and Propylene lines and 2” Nitrogen line, Remove and Replace Tank Dike Walls, Coordinate with Terminal Representatives for jobsite locations within terminal. Assign Inspectors (CWI, Civil, Site, I and E, Utility) to perspective crews and jobsites. Meet with Contractors and Sub contractors in regards to proper training and work compliance to Chevron Standards. Review Weld X-ray film and project revisions with contractors.

Justin Ledet: Chevron Project Manager 713-***-****

Avery Pipeline Services –Milaca, Mn. – July 30- Jan. 18, 2014 Line B Take up and Re- lay for Enbridge

HDD Inspector for Avery Pipeline Services work in Michigan and Indiana (Enbridge)

Issue Safe Work Permits

Issue Ground Disturbance Permits

2100’, 3250’, 3100’ Drills for installation of 36” steel line

Contractor: Laney Directional Drilling

FERC Compliance

MBF Inspection Services, Inc. – Roswell, NM – April 2013 – September 2013

Inspector for MBF inspection services

HDD Specialist

10” and 12” steel lines

Chevron Feedstock-Ethylene Project, Mont Belvieu, Texas

4/18/13 – 4/25/13

Project- Burnett Bay Drill 6500’ of 10” and 12” Pipe

Contractor: Laney Directional Drilling

Issued Safe Work, Excavation and Hot Work Permits

4/26/13 - 6/14/13

Project- Garth Road Drill 3100’ of 10” and 12” pipe

Contractor: Janco Directional Drilling

Issued Safe Work, Excavation and Hot Work Permits

6/15/13 – 6/19/13

Project- Drill Relief Wells #1 and #2 @Cedar Bayou

#1 95’ of 16” Diameter set steel casing (south side)

#2 78’ of 16” Diameter set steel casing (north side)

Contractor: Strike Construction

Issued Safe Work, Excavation and Hot Work Permits

6/2013 – 9/2013

Project- Cedar Bayou Drill 1800’ 6 Pack pipe package of 10” and 12” steel pipe to be

Installed (HDD)

Contractor: Janco Directional Drilling

Issueing Safe Work, Excavation and Hot Work Permits

Professional Underground Services Inc. - Eugene, Oregon – Feb 2012 to April 10, 2013

HDD Supervisor/Foreman/Operator

Natural Gas pipeline and Utility HDD installations

Supervised drilling operations on projects utilizing drill rigs with up to 440,000 lbs. thrust/pullback

Experienced in wireline and walkover tracking systems

Monitored drilling fluid properties

Responsible for daily progress reporting and safety documentation

Experienced in all facets of HDD operations from pilot hole to pull-back

Rockford Corporation - Hillsboro, Oregon - Jan 2011 to Jan 2012

Heavy Equipment Operator

Side boom operator, Excavator, Dozer, Hammer Hoe, Hydro axe

Construction of 42 inch natural gas pipeline

Professional Underground Services Inc. - Eugene, Or. – Mar 2010 to Dec 2010

HDD Foreman/HDD Operator/Heavy Equipment Operator

Natural Gas pipeline and Utility HDD installations

Responsible for crew and equipment during daily HDD operations with drill rigs from 24,000 to 220,000 lbs. thrust/pullback

Wireline and walkover tracking systems

Responsible for drilling fluid properties and mud re-claimer operation and maintenance

Responsible for daily drill logs/ream logs/mud reports and progress reporting

Northwest Metal Fab Inc. - Portland Or. - Sep 2006 to Dec 2009

HDD Operator/Heavy Equipment Operator - Portland Oregon - Sep 2006 to Dec 2009

Natural Gas pipeline and Telecom HDD installations

Operated various size drills from 27,000 to 70,000 lbs. thrust/pullback

Sideboom, Track hoe, Dozer

Jensen Drilling Inc. - Eugene Or. - Dec 2005 to Aug 2006

Foreman/Horizontal Drain Drill Operator/Heavy Equipment Operator

Installation of both vertical and horizontal steel casing

Experienced in vertical drilling (mud rotary, reverse circulation)

Pilchuck Contractors Inc. – Woodinville, Wa. Apr 2000 to Nov 2005

HDD Operator/Mud Technician/Heavy Equipment Operator

Natural Gas pipeline and Telecom HDD installations

Worked on various projects with drill rigs ranging from 24,000 lbs. to 220,000 lbs of thrust/pullback.

Track hoe, Dozer, Side boom

Johnson Utilities Inc. – Hillsboro, Or - Jun 1998 to Jan 2000

HDD Operator/Mud Technician

HDD utility installation - Telecom, Gas, Power, Water and Sewer

Experienced operating drill rigs from 11,000 to 24,000 lbs. of thrust/ pullback

Responsible for mixing mud with various mud systems

REFERENCES:

REFERENCES UPON REQUEST



Contact this candidate