JEFF LAWRENCE
***** ******* **. ******, **. *****
Cell: 541-***-**** Email: *.****************@*****.***
OBJECTIVE:
To secure a position with a company I can benefit with my experience and knowledge of Directional Drilling and Pipeline/Utility Construction. I am seeking employment with a company upholding excellent quality control standards with an emphasis on safety while creating new challenges to enhance my experience, to make me a more rounded and marketable asset for whom ever I’m associated and employed by.
Certifications:
OSHA 30, OQ Training / NCCER #11530822, ISTC SITE SPECIFIC TRAINING, First Aid / CPR
TWIC CARD
PASSPORT
JOURNEYMAN HEAVY EQUIPMENT OPERATOR
CDL (Class A) ALL ENDORSEMENTS
WILLING TO TRAVEL
FERC Compliance Experience
Texas Rail Road Commission Compliance Experience
Multi State Environmental Compliance Experience
Current Kinder Morgan CBT’s
WORK HISTORY:
ExxonMobil PII Project: Beaumont 2/3 (70 miles of 12” 10’ and 8”) AirSwift 8/21 – 4/22
80 Road Bores and 43 HDD Crossings
WHC Energy Services and Spartan Directional Drilling Conducted Work
Utility inspector responsible for Damage Prevention activities for mechanical excavation and hydro vac operations and determine which activities were constant observance (Hotline Crossings) and which were outside of ExxonMobil ground disturbance requirements. Ensure all environmental and land agreements are fallowed and executed properly. Additionally, make sure all contractor and sub contractors employees fallowed ExxonMobil safety and environmental standards and requirements.
ExxonMobil PII Project: 9.75 Miles of 24” Steel Crude Oil Pipeline (AirSwift 9/20 – 8/21)
Primoris Pipeline Services and Directional Service South
Lead HDD Inspector Over 11 HDD crossings and 15 Road Bores through an existing residential pipeline corridor
In charge of 5 HDD/Road Bore inspectors crossings varied in length of 350’ to 3300’
Making sure that all ExxonMobil Safety and environmental standards are followed and upheld as well as the HDD profile bottom tangent and radius of each crossing are maintained. Worked hand in hand with the primary contractor and drilling contractor during each crossing to maximize safety and environmental efficiency standards.
Kinder Morgan PHP Project (Spread 2/3) 42” Natural Gas Pipeline NEFS (3/20 – 8/20)
HDD/Utility Inspector
3254’ Crossing Under the Llano River (Junction, Texas)
2000’ Crossing Under the Pedernales River (Fredricksburg, Texas)
1600’ Crossing Under the Little Devils River (Harper, Texas)
ROW, Grade, Clearing, Road Bores
Texas Rail Road Commission compliance and Permit Adherence
Ensure Kinder Morgan safety and environmental standards are followed by contractor
verification that contractor fallowed design specifications during pilot hole, reaming and pipe installation phases.
Exxon/Mobil Expansion Project Baytown, Tx (Universal Pegasus International) 6-2019 to 3-2020
Strike: Contractor (Tx-187 Spread)
HDD Lead/Coordinator
2 HDD crossings
2817’ of 12” under Loop 207 in Mt. Belvieu, Tx
2550’ of 12” under Langston Rd. and Interstate 10 Mt. Belvieu,Tx
Read and interpret drawings and verify contractor compliance with Exxon/Mobil safety environmental and quality standards are met or exceeded
Meet with 3rd party line representatives to pothole and verify existing hotlines
Kinder Morgan Gulf Coast Express (Natural Energy Field Services) 3/19 – 5/19
Strike: Contractor Spread 4 - 5
HDD / Utility Inspector
Nueces River Crossing 2150’ of 42”
FM 666 Crossing 2400’ of 42”
Ensure Kinder Morgan safety and environmental standards are followed by contractor
Verification that contractor fallowed design specifications during pilot hole, reaming and pipe installation phases
Dominion Energy (Atlantic Coast Project) Quality Integrated Services 8-18 to 1-14-19
Price Gregory International: Contractor Spread 1 West Virginia
Environmental / Utility Inspector New Construction of 42” Natural Gas Pipeline
FERC Compliance, DEP Compliance
Oversee dewatering activities, seeding and mulching for winter stabilization, installation of erosion control devices, water body and buffer zone compliance
Ensuring the contractor is adhering to Dominion Energy safety and quality standards for road bores, lowering in, tie ins, backfill and clean up, padding
Enbridge (Nexus Project) : (MBF Inspection) 11/17 – 6/18 (Michels Pipeline)
HDD / Utility Inspector New Construction of 36” gas pipeline
Multiple HDD crossings of major Interstates, Rail Road, Wetland crossings
Oversee Dewatering activities, Lowering in, tie ins, back fill, Sheet pile crews, Road Bores, Swamp areas, DEQ compliance
Verify FERC ROW compliance daily with Environmental crews
Marathon Pipeline (Universal Pegasus): Utica Buildout Harpster to Lima 50 miles of 12” 1/17 – 9/17
ROW grade crew (Utility Inspector) Over seeing daily operations and ensuring the contractor and all subcontractors adhere to Marathon standards
Directional Drill (HDD Inspector) over seeing daily operations and ensuring all Marathon HDD design specifications are adhered to and all daily operations are safe and compliant with Marathon standards.
Final Clean up and Punch List (Main line) Seeding and Restoration for land owner sign off
Spectra Energy Group: (Texian Group) Atlantic Bridge and Access Northeast Projects 9/16 – 12/16
Preliminary Core Boring Oversite
Extra Work Space Layout
Access and Egress to and from existing and new ROW
Read and Interpret drawings
Coordinate and Manage all subcontractors and their work
Schedule and meet with City officials and agencies for work scope
Attend Preconstruction walk thru meetings
Compile and submit daily progress and update reports and spread sheets
FERC compliance
Spectra Energy Group: (Texian Group) AIM 2015 Project - Danbury, CT 8/15 – 8/16
HDD / Utility Inspector for 3,853’ Directional Drill for installation of 42” Natural Gas Line
FERC Compliance
Archeological site inspection and escort while test holes were dug.
Reporting, Planning, Consulting, of ROW clearing, tie - ins, valve sets and for extra work space limits and Reporting and hosting FERC representatives for on site compliance audits.
Upholding contractor and all subs to Spectra Energy compliance of safety standards and safety culture and values.
Contractor accountability and billing paperwork, approval and editing, material receiving and tracking.
Contractor and sub contractor compliance with both State and Federal regulations.
MCDANIEL TECHNICAL SERVICES – Ray, North Dakota and Killdeer, North Dakota 5/15 – 8/15
Lead/Chief inspector for Energy Transfer over Pipe Yards in Ray,ND and Killdeer,ND
Receiving, 20”,12”,and 24” @ 60’ length Approximately 750,000 feet all total
Over seeing offload and racking procedures and inputting NCR’s and CD’s according to
Energy Transfer Safety and Quality Procedures, Daily Reports and correspondence with ETC
Tallying pipe received totals daily into ( Word ) spread sheet
Overseeing daily operations and ensuring contractor abides by ETC Safety and Quality
Responsible for Inspection Crew of 3 to inspect pipe as it is offloaded and racked in pipe yard.
Verify ID/OD stenciles and check for coating damage, bevel damage, etc….
Chevron Pipeline - USGC Expansion Project – 6/21/14-1/31/15
Site Inspector: Installation of 7 Pipelines 3-12”, 1-8”, 1-10”,1-4”,1-16”
3000’ HDD Bundle drill under Railroad Tracks.
Open cut trench, Tie ins, Pig Trap Installation (Targa Facility) Mont Belvue, Tx.
Pipe Rack Construction (CP Chem.) Baytown,Tx
Slick Bores, Hydro Testing (Gulf Coast Pipeline Services), Dewatering, Swabbing, Cleaning and Drying Pipelines, Blanketing lines with Nitrogen, Punch list completion, Final cleanup.
Chief Inspector- Randy Rains 903-***-****
Chevron Lead HES (safety) Wayne Winder 303-***-****
Chevron Construction Coordinator Matt Odham
Chevron Capital Projects- PAPS/SEAWAY PROJECT- Beaumont terminal 1/21/14-6/18/14
Chief Inspector: Issue and Review all Permits. Take up and Re- lay of 24” Crude oil line. New Pipe lay of 10” and 14” Acetylene and Propylene lines and 2” Nitrogen line, Remove and Replace Tank Dike Walls, Coordinate with Terminal Representatives for jobsite locations within terminal. Assign Inspectors (CWI, Civil, Site, I and E, Utility) to perspective crews and jobsites. Meet with Contractors and Sub contractors in regards to proper training and work compliance to Chevron Standards. Review Weld X-ray film and project revisions with contractors.
Justin Ledet: Chevron Project Manager 713-***-****
Avery Pipeline Services –Milaca, Mn. – July 30- Jan. 18, 2014 Line B Take up and Re- lay for Enbridge
HDD Inspector for Avery Pipeline Services work in Michigan and Indiana (Enbridge)
Issue Safe Work Permits
Issue Ground Disturbance Permits
2100’, 3250’, 3100’ Drills for installation of 36” steel line
Contractor: Laney Directional Drilling
FERC Compliance
MBF Inspection Services, Inc. – Roswell, NM – April 2013 – September 2013
Inspector for MBF inspection services
HDD Specialist
10” and 12” steel lines
Chevron Feedstock-Ethylene Project, Mont Belvieu, Texas
4/18/13 – 4/25/13
Project- Burnett Bay Drill 6500’ of 10” and 12” Pipe
Contractor: Laney Directional Drilling
Issued Safe Work, Excavation and Hot Work Permits
4/26/13 - 6/14/13
Project- Garth Road Drill 3100’ of 10” and 12” pipe
Contractor: Janco Directional Drilling
Issued Safe Work, Excavation and Hot Work Permits
6/15/13 – 6/19/13
Project- Drill Relief Wells #1 and #2 @Cedar Bayou
#1 95’ of 16” Diameter set steel casing (south side)
#2 78’ of 16” Diameter set steel casing (north side)
Contractor: Strike Construction
Issued Safe Work, Excavation and Hot Work Permits
6/2013 – 9/2013
Project- Cedar Bayou Drill 1800’ 6 Pack pipe package of 10” and 12” steel pipe to be
Installed (HDD)
Contractor: Janco Directional Drilling
Issueing Safe Work, Excavation and Hot Work Permits
Professional Underground Services Inc. - Eugene, Oregon – Feb 2012 to April 10, 2013
HDD Supervisor/Foreman/Operator
Natural Gas pipeline and Utility HDD installations
Supervised drilling operations on projects utilizing drill rigs with up to 440,000 lbs. thrust/pullback
Experienced in wireline and walkover tracking systems
Monitored drilling fluid properties
Responsible for daily progress reporting and safety documentation
Experienced in all facets of HDD operations from pilot hole to pull-back
Rockford Corporation - Hillsboro, Oregon - Jan 2011 to Jan 2012
Heavy Equipment Operator
Side boom operator, Excavator, Dozer, Hammer Hoe, Hydro axe
Construction of 42 inch natural gas pipeline
Professional Underground Services Inc. - Eugene, Or. – Mar 2010 to Dec 2010
HDD Foreman/HDD Operator/Heavy Equipment Operator
Natural Gas pipeline and Utility HDD installations
Responsible for crew and equipment during daily HDD operations with drill rigs from 24,000 to 220,000 lbs. thrust/pullback
Wireline and walkover tracking systems
Responsible for drilling fluid properties and mud re-claimer operation and maintenance
Responsible for daily drill logs/ream logs/mud reports and progress reporting
Northwest Metal Fab Inc. - Portland Or. - Sep 2006 to Dec 2009
HDD Operator/Heavy Equipment Operator - Portland Oregon - Sep 2006 to Dec 2009
Natural Gas pipeline and Telecom HDD installations
Operated various size drills from 27,000 to 70,000 lbs. thrust/pullback
Sideboom, Track hoe, Dozer
Jensen Drilling Inc. - Eugene Or. - Dec 2005 to Aug 2006
Foreman/Horizontal Drain Drill Operator/Heavy Equipment Operator
Installation of both vertical and horizontal steel casing
Experienced in vertical drilling (mud rotary, reverse circulation)
Pilchuck Contractors Inc. – Woodinville, Wa. Apr 2000 to Nov 2005
HDD Operator/Mud Technician/Heavy Equipment Operator
Natural Gas pipeline and Telecom HDD installations
Worked on various projects with drill rigs ranging from 24,000 lbs. to 220,000 lbs of thrust/pullback.
Track hoe, Dozer, Side boom
Johnson Utilities Inc. – Hillsboro, Or - Jun 1998 to Jan 2000
HDD Operator/Mud Technician
HDD utility installation - Telecom, Gas, Power, Water and Sewer
Experienced operating drill rigs from 11,000 to 24,000 lbs. of thrust/ pullback
Responsible for mixing mud with various mud systems
REFERENCES:
REFERENCES UPON REQUEST