QUALIFICATION ::

TOTAL EXPERIENCE :

OBJECTIVE

WORK EXPERIENCE

CURRENT ORGANIZATION

LOCATION

PROJECT RESPONSIBILITIES

CURRENT ORGANIZATION

LOCATION

PROJECT RESPONSIBILITIES

PREVIOUS ORGANIZATION

LOCATION

PROJECT RESPONSIBILITIES

PREVIOUS ORGANIZATION

LOCATION

PROJECT RESPONSIBILITIES

PREVIOUS ORGANIZATION

PREVIOUS ORGANIZATION

PROFFESSIONAL

QUALIFICATION

SOFTWARE & HARDWARE SKILL

PERSONALPROFILE

HOBBIES

PERSONALSKILLS

DECLARATION

DATE :-

PLACE: Gadarwara

: B.E.(ELECTRICAL & ELECTRONICS) / 2009 Year pass out

: 10.2 YEARS

: Seeking a position to utilize my skills and abilities in Power Transmission/Distribution/ Electrical/Infrastructure/ Energy sector organization that offers security and Professional growth while being resourceful, innovative and flexible.

: 10.2 Years work experience as projects IPDS PuVVNL Varanasi /Saubhagya Yojna PuVVNL Varanasi /Feeder Separation MPPKVVCL, Jabalpur / Building construction (Real Estate Project )

PROFESSIONAL EXPERIENCE:

: Working in M/s NCC LTD. As a Assistant Engineer from November 2018 to 31 May 2020

: BHADOHI UP (Saubhagya yojna Project)

Site Monitoring.

Site Supervisory (Erection process & stringing).

LT & HT Line charging monitoring.

Project coordinator for the project-communicating with all inter departmental management as well as between vender & client.

Office work (Making of pole schedule & bill for agencies).

Paper Monitoring (Bill checking).

Manage and lead the Project execution to ensure smooth running of activities with high efficiency.

GPS based Survey Work, Finalization & Preparation of BOQ, Material Requisition, Re-cancellation & Management, Responsible for Site activities and arrangement of Sub-Contractor & his Progress of work and Responsible for billings of client & subcontractors also.

Erection of 11KV line, 11/.44KV DTR 16,25 & 63 KVA installation, conversion of bare conductor by AB XLPE cable in LT line & also provide new LT line by AB cable and installation of Energy meters for consumers.

Resolve project execution problems by conferring with management/Client, engineering and

quality control personnel.

Responsible for taking works from Site supervisors for project planning activities and ensure that target's is achieved.

Maintaining Quality management systems as per the formats prescribed.

Analysis and Reporting of Daily, Weekly and Monthly Achievements, Balance target, material availability, Billing status to Project Manager.

Analysis of revenue & follow-up for its clearance from client.

Maintained Safety and guided safety rules.

: Working in M/s NCC LTD. As a Assistant Engineer from September2016 to November 2018

: Allahabad (IPDS Project)

SCOPE OF WORKS :

IPDS Project :- Construction of new 33/11 KV substation, Addition 5MVA, Augmentation 3 & 5 MVA to 10 MVA power transformer for substation. New line 33 KV & 11 KV by under ground cable. New line 33 KV & 11 KV O/H by dog conductor & New line 11KV by ABC cable.

Understand and interpret drawings and specification

Resolve any unexpected technical difficulties and other problems that may arise at any time

Design of 33/11kv substation & 33 KV transmission line. Materials procure of substation & transmission line.

Inspection, Survey & data accusation of different distribution network (33 KV substation, cable routine, power transformer, 33/11 KV line etc.).

Complete documentation, Preparation of BOQ & drawing as per existing system.

Erection, Installation & Commissioning of 5 & 10 MVA power transformer.

Erection & Installation of VCB WITH CT

Erection & Installation of Isolator, Post insulator & LA with structures.

Erection & Installation of 33 & 11 KV ME

Erection & Commissioning of 33 & 11 KV incoming, outgoing & Bus coupler control panels.

Construction of Additional power transformer for substation 5 MVA.

Augmentation of power transformer for substation 3 & 5 MVA to 10 MVA

Erection New line 33KV &11KV O/H by 11 MTR Long STP pole by Dog conductor.

Erection New line 33KV &11KV by UG cable 300 SQR MM &185 SQR MM, by HDD Method & Open Trench

Erection New line 11 KV by ABC cable 120 SQR MM

Erection New line 11 KV by ABC cable 120 SQR MM.

Keep proper records of the Contractors' activities and work progress.

Preparation of bills of Material, Erection & Commissioning along with Price Variation bills.

Analysis of material measurement of contractor and preparation of their bills according to the awarded rates.

Manage Manpower and Material at site and settle the public/contractor disputes related to work & labor at sites.

Activity wise physical survey, Preparation of SLD drawings.

Progress of the day & next day planning on daily basis report to QS department

: M/s URS Scott wilsion India (P) Ltd. Under MPPKVVCL Jabalpur (Sep.2011 to sept.2016) As a field Engineer

: NARSINGHPUR, GADARWARA & CHHATARPUR.( Feeder Separation Project)

Quality Monitoring & supervising day to day progress of the site erection activities of 11 kV line, replacement with AB Cable DTR and meterization.

Responsible for carry out the survey of 11 kV Line, LT line & DTR Location.

Preparation of single line diagram & get approval from client.

Day to day Planning and supervision of the works.

Day to day verification Material records and quality of material

Preparation of pole schedule of completed work and submitted to RE for further process.

: Working in M/s Asnani Builders & Developers Bhopal (Real Estate Company)-As a Electrical Engineer from 2/2/2011 to 30/7/2011

: Bhopal (Building Construction)

: Identify the survey location. Execution of 11kv Line, Distribution Transformer,LT cables & service connection of the flats. Supervision of flats electrical wiring. Maintenance of store materials & handling manpower on site. Making and daily progress reporting to Project Manager. Maintenance of DG set & Lift, Pumps

: Working in M/s Aakriti Dwelling Pvt. Ltd. Bhopal (Real Estate Company)- As a Trainee Engineer from June 2010 to Feb. 2011

: Working in M/s Spark Electrical Contractor Bhopal As a Site supervisor from Jan. 2010 to June 2010

B.E. (Electrical & Electronics Engineering) From, RGPV University Bhopal 2009. Secure in 61.93%. (Formerly known as NIIST Bhopal).

Basic Software :- MS-OFFICE, PHOTOSHOP

Designing Tools :- AUTOCAD

Date of Birth :- 22 July 1985

Permanent Address :- Near Railway crossing, chichali road Gadarwara (MP)

Languages Known :- English, Hindi.

Nationality :- Indian

Marital Status :- married

Net surfing, reading newspaper, Helping, Motivating &I interacting with people.

Having very sharp memory & quick understanding ability, learn new things, ability to deal people diplomatically, a self-motivated person waiting to take up the challenging assignment and meet the requirements in total and on time.

I hereby declare that the information furnished above is true to the best of my knowledge and belief.

SIGNATURE (Rajendra kumar Nagwanshi)