Robert E. Vandergriff
Winona, Texas
Cell 903-***-****
SUMMARY Upper supervision, VP Operations/Sales; giving the client quality work within the budget. Five years as Electrical Consultant for the Client and Quality Assurance, Instrumentation and Electrical Inspections. Electrical Superintendent with over 25 years in the Industrial/Electrical Industry with over 13 years as Superintendent. Projects include Arctic Challenger, Keystone Pipe Line, GEO Thermal Power Plants, Chemical and Oxygen plants, hospitals, power plants, paper mills, refineries, oil and gas pads and manufacturing and electrical consulting representing the client. Licensed in Texas, Oklahoma, Arkansas and California and New Mexico. Maintenance Supervisor over 7 years over electrical, mechanical, pneumatic and hydraulic controls. Responsible for maintaining all equipment, adding new equipment & machinery, all aspect of building maintenance overseeing all pipe fitting structural, mechanical, electrical and instrument, preventive maintenance programs.
SKILL SETS Qualified Licensed Industrial Electrician
Electrical Consulting.
Qualified General Superintendent experienced in the Industrial setting.
Strong skills in Construction Layout, Installation of heavy power and
Control systems. Conduit cable tray duct bank and qualified support systems .
Code compliant.
Able to communicate and work closely with engineering operations and safety
within the plant area.
EMPLOYMENT
HISTORY
E&I Superintendent Aug 2019 to Aug 2020
Lauren Engineering & Construction
Abilene, Tx
Various projects: Chemical Plant in Kemah, Tx, Power Plant in Los Alamos National
Laboratory; 3 Compressor Stations in Carlsbad, NM for XTO Compressor Station.
Coordinated activities with the client, engineering, venders and subcontractors to ensure quality
And the schedules were met on grass roots projects. All phases of E&I from underground to cable
Trays, conduit, terminations and commissioning; material take offs, change orders,
RFI’s, EWO’s and bid EWO work. Reviewing JSA’s and held daily morning
Meetings. Safety of the people is always a major priority. Received ROF.
E&I Superintendent
CCC Group Inc. June 2018 to July 2019
Texas Sand Plants
Worked in Sand Plants in Crane and Lamesa Texas and a Gold Mine in Winnemucca, Nv.
Coordinated activities with the client, engineering, venders and subcontractors to ensue quality
And the schedules were met on grass roots projects. All phases of E&I from underground to cable
Trays, conduit, terminations and commissioning; material take offs, change orders,
RFI’s, EWO’s and bid EWO work. Reviewing JSA’s and held daily morning
Meetings. Safety of the people is always a major priority. Left for a job closer to home.
E&I Superintendent May 2017 to May 2018
KBR at Texas Eastman Chemical Plant
Longview, Texas
Construction Site Manager; Bernie Dean 832-***-****
Over all aspects for Electrical & Instrumentation for small & large projects, managed 70
Employees to ensure safety and quality making sure all schedules were met. Continuously
Worked with client and managers in daily meetings for updates on multiple projects. Handled all
E&I Emergency Jobs and Outages as the situation required in a operating facility.
Electrical I&E Consultant Oct 2013 to April 2016
Worldwide Professional Service
Alma and Genoa, Wisconsin
Site Superintendent, Ricky Egan 608-***-****
Electrical Consultant representing the client working on constructability with engineering
to resolve design issues. Attended FAT Testing (Factory Acceptance Test) on electrical
equipment to assure it was built per code and specifications and quality. Working with
Electrical & Instrumentation contractors to track the progress with weekly QIR (Quality
Installed Reports).
Electrical Superintendent June 2013 to Oct 2013
Tessco Inc.
Odessa, Tx
Vice President, Ken Shirley 432-***-****
Grass Roots Project on Pumping Stations. Responsible for Electrical & Instrumentation
Installation and Commissioning.
Electrical Superintendent June 2004 to June 2013
EIU of California, Inc. Bakersfield, Ca.
Vice President, Paul LaBauve 661-***-****
Working with TransCanada and Willbros as Project and Quality Assurance Manager:
Installations of new Electrical Substations, all aspects of the Pumping Stations
From grounding; conduit, cable tray, lighting, power, control, medium voltage,
Instrumentation, heat trace, installed per design spec and code.
Over three Southern sites and twenty eight remote valve sites. Attended weekly
Attended meetings on Production and completions of the job with the Client. Attended
Meetings with Engineers on design issues, Coordinated with the Client on scheduling to
Complete project in a safe and timely manner. Completed material take offs, ordered
Material and tracked eta of all material. 138 kw & 4160 kw on GEO Thermal, Chemical and
Oxygen.
Working with Alliant Energy at Lansing Generating Station. Southerland
Generating Station, Nelson Dewey Generating Station and Edgewater
Generating Station. Working directly with engineering on constructability and
Scheduling and Quality Assurance documentation and Inspections and witness Quality
Control testing and testing as the client representative.
Worked Industrial, Geo Thermal, Turbine Power Plants, Almond Plant, Dryer’s
Ice Cream Plant Refinery Capital projects and turn around. Responsible for all phases of
Electrical and Instrumentation to include take offs, scheduling; Quality Control and
Electrical and Instrumentation Inspector; cost code tracking, man hours and
Coordinated with my foreman and other crafts to meet scheduled dates for the safe
And productive completion of the project.
Senior Start up Tech Oct 2003 - June 2004
Saulsbury Electric, Board Plant
Broken Bow, Ok.
Paul Arvizo 505-***-****
Pressed Board Start up. Worked directly with the client and the vendor trouble
shooting problems that occurred within the power and control systems.
Electrical Senior G.F. Feb 2002 - Sept 2003
Becon Construction, Power Plant
Luther, Ok
Gary Thompson 713-***-****
Four 100 M.W> Gas Turbine Power Plants
Responsible for all phases of electrical and Quality Control documentation, to include
The installation of Rigid conduit, cable tray, branch circuitry, high voltage, controls,
Duct banks, grounding, lighting, fire alarm and security systems. Tract cost codes,
Man hours and coordinated with my foreman and other crafts to meet scheduled dates
For the safe and productive completion of the project.
Electrical General Foreman June 2001 - Jan 2002
TIC Cement Plant
Midlothian, Tx
Pat Webber 409-***-****
Grass Roots Project
Responsible for all phases of electrical associated with Raw Feed to include
conveyors and scrapers. Coordinated activities with the client, engineering and
vendors to ensure all schedules were met.
Electrical Superintendent Feb 1996 - May 2001
CCC Group Inc.
Keith Holmes 201-***-****
Various Projects - Chemical, Power Plants, Liquid Oxygen. Witco Chemical Plant.
General Sup. Responsible for Piping, Civil, Structural crafts, Electrical and instrumentation
at Witco Chemical Plant.
Coordinated activities with the client, engineering and vendors to ensure all schedules were met.
(Air Liquide)
Journeyman Electrician
May 1979 - 1990
Various Projects
Worked 5 years for Brown & Root
Worked 4 years at Texas Eastman (Longview, Tx) in supervision for McCoy Electric
Installed all phases of electrical to include the instillation of cable tray; Rigid conduit. Duct
banks, grounding, lighting wire pulling and terminations of motors and controls and Quality
Control Documents.
Professional Licenses and Certificates
Texas Electrical Journeyman License #88734
Oklahoma Electrical Journeyman License # 87237
Arkansas Electrical Journeyman License # J-4657
California Electrical Journeyman License #125074
New Mexico Electrical Journeyman License #367227
Training
NCCER
NCCER Certified Instructor for NFPA 70E
Sexual Harassment
Supervisor
OSHA 10 Hours
Zero Accidents
Safety Leadership