PERSONAL INFORMATION
NAME : QUINTIN
SURNAME : GROENEWALD
ID NR : 830**********
LICENSE : CODE B
ADDRESS : * ***** ******
Valhalla
Centurion
SOUTH AFRICA
TEL NO : 072-***-****
E -MAIL : ********************@*****.***
MARITAL STATUS: MARRIED
HEALTH : EXCELLENT
HIGHEST GRADE : GRADE 12
EDUCATION
SCHOOL : GELOFTE HIGH SCHOOL
SUBJECTS : AFRIKAANS
ENGLISH
BUSINESS ECONOMICS
GEOGRAPHY
TECHNICAL DRAWINGS
HOTEL MANAGEMENT
PERSONALITY AND STRONG POINTS
I AM A HARD WORKING INDIVIDUAL WHO PULLS MY WEIGHT WITHIN THE TEAM. I AM A SOLID TEAM PLAYER WITH THE CAPACITY TO LEARN FAST. I AM HONEST AND HAVE GOOD PEOPLE SKILLS. I ENJOY A CHALLENGE AND STRIVE TO SOLVE ANY PROBLEM OR ISSUE IN MY AREA. I STRIVE ON EXCELLENCE.
TRAINING AND COURSES
• CONCRETE AND CEMENT INSTITUDE : SCT 20 ADVANCED CONCRETE/CIVILS
• MS PROJECTS
• MODIKWA PLATINUM MINE : COMPETANT A AND B
• MODIKWA PLATINUM MINE : FIRST AID
• MODIKWA PLATINUM MINE : GDI AND GAS DETECTION
• MODIKWA PLATINUM MINE : RIGGING
• MODIKWA PLATINUM MINE : RISK ASSESSMENT
• HAZMAT DRIVERS LICENCE
WORKING EXPERIENCE
2002 – 2003 SALES REPRESENTATIVES
TIGER WHEEL AND TYRE
DUTIES:
• STOCK TAKE
• STOCK CONTROL
• SALES AND CUSTOMER LIAISON • QUALITY CONTROL
• WHEEL ALIGNMENT OVERLOOK
• GENERAL HOUSEKEEPING
2003 – 2005 SITE FOREMAN 2005 – 2009 SITE MANAGER
NOORDWYK AGENCIES CIVILS
DUTIES:
• SETTING UP WORKERS CAMP
• PEGGING OUT WORKING AREA IN CONJUNCTION WITH ENGINEER
• CO-ORDINATING SUB-CONTRACTORS TO WHEN AND WHAT THEY MUST DO
• QUALITY CONTROL WITHIN BUILDING REGULATIONS (NHBRC)
• SAFETY MONITORING AS PER THE REQUIRED HEALTH AND SAFETY ACT
• CONTINUOUS LIAISON WITH COMMUNITY
• REPORTING BACK TO PROJECT MANAGER
• MANAGING ALL PLANT EQUIPMENT CIVIL WORK:
• ALL AS PER ENGINEERS SPECIFICATIONS
• GROUND PREPARATION
- CLEANING
- GRUBBING
- LEVELLING
- EXCAVATING TO SPECIFICATION
- BACK FILLING AS PER SPECIFICATION
- VIBRATE ROLLING
- TEMPING ROLLER
- GRID ROLLER
- GRADER
- TLB
- FRONT END LOADER
PROJECT COST: R38 MILLION
REFERENCE: MR J MINNIE 079-***-****
2010 – 2015
FOX PROJECTS (PTY) LTD
SITE SUPERVISOR
DUTIES:
• FULL SITE CONTROL
• DAILY SITE MEETING
• WEEKLY PROGRESS REPORTS TO PROJECT ENGINEER
• MONTHLY PROGRESS CERTIFICATES TO PROJECT ENGINEER
• STOCK ORDERING AS PER BILL OF QUANTITIES
• STOCK CONTROL (MATERIAL ON SITE)
• MATERIALS IN STORE – FULL ACCOUNTABILITY
• MATERIAL OUT OF STORE – ISSUE PER REQUISITIONS
• QUALITY CONTROL PLAN (QCP) – GENERAL APPROVAL / REJECTION
• COORDINATE SUB-CONTRACTOR PLANNING SCHULES START AND END DATES
• MILESTONES / TARGET REACHING
• SAFETY MONITORING
• RISK ASSESMENTS
• WAGES OVERVIEW
• CONTINUOUS LIAISON WITH INSPECTORS – SIGN CERTIFICATES
• CONTINUOUS LIAISON WITH ENGINEERS – SIGN CERTIFICATES
• CONTINUOUS LIAISON WITH CLIENTS
• CONTINUOUS LIAISON WITH COMMUNITY
• REPORTING BACK TO PROJECT MANAGER
• CIVIL WORKS
• ALL AS PER ENGINEERS SPECIFICATION
• GROUND PREPARATIONS
• MANAGING ALL PLANT EQUIPMENT :
GRADERS, ROLLER COMPACTORS, EXCAVATORS (20 TON, 30 TON, 80 TON AND 100 TON), DOZERS (D6 AND D8), TLB’s, ADT DUMP TRUCKS (20 TON, 30 TON, 80 TON AND 100 TON), MANITOUS, WATER CARS, CRANES(20 TON, 50 TON AND 100 TON AND FEL FRONT END LOADERS
MODIKWA PLATINUM MINE SOUTH SHAFT 2 2010 – 2012
• CONTRACT VALUE : R1 BILLION
• COMPLETE CONSTRUCTION OF NEW PORTAL DECLINE SHAFT (SOUTH SHAFT 2)
• INSTALLED NEW OVERHEAD POWER LINES
• BUILT TERRACES FOR MORE REAL ESTATE
• BUILT NEW ROADS WITH PIPE AND STORM WATER CROSSINGS USING ROCLA CULVERTS
• OVERSAW BLASTING OF PORTAL DECLINE
• OVERSAW BLASTING OF MATERIAL AND CONVEYOR DECLINES
• BUILT NEW TAILINGS DAMS
• BUILT ENGINEERING AND SERVICING WORKSHOPS
• BUILT SURFACE AND UNDERGROUND SUBSTATIONS
• INSTALLED NEW WATER LINES
MODIKWA PLATINUM MINE NORTH SHAFT 1 2012 - 2015
• CONTRACT VALUE R750 MILLION
• DEVELOPMENT, INSTALLATION AND EQUIPING OF 7, 8 AND 9 LEVEL
• OVERSAW MINING, DEVELOPMENT AND CONSTRUCTION CREWS
• INSTALLED ALL WATER AND AIR LINES WITH ELECTRICAL FLOW METRES AND VALVES
• INSTALLED ALL ELECTRICAL CABLES WITH SUBSTATIONS
• INSTALLED CONVEYOR BELTS AND CHUTES ON ALL LEVELS
• INSTALLED FIRE SUPPRESION SYSTEMS ON ALL LEVELS
• INSTALLED UNDERGROUND DAMS
• INSTALLED CHAIRLIFT FROM LEVEL 4 TO LEVEL 7 AND LEVEL 7 TO LEVEL 9 REFERENCE: Mark Cameron
No: 082-***-****
Robric Construction
January 2015 – December 2021
Site / Construction Manager
• FULL SITE CONTROL
• STOCK ORDERING AS PER BILL OF QUANTITIES
• STOCK CONTROL
• MATERIALS IN STORE – FULL ACCOUNTABILITY
• MATERIAL OUT OF STORE – ISSUE PER REQUISITIONS
• MILESTONES / TARGET REACHING
• IMPLEMENTING HEALTH AND SAFETY
• WAGES OVERVIEW
• CONTINUOUS LIAISON WITH CLIENTS
• CIVIL WORKS
• ALL AS PER ENGINEERS SPECIFICATION
• PROJECT PLANNING
• QUILITY MANAGEMENT
• COMPLIANCE, CONTRACTS AND REGULATION
• RISK MANAGEMENT
• PROJECT SCHEDULING
• MANAGING THE BASELINE
REFERENCE: Tina McComb
No: 072-***-****