Post Job Free
Sign in

Electrical Engineer Power Systems

Location:
Karachi, Sindh, Pakistan
Posted:
May 06, 2022

Contact this candidate

Resume:

Syed Shahid Hussain Rizvi

Flat No C*, United Corner Gulistan-e-Jauhar, Karachi

Mobile No. +92-323*******(Pakistan)

+92-310*******

Home +92-21-3-463****(Pakistan)

Email: *.*************@*****.***

Objective:

Seeking a changing and long term position in a well recorded organization to serve in sophisticated, competitive and dynamic environment with growth opportunities where my knowledge and skill could be best utilize as Site Electrical Foreman.

Personal Summary:

A competent electrical engineer with a comprehensive knowledge of designing, developing and maintaining electrical systems and components to required specifications, focusing on economy, safety, reliability, quality and sustainability. A consistent track record of successfully completing projects from the concept and detail of the design throughout implementation, testing and handover.

Responsibilities:

oIdentifying customer requirements, making models and prototypes of products.

oUsing computer-assisted engineering and design software.

oAttending meetings on site.

oPreparation of Electrical procedures for installation test & commissioning.

oReading electrical design specifications and technical drawings.

oOrganizing routine servicing schedules.

o Making sure all electrical engineering projects are fit for purpose.

o Liaising with and monitoring third party contractors.

oNegotiating with suppliers and purchase items at optimum cost.

oAttending meetings, writing reports and giving presentations to managers and clients.

Professional Skills:

1.Ability to supervise and manage LT/HT power system and electrical panel.

2.Ability to supervise and manage Low and High Motor Control Panel like variable motors.

3.Ability to supervise Maintenance and manage Automatic change over switch gear.

4.Ability to supervise and installation lightning like Fire Alarm, CC TV, Data & Telephone and Computer Data.

5.Troubleshooting and maintenance of Power Generators up to 1000KVA.

6.Excellent understanding and installation skill of low tension power system.

7.Excellent understanding and installation skill of Power Generator.

8.Excellent Troubleshooting analytical problem solving skills.

9.Excellent interpersonal and customer service skills.

10.Excellent oral communication and presentation skills.

Key Competencies and Skills:

Excellent practical skills

Physically fit for hard manual work

Safety conscious

Fault finding

Domestic Boilers

Energy and enthusiasm

Numeracy skills

Experience:

A)Company : CubeXS Weatherly (Pvt) Ltd.

Duration : 1st March 2016 till recent

Designation : Assistant Engineer

Responsibilities:

. Working in shifts

. Operating and maintaining 2 generators of 500KVA (Perkin generators)

. Operating, maintaining and repairing 16 ton HVAC

. Operating and maintenance of UPS, each 80KVA (ABB & Air Blue)

. Looking after the Data Center

. Troubleshooting of Data Center

. Provide training to the new comers regarding Electrical

B)Company : K Electric, Karachi, Pakistan

Duration : June 2015 to 25th February 2016

Designation : Assistant Engineer/AOC R2 (DHA)

Responsibilities:

. Worked in shifts

. Moved and acknowledged 3 teams of workers to high tension lines for troubleshooting and switching feeders

. Maintenance of Sub stations, PMTs and Transformers

. Visiting High Tension lines on major faults and moving a team to work on them

C)Company : Al Mansouryah Trading & Contracting Est., Riyadh, Saudi Arabia

Duration : October 2010 to September 2014

Designation : Site Electrical Supervisor

Projects:

During this period I was involved in Ground Plus Eleven Building (King Khalid University And Hospital In KSA) And 65 projects (Small Hospitals, ground plus one building structure) in total in different areas.

Responsibilities:

Test and Commissioning power system and lighting.

HVAC system commissioning and Installation of King Khalid University Hospital, KSA

Data and Telephone.

Fire Alarm System

CCTV

Ability to use mechanical digging equipment.

Always following strict safety procedures.

Experience of working on Installation and Maintenance of various projects.

Construction Safety Certification Scheme (CSCS).

Comprehensive knowledge of most major boiler manufacturers i.e. Motor Control Panels, Main Electric Control Room, Motors and Hydraulic Chambers and control panels.

Have substantial service and breakdown experience.

Knowledge of renewable energy systems such as heat pumps, solar and biomass boilers.

Having good building services and electrical knowledge.

Demonstrable experience in both servicing and installation.

D)Company : Ali Power Projects, Pakistan

Duration : January 1995 to September 2010

Designation : Technical Manager (Electrical Engineer)

Responsibilities:

Monitoring various “Total Power Systems” project.

Project estimation, Manage Tender with effective plan and coordination with supplier and consultant.

Communicate with vendor time to time to facilitate the services and other requirements.

Supervise to labor in friendly environments, absence of supporting staff I can configure independently by hand.

Project planning, Research, Consultancy, Installation and Maintenance.

Lead/Management/Marketing and Estimation.

Technical Documentation as per required.

Communicate with local companies.

Technical training technical to technical staff.

Total Power Systems.

Projects

M/s. Dawlance Manufacture Pvt. Ltd

Role: Research Installs and Manufactures LT Power System

Installed 1 Mega watt Gas generator (Caterpillar)

Commissioning and handing over to client.

Lighting and power distribution panels.

Install LT panels with 600mm sq armed cable.

After sale of equipments provide service and maintenance of all equipments and panels.

Completion of project on turn key basis.

M/s. Abbas Spinning Mills Pvt. Ltd

Role: Supply LT Power systems and lighting DBs(Complete Power Generation 2 mega watt).

Installed 1 Mega watt Gas generator (Caterpillar).

Commissioning and handing over to client.

Lighting and power distribution panels.

Install LT panels with 600mm sq armed cable.

After sale of equipments provide service and maintenance of all equipments and panels.

Completion of project on turnkey basis.

E)Company : National Shipping Corporation, Pakistan

Duration : March 1995 to December 1995

Designation : Trainee

Responsibilities: Maintenance and Troubleshooting Boilers, Motor Control Panels, Main

Electric Control Room, Motors and Hydraulic Chambers and control

panels.

F)Company : United Carpets Pvt. Ltd., Pakistan

Duration : November 1992 to February 1995

Designation : Stable Fiber Plant and continuous fiber yarn plant operator and

Maintenance officer.

Responsibilities: Installation of plants and Troubleshooting and operating Extruder Plant

and stable fiber plant.

Handing over the site after trained by Mr. Malcom from Plasticizer, UK.

Personal:

Father Name : Syed Wahid Hussain Rizvi

Nationality : Pakistani

Passport No. : DA9897591

NIC No : 422**-********

Date Of Birth : 1st January 1971

Marital Status : Married

KSA Driving License : Validity Till 03/03/2017

Qualification:

oDAE/Electrical - Jinnah Poly Technique, Karachi, Pakistan

Year 1992 with 1st division.

oWireman License - Govt. of Pakistan in 1991.

oMS Office 2000 and Internet - Libra Institute, Gulshan Iqbal, Karachi, Pakistan in 2000.

oH.S.C - Abuzer Ghaffari College, Bufferzone, Karachi in1989.

oS.S.C - Govt.Boys High Secondry School, Nazimabad, Karachi 1987

Dated: (Syed Shahid Hossain Rizvi)



Contact this candidate