VINAY CHAUDHARY
(MEP PROJECT ENGINEER)
UTILITY ENGINEER
H. No.-190, Sec-2, Old Gwal Pahari, Gurgaon- 122003
Contact: +91-797*******, 889*******; Email: *****.******@*****.***
MEP ENGINEER PROFESSIONAL –ELECTRICAL/MECHANICAL/PLUMBING/ HVAC/FIRE FIGHTING/ FALS/ IBMS/ CCTV/ ACCESS CONTROL/ PA SYSTEM
Sincere & focused professional with experience of 11+ years across Project MEP Work, Coordination of services,Execution, On site Designing, Testing and Commissioning of building Electrical & Mechanical Equipment and Systems for Commercial, Industrial,Hotels buildings. Currently spearheading as MEP Project Engineer with M/s NINANIYA ESTATES LTD.
Well versed in the Coordination & Management of Electrical, Plumbing, Fire Fighting System, FALS, HVAC, Building Automation/Controls, CCTV Construction Process, etc.
Multitasking credentials with excellent planning, execution, monitoring and resource-balancing skills, as well as the ability to handle multiple tasks in high-pressure environments and under tight deadlines.
Areas of Exposure
PROFESSIONAL EXPERIENCE
NINANIYA ESTATES LTD (NEL) NOV 2017 - SINCE MEP ENGINEER (NOVEMBER 2017-PRESENT)
About company –Incorporated in the year 2004, NEL is a dynamically leading real estate development company in Gurgaon, DELHI/NCR region and Rajasthan working in the process of building an array of IT Parks, Hotels, Commercial Complexes, Residential / Service Suites, Education Institutions and other infrastructure projects, is a name that has become synonymous with the highest quality, excellence and innovation in the field of real estate development. Ninaniya Group is proud of a spectacular track record in chosen sphere of business. The Ninaniya Group has successfully executed and commissioned a number of real estate projects as well as Education institutions, 5-Star Hotels, Corporate Towers, and Retail Malls.
NINANIYA Responsibilities:
Provide technical assistance and guidance to Engineers, contractors, building owners for Electrical & Mechanical works in HVAC, Fire fighting & Plumbing, Internal Electrical, Sub stations, Lifts, Dg Sets and STP works by conducting engineering standards in new and existing buildings.
Documented record of strong, decisive executive leadership, proven expertise in coordinating complex projects in a challenging environment and swiftly ramping/completing up projects with competent cross-functional skills and ensuring on time deliverables within pre-set cost parameters.
Project & Construction Planning Commercial &Industrial Infrastructure I Construction Supervision MEP Systems Installation
Quality and Safety Standards Project Coordination Contractor Management Erection & Commissioning Team Management Client/Contractor Coordination Project Engineering Project Planning & Scheduling Project Monitoring, Controlling & Execution Site Supervision Project Specifications & Standard Codes.
Adept in managing end-to-end project activities viz. planning & executing MEP program involving contract administration, budget management, resource planning, and procurement with a flair for adopting modern construction methodologies/techniques.
Persuasive communicator with skills in building consensus and obtaining commitments; successfully dealt with various projects including Hotels, High Rise Buildings, Offices, Commercials and Hospitals etc.
Well-versed with modern prevalent contractual practices, recruiting contractors, sub-contractors, organizing procurements, interpreting contractual obligations/ rights and evaluating techno-commercial problems and furnishing reports to the management. Acting as the focal point for delivery of inspection programs including communication with clients, suppliers & inspection of technical support; conducting internal & external design reviews
Looking after mechanical activities executed at site which includes revival of engineering drawings
Supporting cost control & forecasting activities in mechanical disciplines; handling internal & external claims and technical issues
Anchoring on-site erection, testing & commissioning activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
Reviewing erection & commissioning of entire MEP Works like HVAC, Electrical, Plumbing, Fire-Fighting, Gas & Compressor Piping, WTP, STP,CCTV,PA System, FALS, Access Control and IBMS etc.
Monitoring and ensuring that the quality of work assigned is excellent and complies well with the safety norms .Maintaining first- level quality assurance to confirm that the installation of all work within the discipline is in accordance with the plans, specifications, and industry standards .Ensuring that tests and inspections are performed, witnessed, and documented in accordance with approved procedures.
A.S MALHOTRA & ASSOCIATES PVT LTD May 2017– Nov 2017 ELECTRICAL PROJECT ENGINEER
About company–OFF: 15/8, DDA, Commercial Complex, NangalRaya, New Delhi-110046. Delhi is proficient company engaged in wide array of fields comprising of Electrical Projects in New & Existing Buildings and establishment of FLAS Projects in Buildings.
A.S MALHOTRA Responsibilities:
Responsible for the Execution,Monitoring of installation by several agencies,coordination of all E,M& P works,Technical correspondence with client & Consultant, Testing & commissioning of all Electrical -Mechanical Services for entire Project of below elaborated services :
Vcb,Transformer,Lt Isolation, DG Set, Bus Duct, Rising main, Distribution Board, Dimmer Panel,HT < Cabling, MATV, CCTV, Music, Car Calling, Earthing & Lighting Protection, Safety Equipment, External Lighting, Fire Alarm & Emergency Evacuation system
Internal Data & Voice Communication Installation works
Supervision of wiring work in project
Erection of LT Panel, Transformer, and DG set, Earthing system, rising mains
Supervision of Laying of HT & LT Cable
Supervision of Data & Telephone, Fire alarm system work.
Supervision of MATV, CCTV, AV & Car Calling system wiring
Make running & Final Billing of Project
MEC.ELECTRIC.CONTRACTS PVT.LTD May 2011to May 2017 ELECTRICAL PROJECT ENGINEER
About company – OFF: 505-Mohan Tower, Wazirpur Commercial Complex, and Delhi-110052.
This Company does all electrical work like as supply, installation,testing &commissioning of HT Panel, Transformer with Local LT isolation system, DG set & Acillaries,Bus Duct & Rising Mains, Power Distribution Equipments, Automatic Capacitor Control Panels,Dimmer Panel & Distribution Board, HT and LT Cable, Electrical Wiring, Voice & Data Communication system, MATV system Wiring, CCTV system Wiring, Music system & and Car Calling system Wiring,Lumeraires and Lamp, Earthing& Lighting Protection,Safety Equipment, External Lighting, Fire Alarm & Emergency Evacuation system.
MEC.ELECTRIC.CONTRACTS Responsibilities:
Responsible for the Execution,Monitoring of installation by several agencies,coordination of all E,M & P works,Technical correspondence with client & Consultant, Testing & commissioning of all Electrical -Mechanical Services for entire Project of below elaborated services :
Vcb,Transformer,Lt Isolation, DG Set, Bus Duct, Rising main, Distribution Board, Dimmer Panel,HT < Cabling, MATV, CCTV, Music, Car Calling, Earthing & Lighting Protection, Safety Equipment, External Lighting, Fire Alarm & Emergency Evacuation system
Internal Data & Voice Communication Installation works
Supervision of wiring work in project
Erection of LT Panel, Transformer, and DG set, Earthing system, rising mains.
Supervision of Laying of HT & LT Cable
Supervision of Data & Telephone, Fire alarm system work.
Supervision of MATV, CCTV, AV & Car Calling system wiring
Make running & Final Billing of Project
UTTAM.ELECTRICALSAPRIL 2010 to MAY 2011 ELECTRICAL ENGINEER
About company – OFF: 13/16, DDA Complex, Nagal Raya, and New Delhi-110046.This Company does all electrical,Plumbing, carpentry, interior work in Hotels
UTTAM ELECTRICALS Responsibilities:
Responsible for the Execution, Monitoring of installation by several agencies, coordination of all E,M& P works.
Internal Data & Voice Communication Installation works
Supervision of wiring work in project
Erection of LT Panel, Transformer, and DG set, Earthing system, rising mains.
Supervision of Laying of HT & LT Cable
Supervision of Data & Telephone, Fire alarm system work.
Supervision of MATV, CCTV, AV & Car Calling system wiring.
Make running & Final Billing of Project.
Supervision of plumbing, carpentry, interior work in project.
ACL (Asian Concretes & Cement Pvt. Ltd) DECE 2009 to APRIL 2010
Production ENGINEER
About company – OFF: Bir Palasi,P/o: Manjholi, Teh. Nalagarh, Distt. Solan, Himachal Pradesh Pin Code -174001. ACL is joint venture company with equity participation from ACC limited, The Indian cement giant, since 2010. The company has now two cement grinding plant with aggregate capacity of 1.3 MTPA.
ACL Responsibilities:
Check quality of cement.
Check blain of cement.
Check clinker, fly ash and gypsum percentage in cement.
To Make Daily Production report.
Projects Undertaken
NEL Project:- Prism Portico Hotel, Sec-89, Gurgaon (HR)-
NEL Project:- Prism Portico Mall & IT Park, Sec-89, Gurgaon (HR)
NEL Project:- Sheraton-Marriott Hotel, Prism Tower, Sec-2, Gwal Pahari, Gurgaon (HR)
NEL Project:- Golden Tulip Suites Hotel, Prism Tower, Sec-2, Gwal Pahari, Gurgaon (HR)
NEL Project::-Prism Corporate Tower, Prism Tower, Sec-2, Gwal Pahari, Gurgaon (HR)
A.S MALHOTRA& ASSOCIATES Project:-Club Mahindra Pristine peaks Hotel Naldehra (Near State Fire Training Centre Naldehra shimla H.P In, Naldhera, Himachal Pradesh)
MEC ELECTRIC CONTRACT Project :- Marriot Hotel Jaipur (Near, Ashram Marg, Jawahar Circle, jaipur Rajasthan Pin 302015)
MEC ELECTRIC CONTRACT Project :-Hilton Hotel Jaipur ( 22 Goddam, Mangalam Geejgarh house-42,Hawa Sadak, Jaipur, Rajasthan)
MEC ELECTRIC CONTRACT Project :-Southern Grand Hotel Jaipur (6D,Station Road, Khasa Kothi,Villa, Bani Park Jaipur, Rajasthan)
MEC ELECTRIC CONTRACT Project :-Fair Field Marriott Hotel, Near New High court, Jodhpur(RAJ)
Uttam Electrical Project :-Impearl appartment Hotel Lajpat Nagar ( Delhi )
Projects Description
Prism Portico Hotel, Mall & IT Park Sec-89, Gurgaon (HR)
(1)HVAC System:- 04x325TR- Water Cooled Screw Chillers
(2)Electrical System:- 03x1600KVA Dry type transformers, 05x1250KVA DG System
(3)Fire Fighting System: - 02x250KL Capacity of underground tanks, 04X25KL Capacity of OHT.
(4)Hydro-Pneumatic System:- 02x180KL Capacity of WTP, 02x150KL Capacity of STP.
Prism Tower, Sheraton-Marriott Hotel/ Golden Tulip Suites Hotel/Corporate Tower, Sec-2 Gurgaon (HR)
(1)HVAC System:- 03x300TR- Hitachi make Water Cooled Screw Chillers
(2)Electrical System:- 02x2000KVA Dry type transformers, 04x1000KVA DG System
(3)Fire Fighting System: -02x250KL Capacity of underground tanks, 03X25KL Capacity of OHT.
(4)Hydro-Pneumatic System: - 02x130KL Capacity of WTP, 02x150KL Capacity of STP.
(5)Escalator system: - 14 No’s Lifts make of ThyssenKrupp.
(6)FALS- Addressable type make of Siemens.
(7)IBMS- Entire building automation make of Siemens.
Club Mahindra Pristine peaks Hotel Naldehra (HP)
1)Electrical System:- 01x2200KVA ONAN type transformers, 02x500KVA DG System
2)Electrical System:- 02x2200KVA VCB System
Marriot Hotel Jaipur (RAJ)
1)Electrical System:- 02x2000KVA ONAN type transformers, 04x1000KVA DG System
2)Electrical System:- 01x4000KVA VCB System
Hilton Hotel Jaipur (RAJ)
1)Electrical System:- 02x1600KVA ONAN type transformers, 03x750KVA DG System
2)Electrical System:- 01x650A VCB System
Southern Grand Hotel Jaipur (RAJ)
1)Electrical System:- 01x650KVA ONAN type transformers, 02x250KVA DG System
2)Electrical System:- 02x650KVA VCB System
Fair Field Marriott Hotel Jodhpur (RAJ)
1)Electrical System:- 01x1150KVA ONAN type transformers, 02x750KVA DG System
2)Electrical System:- 01x350A VCB System
Impearl Apartment Hotel Lajpat Nagar (Delhi)
1)Electrical System:- 01x750KVA ONAN type transformers, 02x250KVA DG System
2)Electrical System:- 01x750KVA VCB System
EDUCATIONAL CREDENTIALS
Electrical Polytechnic Engineering, 2009
Punjab Technical University Chandigarh (PTUC)
B.SC. Graduation 2006
Himachal Pradesh University Shimla.
Hobbies: Writing and Listening to Music
Permanent Address: Village + Post - Luhna, Teh- Baroh, Distt. - Kangra (H.P) Pin Code - 176037
References: Available on Request
Project MEP Work Quality Check and Assurance Estimation and Costing Strategic Planning Site MEP Construction Work Operations Work Project Risk Analysis Design Reviews Installation & Commissioning Maintenance Managing Work
Engineering drawing of various layouts like floor and ceiling Plane, layout of piping and Ducting, Layout and routing of cable,tray,lighting,Power electrical Point, Schematic DWGS, SLD,Coordination DWGS,and General Arrangement DWG (GA).
Installation, Commissioning and test procedures, schematic diagrams and specifications.
Building on site design as per site condition and construction report generation, problem resolution and quality assurance.
International code Council (ICC), National Electrical Code (NEC), Electrical on site calculation as per Design, HVAC on site calculations, ASHRAE Standards, ISHRAE Standards, SMACNA, NFPA standards &National Building Codes (NBC) Codes.
On Site designing changes as per actual condition by using AutoCAD.