Post Job Free
Sign in

Engineering Corporation Foster Wheeler

Location:
India
Salary:
75000Rupees per month
Posted:
April 29, 2022

Contact this candidate

Resume:

CURRICULAM VITAE

SRINIVAS RAO

Email id – ********.********@*****.***

Mob. No- 908*******, 786-***-****

Objective:-

To have a challenging career in a growth oriented and leading edge organization that recognize and value individual’s contribution and which provides opportunities for continuing growth and advancement.

Expertise:-

Think critically, learn quickly, develop expertise and produce immediate contributions.

Dedicated, responsible and organized, enjoy a challenge and thrive under a pressure of focused activity.

Ability to work both in an autonomous and team capacity.

Adaptable, easily cope with people

Qualifications:-

July-2015 Diploma in Mechanical from Janardan Rai Nagar Rajasthan Vidhya Pith University, Rajasthan.

2006 : B.A.

2000 : ITI in Fitter NCVT Jabalpur.

Fab2004: Certificate course in Tally.

Dec2005: Certificate course in M S office.

Total Work Experience: 6 Aug’2000 to till date (21Years 02 month Work Experience)

Work Experience :-

(1) Ayoki Fabricon Pvt. Ltd.

Current Project : Cuttack Cement Plant, Ultratech, Cuttack, Odisha.

Client : Ultratech Cement Plant.

Consultancy : Tata Project Ltd.

Working Period : 25-10-21 to continue.

Job Responsibilities : As a lead Mechanical of Clinker Building Area.

All type of Mechanical Wok like that Erection works of Steel structures, gallery, conveyer, Hopper, Bag filter,chut & proper utilizations of manpower & equipment’s.

Pre-assembly checking.

Coordination with Client’s and contractors.

Planning of Man power and execution of work.

Contractor RA Bill checking for Steel Structural Erection Work.

Inspecting the work as per the drawing.

Maintaining the work progress according to QAP.

Preparations of joint measurement report of billing purpose.

Preparations od daily progress report and Erection plan.

(2) Haji AP Bava Company Pvt. Ltd.

Current Project : J. K. Luxmi Cement, Sirohi, Rajasthan.

Previous Project : Ultrateck Nathdwara Cement Works, Sirohi, Rajasthan.

Previous Project : Ambuja Cement Project, Marwad-Mundwa, Nagor, Rajasthan.

Working Period : 10-Mar-2021 to 04-10-21.

Job Responsibilities : As a Lead Raw mill Bag house.

All type of Erection works of Raw Mill bag House & proper utilizations of manpower & equipment’s.

Pre-assembly checking.

Coordination with Client, PMC and contractors.

Planning of Man power and execution of work.

Inspecting the work as per the drawing.

Maintaining the work progress according to QAP.

Preparations of joint measurement report of billing purpose.

Preparations daily progress report and Erection plan.

(3) Petrofac International (UAE) LLC India.

Project : Integrated Gas Surface Facilities for RDG Field.

Client : Vedanta – Cairn Oil and Gas.

Consultancy : Warley Persons.

Working Period : 10-May-2019 to 30-Sep-2020.

Job Responsibilities: As a Lead Steel Structure Erection& Fabrication (Construction Resources).

All type of Erection works of Steel structures & proper utilizations of manpower & equipment’s.

Pre-assembly checking.

Coordination with Client’s and contractors.

Planning of Man power and execution of work.

Contractor RA Bill checking for Steel Structural Erection Work.

Inspecting the work as per the drawing.

Maintaining the work progress according to QAP.

Preparations of joint measurement report of billing purpose.

Preparations od daily progress report and Erection plan.

(1)KSS PETRON PVT LTD :-Working Period (19-Dec-11 to 30-Apr-19)

(a)Project : LNG Import, Storage & Regasification Terminal Project.

Client : Indian Oil LNG Project Pvt ltd.

Consultancy :Amec foster Wheeler.

Working Period : 06-Jul-2016 to 30-Apr-19

Job Responsibilities : As a Steel Structure Fabrication and Erection lead for LNG Import, Storage & Regasification Terminal Project Structures Fabrication (4000 Ton)& Erection(4000 Ton) and all related documentation.

Raw material Indent Preparation and inspection. Materials follow-ups from suppliers & contractors.

All type of Fabrication & Erection works of Steel structures & proper utilizations of manpower & equipment’s.

Pre assembly checking.

Layout checking of Roof Truss, Monitor truss, Gussets Plates etc.

Co ordination with Client’s and contractors.

Planning of Man power and execution of work & Contractor Billing of Structural Steel Fabrication, Erection Work.

Inspecting the work as per the drawing.

Maintaining the work progress according to QAP.

Preparations of joint measurement report of Billing purpose.

Preparations daily progress report and Fabrication and Erection plan.

(b)Project :Hafeshwar Regional Water Supply Scheme.

Client : Gujarat water supply and sewerage board.

Consultancy : Mars Consultancy services

Working Period : 08-Mar-2014 to 02-Jul-2016.

Job Responsibilities : As a Lead Structural bridge Fabrication & Erection and M. S.,

HDPE in various dia meter pipe laying Hydro testing and commissioning.

(c)Project : 5000 TPD ChittorgarhCement Plant Project.

Client : Lafarge India Project Pvt. Ltd.

Consultancy : Lahmeyer International India pvt. ltd.

Working Period : 19-Dec-2011 to 07-Mar-2014

Job Responsibilities : As a Structural Superintendent Fabrication work.

Raw material Indent Preparation and inspection. Materials follow-ups from suppliers & contractors.

All type of Fabrication & Erection works of structures steels & proper utilizations of manpower &equipment’s.

Pre-assembly checking.

Layout checking of Roof Truss, Monitor truss, Gussets Plates etc.

Co ordination with Client’s and contractors & maintaining the daily progress report.

Planning of Man power and execution of work & Client, Contractor Billing of Structural Steel Fabrication, Erection Work.

Inspecting the work as per the drawing.

Maintaining the work progress according to QAP.

Preparations of joint measurement report of Billing purpose.

(2)Simplex Infrastructures Ltd.

Project : 500X2 MW NTPC Power Plant Project, Rihandnagar, Sonbhadra, UP.

Client : NTPC Ltd.

Consultancy : NTPC Ltd.

Working Period : 09-May-2011 to 15-Dec-2011

Job Responsibilities : As a Foreman Structure Fabrication work.

Fabrication works of all type of Steel structures & proper utilizations of manpower & equipments.

Pre assembly checking.

Layout checking of Roof Truss, Gussets Plates etc.

Co ordination with Client’s and contractors & maintaining the daily progress report.

Planning of Man power and execution of work & Client Billing of Steel Structural Fabrication Work.

Inspecting the work as per the drawing.

Maintaining the work progress according to QAP.

Preparations of joint measurement report of Billing purpose.

(3)NCC Ltd.

Project : 2.5 MTPA new stream expansion.

Client : SAIL-IISCO Steel Plant Burnpur, West Bengal.

Consultancy : Mecon Ltd.

Working Period : 01-Apr-2009 to 04-May-2011

Job Responsibilities : As a Supervisor Mechanical Fabrication Work.

Raw Material (Structure Steels) Indent Preparation. Materials follow-ups from suppliers & contractors.

Fabrication works of all type of structures steels & proper utilizations of manpower & equipments.

Pre assembly checking.

Layout checking of Roof Truss, Monitor truss, Gussets Plates etc.

Co ordination with Client’s and contractors & maintaining the daily progress report.

Planning of Man power and execution of work & Contractor Billing of Structural Steel Fabrication Work.

Inspecting the work as per the drawing.

Maintaining the work progress according to QAP.

Preparations of joint measurement report of Billing purpose.

(4)Punjstar Insulation Fiber Company (A unit of NGP Industries Ltd)

Project : Expansion of Rockwool &Fiber Plant Project.

Client : Punjstar Insulation Fiber Company (A unit of NGP Industries Ltd)

Consultancy : Punjstar Insulation Fiber Company (A unit of NGP Industries Ltd)

Working Period : 01-Apr-2006 to 25-Mar-2009

Job Responsibilities : As a Supervisor Project & Maintenance.

Fabrication works of all type of Steel Structures & proper utilizations of manpower & equipments.

Pre assembly checking.

Layout checking of Roof Truss, Monitor truss, Gusset plate & Fabrication Slag cutting m/c, Rockwool Pipe cutting m/c, Pipe Grinding m/c, Material shifting trolley, Blower Body with Fan, Duct etc.

Maintaining the daily progress report.

Planning of Man power and execution of work.

Inspecting the work as per the drawing.

Maintaining the work progress according to QAP.

(5)A J Industries, Bhilai

Project : Sponge Iron Plant Fabrication.

Client : Beekay Engineering Corporation Ltd.

Consultancy : Beekay Engineering Corporation Ltd.

Working Period : 06-Aug-2000 to 31-Mar-2006

Job Responsibilities : As a Supervisor fabrication in workshop.

Raw material Indent Preparation and inspection. Materials follow-ups from suppliers & contractors.

Inspection of welding, Pre-assembly checking.

All type of Fabrication works of structures steels & proper utilizations of manpower &equipment’s.

Layout checking of Leverage Frame, Roof Truss, Transfer Chute, Hopper, Gussets Plates etc.

Co ordination with Client’s and contractors & maintaining the daily progress report.

Planning of Man power and execution of work & Client, Contractor Billing of Structural Steel Fabrication Work.

Inspecting the work as per the drawing.

Maintaining the work progress according to QAP.

Preparations of joint measurement report of Billing purpose.

Personal Details

Father’s Name : Late Shri E. Appalaswamy

Date of Birth : 28.02.1980

Marital Status : Married

Gender : Male

Languages known : Telugu, English & Hindi

Permanent Address : S/o Late Shri E. Appalaswamy

Q-No 11/H, Street-37/A, Sector-7, Bhilainagar, Ditt.-Durg.

State- Chhattisgarh, Pin code -490006

DECLARATION

I hereby declare that all the details furnished above are truth to best of my knowledge and belief.

(Srinivas Rao)



Contact this candidate