Post Job Free

Resume

Sign in

Pipefitter Power Plant

Location:
Beaumont, TX
Posted:
April 29, 2022

Contact this candidate

Resume:

JONATHAN P GUNN

**** * * * **** JR PKWY APT **

BEAUMONT, TX 77705-6635

Phone: 409-***-****

Email: adqw28@r.postjobfree.com

Objective

Seeking a position as a field piping inspector or as a piping supervisor either as a piping foreman or as a general foreman. I am an NCCER PLUS pipefitter and NCCER instrumentation fitter. Employment History

Pipe General Foreman

12/2018 - 06/2019 Performance Contractors 4219 RED BLUFF, PASEDENA, TX Oversaw the installation and fabrication of piping with 2 foremans and 27 employees oversaw4 areas also maintained all progress, time, and ordering of materials

Pipe General Foreman

03/2018 - 11/2018 Sun Industrial Hackberry, LA

Oversaw 2 pipe crews in the fabrication,erection,and testing of piping spools at Cameron LNG facility. Also maintained all progress and time sheets for 20 employees.

Lead Pipefitter Foreman

07/2017 - 03/2018 bechtel construction PORT ARTHUR, TX supervised and coordinated the fabrication,instalation of piping spools and equipment at the Sbine Pass LNG facility Lead Pipefitter

03/2017 - 05/2017 JVIC Freeport, TX

Lay out, assemble, install, or maintain pipe systems, pipe supports, or related hydraulic or pneumatic equipment for steam, hot water, heating, cooling, lubricating, sprinkling, or industrial production or processing systems. Pipe Foreman

10/2015 - 02/2017 Bechtel Construction TX

direct pipe crew of 14 in the fabrication,installation,of piping spools,vaives,supports,etc according to isometric or field measurements made by the client in the construction of an LNG Facilty. LEAD PIPEFITTER FOREMAN

11/2014 - 04/2015 PERFORMANCE GALENA PARK, TX

DELEGATION OF ALL WORK AND CONSTRUCTION PACKAGES TO FORMAN AND EMPLOYEES. ALSO COMPLETED ALL TRACKING PROGRESS OF ALL 5 AREAS THAT I WAS RESPONSIBLE FOR ON A WEEKLY BASIS

Lead Pipe Foreman

06/2014 - 11/2014 Performance Contractors Baton Rouge, LA JONATHAN GUNN

Directed 3 pipe Foreman's and there people in fabrication and installation of piping packages to be worked in an operating unit (revamp project) also performed all General Foreman duties such as time keeping,daily and weekly progress reports gathering of all RFI'sand EWO's

LEAD PIPEFITTER

04/2014 - 06/2014 JVIC INDUSTRIAL 4040 RED BLUFF RD, PASEDENA, TX AS AN NCCER PLUS PIPEFITTER I AM RESPONSIBLE FOR THE INSTALLATION OF PROCESS PIPING THAT NEEDS TO BE REPLACED ACCORDING TO FIELD VERIFIABLE MEASUREMENTS LEAD PIPEFITTER/PIPE FOREMAN

03/2014 - 04/2014 JVIC INDUSTRIAL 228 COMMERCE RD, FREEPORT, TX SUPERVISED PIPING CREW IN THE INSTALLATION OF PROCESS PIPING ALSO USING P&IDS ORGANIZED AND OVERSAW PREPARATION FOR TEST PACKAGES (HYDROSTACTIC,PNUEMATIC) FOR UNIT EQUIPMENT VESSELS,EXCHANGERS,BOILERS ETC.

pipefitter foreman

09/2013 - 02/2014 zachry construction SAN ANTONIO TX., PASEDENA, TX supervise piping crew in installing process piping in piperack strcture of power plant unit.plan,assign work duties to workers insuring that all piping is assembled and installed according to isometric drawings and field measurements. General Forman

06/2012 - 08/2013 S & B TX

•Supervise, coordinate, or schedule the activities of construction or extractive workers. •Read specifications, such as blueprints, to determine construction requirements or to plan procedures. •Inspect work progress, equipment, or construction sites to verify safety or to ensure that specifications are met. •Locate, measure, and mark site locations or placement of structures or equipment, using measuring and marking equipment. •Coordinate work activities with other construction project activities. •Assign work to employees, based on material or worker requirements of specific jobs.

•Estimate material or worker requirements to complete jobs. •Confer with managerial or technical personnel, other departments, or contractors to resolve problems or to coordinate activities. •Order or requisition materials or supplies.

•Analyze worker or production problems and recommend solutions, such as improving production methods or implementing motivational plansAlso I was the coordinator for all testing packages in the mechanical completion of the unit my duties included coordinating testing between S&B and JVIC. PIPEFITTER FOREMAN

09/2011 - 05/2012 Turner TX

•Examine and inspect work progress, equipment, and construction sites to verify safety and to ensure that specifications are met. •Read specifications, such as blueprints, to determine construction requirements or to plan procedures.

•Estimate material or worker requirements to complete jobs. •Supervise, coordinate, or schedule the activities of construction or extractive workers. •Confer with managerial or technical personnel, other departments, or contractors to resolve problems or to coordinate activities. •Coordinate work activities with other construction project activities. •Order or requisition materials or supplies. •Locate, measure, and mark site locations or placement of structures or equipment, using measuring and marking equipment. •Record information such as personnel, production, or operational data on specified forms or reports. •Assign work to employees, based on material or worker requirements of specific jobs. PIPEFITTER/FABRICATOR

07/2011 - 09/2011 RCI Beaumont, TX

Fit and fabricate piping spools according to isometric drawings and install piping components and equipment according to field dimensions.

JONATHAN GUNN

PIPEFITTER/FABRICATOR

03/2011 - 06/2011 Becon construction MOTIVA REFINERY, PORT ARTHUR, TX Fit and fabricate piping spools according to isometric drawings and install piping components and equipment according to field dimensions.

PIPEFITTER/LEAD PIPEFITTER

02/2009 - 02/2009 ZACHRY INDUSTRIAL INC (SAN

ANTONIO)

INSTALATTION OF PROCESS PIPING,EQUIPMENT,AND SUPPORTS ACCORDING TO ISOMETRIC DRAWINGS AND USING FIELD VERIFIED MEASUREMENTS .

PIPEFITTER

02/2008 - 06/2008 CPP SAN ANTONIO, TX., SAN ANTONIO,TX., TX Fabrication and installation of piping systems according to isometric drawings. PIPEFITTER

07/2007 - 08/2007 Bay Ltd. CORN PRODUCTS RD., CORPUS CHRISTIE,, TX

Fabrication and installation of piping systems according to isometric drawings. LEAD PIPEFITTER

10/2006 - 06/2007 JVIC TX

Fabricate and install piping using isometric drawings. PIPEFITTER FOREMAN

01/2005 - 05/2006 WYATT VIRGIN ISLANDS Vergin Islands, TX Supervised sixteen personnel who performed shutdown work and pipefitting. PIPEFITTER

12/2005 - 12/2005 CASEY INDUSTRIAL SAN ANTONIO, TX Pipefitter

PIPEFITTER

08/1999 - 06/2003 ZACHERY CONSTRUCTION TX

Performed duties of pipefitter to pipefitter foreman. Supervised twelve personnel that performed pipefitter work. PIPEFITTER

04/2001 - 12/2001 FLUOR DANIEL SVC TX

Pipefitter fabrication and installation of piping systems according to isometric drawings. JONATHAN GUNN

PIPEFITTER

03/2001 - 07/2001 FLUOR DANIEL TX

Skilled pipefitter that performed fabrication and installation. Education and Training

Completion

Date

Issuing

Institution

Location Degree Received Course of

Study

Southwest High

School San Antonio, TX High School Diploma

U S Army Unknown Level Military

Training

University of

Colorado

Colorado Springs,

CO

2 Years at College or a Technical or

Vocational School

Occupational Licenses & Certificates

Certification Title Issuing Organization Completion Date Transportation Worker Identification Cre Department of Transportation NCCER Plus Pipefitter and NCCER Instrume National Center For Const, Educ. and Research JONATHAN GUNN



Contact this candidate