CURRICULAM VITAE
ELECTRICAL TECHNICIAN
P.K.Jagan,
Tamilnadu,
India – 607105
Email- ********@*****.***
Mobile Number: +91-887*******
Alternate Number: +91-638*******
POST APPLYED FOR ELECTRICAL TECHNICIAN
OBJECTIVE
Achieving a higher position oil field utilizing my capacity updating myself with the current technology.
Looking for a successful career in Onshore and offshore oil field as a Electrical Technician
PROFILE
11+years Experience in Maintaining electrical equipment’s
Having good practical skills; Quick learner. Work well independently or on a team.
Able to live and work away from home for long periods. Completed all basic safety courses; Aware of
safety issues.
Having good communication skills in English and Hindi languages
RESPONSIBILITY:
Planning of man power& equipment
Supervision of erection,installation
Carry out site installation tests
Preparation of daily,weekly& monthly schedules and progress reports
Testing of HV,LV and control cables
Handling of HV/LV Meggers, Ductor meters
Interact with clients & Consultants
Maintenances activities
Preparation development of details termination schedule for technicians
TOTAL EXPERIENCE : 10 years
WORK EXPERIENCE
Parry India Limited :
Electrical Technician
Jan2014 – Present
(India)
UCIC – Saudi Arabia :
Electrical Technician
Sep-2011 – Jan-2012
(Saudi Arabia)
Cummins Power Generation:
Electrical Technician
Jan 2008 - April-2010
(Maharashtra)
KNOWLEDGE OF ELECTRICAL WORK
All Type Motors Servicing And Bearing Changing.
Attending Breakdowns of textile machines; Repairing; Servicing.
Transformer Maintenance. Changing Oil; Changing Brass bar; Troubleshooting and checking all meters.
Making Panel Boards; Checking boards periodically.
Installing and wiring 300, 400 Cables.
Maintenance of Machine Panel Boards
Maintenance of electrical & mechanical equipment Servicing electric motors
Glycol Pump Motor Servicing
Turbine Cooling Fan Motor daily Maintenance
Regular plant and field maintenance
Compressor Motor(45 hp) Checking And Starter Maintenance
Daily maintenance For CTP pump and M oil pump
Lighting, Fire alarm system, UPS and Battery bank installation and testing
Control, Instrument and Power cable testing
Switchgear Operating Procedures & As built drawings
Erection Work of the electrical installations
Maintenance and inspection of control panel
Installation of new power equipment’s and new instrumentation for oil/gas industry
Installation and maintenance of various electrical equipment’s
All Type Motors Servicing And Bearing Changing
Daily maintenance For CTP pump and M oil pump
Lighting, Fire alarm system, UPS and Battery bank installation and testing
Control, Instrument and Power cable testing
Switchgear Operating Procedures & As built drawings
Erection Work of the electrical installations
Maintenance and inspection of control panel
Check all high speed bearings and renew if necessary
Blow out all motor windings thoroughly with clean dry air
Installation of step down Transformer(20MVA,3.15MVA).
Installation of HVAC Distribution auto transformer(160KVA)
Installation of lighting panel, control panel, UPS panel, variable frequency drives (VFD), HVAC power and
control panel..
Installation of street light pole and high pressure sodium vapour lamp.
Cable laying from 1 sq.mm to 240 sq.mm in trench and trays.
Cable gland and termination in panel side and field equipment side.
Installation of Instrument JB and frame.
Electrical power and Instrument primary & secondary cable testing.
Installation of instrument secondary cables from JB to field instrument.
Cable gland and termination in instrument JB side and field instrument side.
Installation of fire detecting equipment. ( Manual call point, Bell, Beacon, Gas
detector(METHANE)Combined heat and smoke detector)
Installation of telecom equipment (Speaker, Badge reader, Exit push button, Status contact, EEX speaker
&JB.
Installation of Heat traces cables for Caustic pipe lines.
Installation of Power and end termination for heat traces cables.
Installation of HVAC instruments.
Installation of Plant earthing and all kinds of equipment earthing.
Overhaul motors which has been subjected to severe operating conditions
Check insulations resistance to earth between phases of motor windings, control gear and wiring
EDUCATION
DIPLOMA IN ELECTRICAL AND ELECTRONICS ENGINEERING
SAFETY TRAINING
Fire Prevention & Fire Fighting
Personal Survival Techniques
Personal Safety &Social Responsibilities
Elementary First Aid
PERSONAL PROFILE
Date of Birth : 11-03-1983
Nationality : Indian.
Marital status : Unmarried.
Passport no : U4534322
Date of issue : 24/02/2020
Date of expiry : 23/02/2030
Address : S/o P. Kasinathan
24, Anna Nagar,
Nellikuppam-607105,
Cuddalore – District,
Tamilnadu
India.
DECLARATION
I hereby declare that the above information and particular given by me is complete and correct to the best of my
knowledge.
Place : Yours Sincerely,
Date : PK Jagan