Mohammad Khalil Akhtar
MEP Project manager
Member of ASME, ASHRAE
Mobile: +971**-*******
E-Mail: **************.******@*****.***
Seeking assignments in Project with a growth oriented organization of repute. Snapshot
A dynamic professional with 17years of experience (14years in UAE) in different MEP works Project Execution
& Management, Installation & Commissioning, Design, Construction, Green Building Requirements and Site Engineering with well reputed clints like EMAAR, Eagle Hills, Al Ghurair and Al Attar.
Knowledge in monitoring new projects with respect to cost, resource deployment, time over-runs and quality compliance for ensuring their execution within time & cost parameters.
Resourceful in conducting cost benefit analysis of projects including the feasibility studies, assessment of requirements, adaptation, quality, installation, testing and commissioning.
Expert knowledge in Design, supervision and estimation of HVAC, firefighting, plumbing / drainage & water supply system as well as other mechanical services such as irrigation, water features, lifts, garbage chute, etc.
Lead Engineer (MEP) with knowledge NFPA regulations, ASHRAE, SMACNA Codes, Plumbing, Drainage, HVAC
(Cooling Tower, Chillers, VRF, Dx System, VAV, CCU), Gas and installation experience on all types of system Key Skills
MEP Project Management
Mechanical Design, supervision
F & B Fit out, Offices & shops supervision and design
Strategic Planning
Operations
Quality Management
Material Management
Team Management
Commission ability reviews
Strong organizational skills
Expert knowledge of codes & regulation's
Excellent communication skills
FIDIC and contract administration
Core Competencies
Project Management
Daily site visit for survey of progress, quality, safety and co-ordination with main contractor’s engineers representatives.
Prepare & carryout labor histogram as per main contract construction program.
Execute the job as per Main Contractor Program and prepare the work Schedule as per site requirement.
Attend the Meetings (Internals & Externals) with Consultant/Main Contractor & Sr. Manager.
Control the Site Engineers, Supervisors & Monitor labor distribution.
Monitor the Store & Material Requirement as per site execution flow.
Monthly review of Commercial Status with Sr. Project manager & Area Manager.
Look ahead of the overall requirement of labor & staffs, material, safety, approvals with consultant and report to Sr. Manager.
Carry all responsibility as management representative of company in terms of procurement functions in the site.
Conduct progress Daily/Weekly/Monthly meetings with Engineer, QA/QC Engineer, Safety Officers for Planning, prepare daily activity report and labor allocation and lead the team on day basis.
Contact Suppliers in order to schedule or expedite deliveries and to resolve shortages, missed or late deliveries and other problems with suppliers.
Follow-up and monitoring of long lead item and Critical Supplies with procurement schedule.
Inspection of MEP services and Snagging and de-snagging of all services.
Review of handing over and DLP documents.
Review Spare parts and AMC documents.
Supervision
Review project proposals, baseline program, shop drawing, material submittal, Technical submittal, method statement and pre-qualification according to specification and contract within time frame.
Responsible for the following- Technical specification writing, review and evaluation of RFP, technical evaluation of vendor/ supplier, developing and implementing a QA/QC procedure, preparing technical schedule equipment data sheet, technical review/evaluation of tender proposal, value engineering.
Prepare site observation reports and NCRs, inspect and verify contractor’s snagging/de-snagging activities, raising safety issues with the safety officer, witnessing of testing and verification mechanical system, the site conditions are properly addressed in the as-built drawings submitted by contractor.
Replying any technical concerns raised by Main Contractor based on project documents.
Conducting MEP meetings, schedule and management necessary to monitor and manage the project.
Carrying out inspection for material (chiller, pump, FAHU, FCU etc.), installation and opening in concrete slabs, for Water, Drainage, HVAC, Fire Fighting & LPG, NG systems etc as per approved builders work drawings.
Carrying out inspection for installation of the HVAC, plumbing, water supply firefighting & LPG system during the construction, in accordance with technical, quality and safety requirements.
Coordinating and assisting to main contractor for authority submission and inspection (DEW,DM,CD)
Preparing schedule of testing commissioning and documents as per project budget and baseline program.
Carrying out pre-commissioning & commissioning inspections.
Ensure safety standards at site.
Pre-commissioning check-ups and the commissioning of the MEP systems, handover systems to the clients’ representatives.
Prepared the handing over documents (O & M Manual, drawings, certificates, spare parts etc...), Work alongside the FM team to ensure operational expectations are meet, Lead the review of all relevant handover information alongside the FM team.
Coordinating with client and contractor.
BMS, Swimming pool, Garbage chute, BMU and lift installation work inspection and monitoring. Design
Prepare concept design report and develop concept design report as per client requirements for Design Built jobs.
Prepare preliminary design as per concept approved by the client.
Design review and coordination with client and main contractor during the construction phase of the project.
Designing of Plumbing, Water supply and Sewerage system.
Responsible for HVAC Design and Calculations.
Geothermal HVAC system designing.
Responsible includes as Design of chiller, cooling tower, Air handler and heating loads; duct static calculations and equipment selections for air handlers, stair pressurization fans, exhaust fans, etc.; total head calculations and equipment selections for chilled water pumps, domestic water pumps, fire pumps, etc;,
Scheduling and specification revision for the above referenced equipment; initial "single line" conceptual sketches, design sketches, supervision and review of final contract drawings, with architectural, structural and civil drawings; supervised other engineers, designers and draftsmen on the project.
Responsible to design water supply system. (water consumption, water tank capacity, Booster pump, Transfer pump).
Responsible to design firefighting system. (Foam System, FM200, Deluge system)
Responsible to design LPG and NG System.
Designing of project as per green regulation, ASHRAE/SMACNA/ NFPA, and international plumbing code.
Obtain approval from relevant government department of the respective area.
Preparing mechanical services specification as per project requirement.
Preparing specification and BOQ of project.
Infrastructure Work.
Sewerage System
Doing Supervision and inspection of huge infrastructure sewerage work use double skin GRP manholes connection chambers, and use uPVC pipeline Dia 225mm and 160mm, as per ADSSC specification and approved standard drawing from ADSSC,
Storm Water
Doing Supervision and inspection of huge storm water network use double skin manholes, gully. Catch basin etc. Use uPVC pipe dia 500mm main line 300mm in branch line from catch basin and gully. Follow site work as per authority regulation and requirements Include submit drawings and material submittal to the authority for approval.
Portable water and Irrigation System
Doing Supervision and inspection of huge infrastructure potable water system supervision of site work laying HDPE pipe dia 150 mm and 100 mm include Fittings and Gate valve chamber, installation of gate valve and accessories and water tank and pump room include pump installation etc, Employment Profile
From November 2020 at Mace International, (Secondary Dubai Future Foundation) as MEP Project Manager October, 2016 to October 2020 at Studio International Engineering Consultants, Dubai as Senior Mechanical Engineer March 2016 to October 2016 THOE Real Estate Development LLC, Dubai as MEP Projects Manager March 2014 to February 2016 SPW Engineering Consultancy, Dubai as MEP Project Manager February 2012 to February 2014 Mace International (Secondary Musanada Abu Dhabi), as Service Manager March 2010 to January 2012 World Planners’ consultant engineers, Abu-Dhabi as Mechanical Engineer March 2008 to February 2010 Al Attar Electromechanical Engineering, Dubai as Mechanical Design Engineer May 2006 to February 2008 Bauer Electrical Middle East LLC, Dubai as Mechanical Project Engineer June 2003 to February 2006 Jai-Hind Maintenance& Contracting PVT LTD CO, Dubai as Mechanical Engineer Projects
Museum of the Future, Sheikh Zayed Road, Dubai, Design Architect- Killa Architectural Design, Lead Consultant- Burohappold Engineering, Main Contractor- Bam Higgs & Hill, Subcontractor- Trans Gulf
Maryam Beach Residence, G+P+6+Roof+Gym+Swimming Pool, 48 Shop, Restaurants, 690 Apartments, Maryam Island, Sharjah, Client- Eagle Hills Sharjah Development LLC, Consultant- Studio International Engineering Consultants, Main Contractor- GINCO Contracting CO. L.L.C
Al Mankhool Residential Development,(3B+G+7TY+Gym) Building on Plot No: 1003, Al Mankhool, Dubai, 70 Resident Units, Client- AL GHURAIR REAL ESTATE LLC, Consultant- Studio International Engineering Consultants, Main Contractor- Beaver Gulf
Al Hamriya Residential Development (G+3+Gym+Swimming pool), Building on Plot No:313-435, Al Hamriya, Dubai,108 Resident Units, Client- AL GHURAIR REAL ESTATE LLC, Consultant- Studio International Engineering Consultants, Main Contractor- REEM CAPITAL CONTRACTING LLC
Floating Seahorse Villa, 78 Numbers, Area-61M, Sweden Palace Luxurious Villa, 35 Numbers,B+G+2, Swimming Pool.
Khalifa University of Science Technology and Research with Data center, Lead Consultant-Elite Design & Engineering Consultancy LLC, MEP Consultant- SPW Engineering Consultancy, Main Contractor- General Contracting LLC, Contractor- Fibrex Construction Group
Bloom garden villa, 123 Number G+2 Villas, Client- Bloom properties, Consultant- World Planners’ consultant engineers, Main Contractor- Emirates Link Maltauro L.L.C,
Al Ghurair Center/Mall (Extension &Modification) Hotel and 34 F & B Outlet Fit out Shops, Client- Al Ghurair, Project Management- Mace International, MEP Consultant- SPW Engineering Consultancy, Main Contractor- Paramount Technical Works LLC
Project- 2B+G+13+Roof+U Roof, 2B+G+M+11+Roof+U Roof (Only Designing), Client- Mr. Mahdi Ali Hassan Redha, Consultant- BHNS Engineering Consultants
Project- 2B+G+6+ ROOF, Palace Hotel, Creek Harbor, Phase 1A, Dubai, Client – EMAAR (Only Design Review develop)
Project- MBR Villas, Dubai, Client – EMAAR Properties PJSC, Consultant- BHNS Engineering Consultants, Main Contractor- M/S BILT MIDDLE EAST L.L.C
Dubai Cricket Stadium, Client- Dubai Sports City, Consultant on Record- SKM (Sinclair Knight MERZ) MEP Consultant- Ian Banham & Associates, Main Contractor- Belbadi Contracting ALPINE MEP Contractor- Bauer Electrical Middle East LLC,
B+G+11+GYM, Four Star Hotel at Port Saeed, Dubai, Client: Royal International Hotel, Consultant: ALAJMI, Main Contractor- Binzyed Contracting LLC, MEP Contractor- Bauer Electrical Middle East LLC
2B+G+70+roof & G+12 Car Parking, Commercial Building at sheikh zayed road, Dubai, Client: Mr. Ahmad Abdulrahim Ahmad Al Attar, Consultant: al turath engineering consultants, Main Contractor- Golden Contracting LLC, MEP Contractor- Al Attar Electromechanical Engineering
4B+G+44+roof, Commercial Building at Al Barsha, Dubai, Client: Mr. Ahmad Abdulrahim Ahmad Al Attar, Consultant: National Engineering Bureau, Main Contractor- Golden Contracting LLC, MEP Contractor- Al Attar Electromechanical Engineering
Education
Bachelor of Technology/ Engineering (Mechanical Engineering) from Rajasthan Vidyapeeth University, India.
Diploma Mechanical Engineering from Aligarh Muslim University, India
Completed “Project management Professional” course in 2008 from Chicago Management Institute. I.T Skills
MS Office- 2007(MS Word & MS Excel)
Internet savvy
AutoCAD 04, 06, 07, 08, 17
HAP 4.8
Rivet
Sketch up
Personal Details
Date of Birth : 10th February, 1980
Gender : Male
Nationality : Indian
Languages Known : English, Hindi, Urdu
Marital Status : Married
Driving License : UAE
Passport No. : L1443231
Visa Status : Residence Visa-Company Sponsorship
Visa Valid Till : November, 2022
Present Address : 204, Al Zarooni Building, Al Qusais, Dubai References
Mr. Kashif Nesar
Technical Director
Mace International, Dubai
(050-*******, ******.*****@*********.***)
Certification
I, the undersigned, certify that to the best of my knowledge and belief, this Curriculum Vita correctly describes my qualifications, my experience and me.
Mohammad Khalil Akhtar