ORLY REPATO DUCHA
ADDRESS: Block-** Lot-* Phase-II, Casa Buena
De Pulilan, Brgy. Cutcot Pulilan Bulacan
Mobile No: +639*********
Email Add.: **************@*****.***
WORK EXPIRIENCES: Extensive experience in vertical and horizontal construction in the field of electrical design, construction and project management, testing and commissioning, site supervision/implementation of medium and High-rise buildings & mixed used, royal palaces, infrastructure, showrooms, hotels, hospitals, banks, commercial & office establishments, expressway, automated parking spaces etc.
Company: Arif and Bintoak Consulting Architects and Engineers Address: P.O. Box 3670 3rd Floor Arif and Bintoak bldg. Karama Dubai U.A.E. Date: November 26, 2006 – October 24, 2021
Position: Sr. Electrical Engineer
Projects: (Supervision)
Project Name: Jumeira Beach Residence Hotel (1B+G+3P+20F+R) Project Name: Marina Quay’s (3B+G+2P) Tower F - (G+41F+R) Tower G&H - (G+11+R) Project Name: Proposed Residential Development on Plot No. 124-531 (G +7+R) Project Name: Proposed Commercial & Office Building Plot No. 373-1343 (G +11+R) Project Name: AL Ghurair Expansion Project (Hotel, Office, Residential & Mall) Project Name: Car Showroom Offices & Work Shop Plot No.47 Sharjah Project Name: Standard Chartered Bank Plot No.3450835 @ Burj Khalifa (G +17+R) Project Name: Sea View Club Hotel @ Plot No. C-03 Palm Jumeirah. (1B+G+7F+R) Project Name: Commercial & Offices Building @ Plot No.3936055 (1B+G+3P+11+R) JLT Project Name: Radisson Blu Hotel Renovation @ Deira Creek Park Project Name: Residential development on plot no.3726229 at Al Safouh First, Dubai Villa-G + 1 Floor (32 Nos. Villas) + Health Club + Swimming Pool. Project Name: Residential development on plot no. 3734534 at Al Barsha first, Dubai Villa-G + 1 Floor (21 Nos. Villas) + Health Club + Swimming Pool. Project Name: Renault showroom and Nissan workshop Sharjah Project Name: Proposed 314 Townhouses within Town Square, Dubai
(Safi Townhouses C03)
Project Name: Proposed 764 Townhouses within Town Square, Dubai
(Noor Townhouses C05)
Project Name: 2B+G+2F+Roof Commercial & Residential Bldg. @ Jumeirah First, Dubai Project Name: RP Heights, 1B+G+5P+45F+Roof @ Business Bay 1, Dubai U.A.E. Plot No. 3450394
Project Name: B+G+4F+Roof Labor Accommodation Development 599-7499 @ Jebel Ali Industrial Area First, Dubai U.A.E.
Projects: (Design)
Project Name: Al Bateen Wharf (TDIC)
Project Name: Aster Hospital (2B+G+5+R)
Project Name: Dr. Solaiman Habib Medical Hospital (2B+G+7+R) Project Name: Renovation of Jumeira beach Palace
Project Name: Damac Amerat Tower 2 (Iraq) (G+5P+20+R) DUTIES AND RESPONSIBILITIES: (Design)
- Lighting and power load calculation.
- Provide schedule of load.
- Cable sizing.
- Provide single line diagram.
- Voltage drop calculation.
DUTIES AND RESPONSIBILITIES: (Supervision)
- Responsible for all electrical site works from site implementation, coordination, material evaluation, T&C, Health and Safety, Technical, commercial and project management.
- Review electrical shop drawings, material submittal as per electrical, authority regulation, project specification and vendor list.
- Review (variation order) VOR submitted by the contractor prior to client approval.
- Review and response (request for information) RFI submitted by the contractor.
- Review and approved method statement for installation, testing and commissioning of all electrical works.
- Facilitate submission of design/shop drawings prior to obtain authority NOC ie. DEWA, Etisalat, Du etc.
- Attending progress and coordination meeting.
- Monitor contractor accomplishments.
- Review and approved monthly electrical billing submitted by the contactor in accordance with site works completion.
- Attending safety meeting and monitor safety implementation on site.
- Issued engineer instruction as per revised drawing and engineering design.
- Check material sample on site as per approved manufacturer and supplier.
- Factory visit for the approved manufacturer and witness factory acceptance test for the switch gear, electrical panels and generators.
- Check and approved as-built drawing.
- Review and approved operation and maintenance manual, training manuals for all electrical system.
- Attend training conducted by the contractor/supplier prior to handing over of all electrical system
- Witness and approved all electrical system testing and commissioning prior to system hand over.
Company: Leighton Contractors Asia Ltd.
Address: Brgy. Tibag Pulilan, Bulacan Philippines
Project: Manila North Tollways Project
Date: April 03, 2004 – December 07, 2005
Position: Electrical Engineer
DUTIES AND RESPONSIBILITIES
Working with MEP department of the Manila North Tollway Project, involved in site operation, testing and commissioning of all electrical systems. Supervised and monitor site progress and responsible for the following scope of works;
- Supervised installation of all electrical works for the whole projects.
- Attending inspection together with the consultant for electrical installation approval.
- Responsible for material take off for site used.
- Supervised and monitor subcontractor activities and giving instruction.
- Provide site progress report and prepare all document subjected for hand over and final inspection.
- Supervised all testing and commissioning for all electrical works.
- Supervised the rectification of punch list/snag list and raise inspection request for the consultant approval.
- Coordinate with other discipline to avoid conflict of works. Company: Meralco Industrial Engineering Services Corporation (MIESCOR) Address: Renaissance Tower, Pasig City Philippines Date: Sept. 12,2003 – March 31, 2004
Position: Cadet Engineer/Leadman.
Working in the maintenance division of the Manila Electric Corporation (Meralco) Sta. Maria branch and responsible for the following scope of works,
- Responsible for secondary line maintenance/field man.
- Responsible for electromechanical/digital meter and current transformer calibration.
- Responsible for the inspection of service entrance for metering installation and approval for residential, commercial and industrial buildings. Company: First In Colors Inc.
Address: 65 Industria st. Bagumbayan, Quezon City Philippines Date: Dec. 21, 2002 – May 14, 2003
Position: Maintenance Staff/Leadman
Working in Engineering and maintenance division of the First in Colors Inc. and responsible for the following scope of works;
- Responsible for preventive maintenance for all electrical equipment and machineries.
- Responsible for the calibration of all electrical equipment’s/machines. TRAINING & SEMINAR ATTENDED:
Pneumatic Fund transfer System
Leighton Contractors Asia Ltd.
October 2004
Environmental and Occupational Safety &Health Awareness Seminar Conducted by MACE international
Arif & Bintoak Consulting Architect and Engineers
July 2007
EDUCATIONAL BACKGROUND:
Certificate Project management
Chicago Management Training Institute
Dubai, United Arab Emirates
(30th May 2008 – 1st August 2008)
College Aurora State College of Technology
Zabali Campus Baler, Aurora
(1996-2002)
Degree Bachelor of Science in Electrical Engineering June 07, 2002
Diploma in Electrical Technology
June 02, 2000
High School Calabuanan National High School
Brgy. Calabuanan Baler, Aurora
(1993-1996)
Elementary Calabuanan Elementary School
Brgy. Calabuanan Baler, Aurora
(1988-1993)
PERSONAL DATA:
Gender : Male Passport No. : XX4989848
Nationality : Filipino PRC. No : 0027842
Date of Birth : 04 December 1979 SSS. No. : 33-8215521-4 Place of Birth : Maria Aurora, Aurora Religion : Iglesia Ni Cristo Civil Status : Married
CHARACTER REFERENCES:
Toni Torehi Ulrich Dienstbach
Project Manager Building Manager
Arif & Bintoak Consulting Architect and Engineers Leighton Contractors Asia Ltd. Cel No. 050******* Cel. No. +639*********
Marwan Mohammed
MEP Manager
Arif & Bintoak Consulting Architect and Engineers
Cel. No. +971*********
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
Orly R. Ducha