June 2005: Civil Engineer
Establishment: University August 20, 1955 in Algeria Address: Road Al Hadaiek BP 26 Skikda 21000 Algeria. Site Web: www.univ-skikda.dz
June 2000: Baccalaureate for secondary school. Option: Mechanic Fabrication. Autocad 2007 (Design)
Office: Word, Excel, PowerPoint
Fireproofing Certificates
SKILLS AND QUALIFICATIONS :
STUDY DIPLOMA :
University degree as Engineer of Civil Engineering with over than 12 successful years of solid and competent experience. Wide range of exposure to various types of oil & gas & heavy construction projects. Wide knowledge of using and interpreting engineering drawings / designs, specifications, & applicable project codes & international standards.
PROFESSIONAL POSITIONS:
1st Choice: QA/QC Civil Inspector
2sd Choice: Civil Engineer
Curriculum Vitae
Training Complémentaires :
Hafsi Karim ********@*****.** 002**-***-***-***
Juin 2016 to date : QA/QC Civil Inspector The Project is operated by a joint venture composed of (TOTAL .SONATRACH . CEPSA) Joint Venture, whose goal is the development of the Timimoun Gas Field, in the Deep South of Algeria.
SAMSUNG ENGINEERING is acting in the capacity of EPCCS Contractor for the Project, the Engineering Office being based in Seoul, South Korea.
Investment: USD 1-billion
Position: Civil Inspector
Activities:
- Earth Works
- Concrete Work
- Architectural & Buildings Works
- Underground
- Foundations for Equipment’s: Fuel Gas, MP Comprssor, GTC,GTG, Steel Structure )
- Tanks
- Retentions basins
- Road works, Paving
- Structure : Fractionation, Pipe racks & Tanks
- Water Proofing
- Fire Proofing
- Wellhead, Flowline, manifold
- modification of CPF
- Punch List Entry / Clearance
Specific responsibilities:
• Checks and reviews the plans and specifications for the proper construction and quality implementation at job site.
• Interprets design plans and specifications to verify the work performed in accordance with the contract documents.
• Produces activity reports as necessary to ensure that all QC activities have been fulfilled.
• Inspects and monitors piling installation to ensure location and bearing. Professional Careers :
Hafsi Karim ********@*****.** 002**-***-***-***
• Participates in the development of quality control reports and procedures as requested by the QA/QC Manager.
• Performs other responsibilities associated with this position as may be appropriate
• Provide technical advice / problem resolution on request during the construction and commissioning Phases and ensure that as-built drawings are received
• Inspects construction, including temporary, works to ensure compliance with approved methods and contract requirements.
• Maintains records of inspections, work executed, etc.
• Directs Inspectors and ensure performance.
• Observes site safety procedures.
• Assists in preparation of "as-built" drawings.
• Assists with inspection of completed works, prepare sang lists and handover to operating authority.
• Interprets inspection test plan (ITP) and Project procedure, DEP procedure.
• Prepare, check and verify outstanding work lists / punch lists items prior to project turn over and acceptance.
• Coordinate with client’s representative regarding Quality Control daily and final inspection. September 2013 to Juin 2016 QA/QC Civil Engineer at the foreign company System Insaat Construction Wearing achieving a Tourist village called Skikda Rusika Park.
•Supervise construction quality control functions/activities related to civil disciplines, including inspection of the quality control and quality records collection calendars. Ensures the availability of documents in the file quality.
• Reports of inspections and documents issued by inspectors and collect and file the necessary documents for quality.
Hafsi Karim ********@*****.** 002**-***-***-***
•Manages collaboration of measurement instruments and controls certifications.-completeness and compliance with requirements, standards and / or guidelines.
•Ensures that the tests, examinations and inspections are carried out and that employees have access to all documents necessary project.
•Ensure, where necessary, updating of site quality assurance/control procedures plans.
•Ensure the quality of work according to the plans, specifications and standardsTechnical Project
(CCTP) - Realizationspotsandplanqualitycontroltestinghasvalidatedaccording to the technical and regulatory requirements specified in the contract.
•Implementation of various state coordination body with various enforcement services and control.- Check sand controls work (Implantation, Earthmoving, Level, formwork and reinforcement, concreting Authorization) according to plan.
•Coordination with state agencies SIAHA SPA and laboratories LTP to control and test the quality materials used (Reception bottom of the excavation, concrete, materials identification, tests for compactness) the standards and procedures required by the project (CCTP, DTR ). July 2013 to September 2013 Civil Engineer in an office Italian international study Fabris & Partners, Bearing Control and monitoring of the construction works of the Chinese company CSCEC at Annaba Project05 star Sheraton Hotel.
-Conduct studies conform to the specifications and comply with the regulations and rules of the
-Provide technical monitoring (compliance) on the project site.
-Investigate the design and implementation of the project and calculate the stresses of the work
(structure, strength, design, foundation supports...)
-Monitor and control the work conforms to the reception
- Supervision of works on site
-Arranging and conducting site meetings with various stakeholders in the project
- Establish work schedules.
February 2009 to January 2013 who have worked with the group ANAS(Italian international study office), acting under Contract No.05/2008, concluded with the National Highways Agency(ANA), with control and supervision of works achievements of the company Cojaal lot EAST - WEST, between the city and border of BBA - Algerian Tunisian of 399 Km, As on Civil Engineering Controller
(Control Quantitative and Qualitative) Works of Bridge: Responsible for control and monitoring of the following works:
Overpasses(piles. Soles.Piles.Trimmers. Beams. Slabs)
Underpasses
05 bridges (viaducts). Lengths(l1 = 156m; l2 =156, l3=504m; l4 =82;l5= 111)
Scuppers
Establishing attachments
02 Pile Walls (reinforcement land slides), (861 piles) Hafsi Karim ********@*****.** 002**-***-***-***
Review quality control plans subcontractors
Prepare monthly reports of quality control
Raise and close the gaps
July 2008 – February 2009: COJAAL (Japanese Consortium for the Algerian High way) for East-West Highway Project of Algeria,camp 05 sections: Road. Position: Quality Civil Engineer
- A follow up of the various earthworks and embankment:
- Selection of materials for embankment and the sub grade:
- Responsible for performing scheduled site walk downs
- to monitor compliance with method statements and risk Assessments according to contractual conditions
- According to GTR (Embankment & capping layers construction)
- board of test for the material
- board of Reference
- Selection of materials storage areas.
- Realization of disbursements, purges and stepped in soil `s seat
- The achievement of masks and spurs draining
- Realization of the slope
- Preparation of the surface of the upper plane of the moving
- Compaction of different layers
- Implementation of hydraulic works Files Preparation (suggestion) submitted for approval.
Arabic: Excellent (Read, write and speak)
French: Excellent (Read, write and speak)
English: Excellent (Read, write and speak)
Spanish: Average
Ease of adaptation and integration in to working groups Easy to learn
Spiritof initiative and responsibility
Available for work on the move
languages :
Various Recreations publications :
Hafsi Karim ********@*****.** 002**-***-***-***