Comprehensive Résumé
SALVADOR SAYSON JR. y LAWAS
Sr.CAD Designer / BIM Modeller
(Revit Architecture / Revit Structure / Revit MEPF) Address : Block 5 Lot 5 Phase 2B Villa Celina Subdivision Pakigne, Minglanilla, Cebu Philippines
Mobile No.(Phils.) : +63-928-***-****
Mobile No.(Qatar.) : +974-****-****
Email Address : *********@*****.***
******************@*****.***
Skype : Heiramken
W O R K I N G E X P E R I E N C E :
February 06, 2021 - March 21,2022 Fit-out / Joinery : MEP / Architectural MEP Draftsman / Coordinator
STEADFAST Trading & Contracting
Sub-contracted to URBACON Trading & Contracting (UCC) Doha, State of Qatar
Project:
Qatar Energy District – Tower 10 Fit-out
Duties and Responsibilities :
• Coordinating to Sub-Contractors Drawing Submission
• Review Shop Drawings, Red Line and As-Built Drawings
• Preparing Medical Equipment Shop Drawings
• Documentations
November 22, 2020 – February 03, 2021 Building Construction : Civil and Architectural Architectural BIM Modeller
Al Madar Contracting
Doha, State of Qatar
Project:
Al- Sadd Medical Center
Duties and Responsibilities :
• 3D Modelling
• Creating Families
• MEP Coordination using Navisworks
• Schedule of Quantities
• Updating Floor, Base, Wall & Ceiling Finishes
• Documentations
November 03, 2018 - November 22, 2020 Building Construction : Civil and Architectural Architectural BIM Modeller
Bojamhoor Trading and Contracting (BTCC)
Doha, State of Qatar
Project:
• Internal Security Force (ISF)
Lekhwiya Military Camp
Duhail, State of Qatar
Duties and Responsibilities :
• Responsible in preparing Architectural
Design and Shop Drawings
(Includes M.E.P.F. Coordination)
• As-Built Drawings (Architectural)
October 29, 2016 - October 31, 2018 Railway Project : Signalling and Telecommunication BIM Modeller
THALES Qatar
Doha, State of Qatar
Projects:
01. Doha Metro
(Red Line, Green Line, Gold Line & Blue Line)
Duties and Responsibilities :
• BIM Modelling of PAS, PIS, PES, LAN, PWR, CTV,
PAX,
ECS, TDC, ACS, IAS, ORS, VDR, CBS, ITE and SCD.
• Cable Tray modeling for the Tunnels,
• Modelling for DEPOT Stabling Yard
• Shop Drawings for the Client
(Modelling, Clash, Detection, MEP Coordination
and Sheetings. Includes Schedule of Quantities for . Signalling & Telecommunications.
• Railway Stations and Tunnels CTV Design Drawings for the Ministry of Interior (MOI)
•Shop Drawings for Civil Defense (QCD)
(Modelling, Taggings and Sheetings)
For Railway Stations.
• As-built Drawings
December 11, 2015 - October 12, 2016 Architectural Designing and Project Management Architectural Designer / Interior Designer / BIM Modeller MKAN for Architecture
Riyadh K.S.A.
Projects :
• Travertino Tower (4B+G+M+14+R)
• Commercial Bldgs.
• Residential Villas
• Resorts
Duties and Responsibilities :
• Design and Analysis
• Complete Design Drawings (For Client)
• Complete Design Drawings (For Municipality)
• Interior Design Drawing + Renderings
August 27, 2014 – December 10, 2015 Airport Design & Construction CAD Designer / BIM Modeller (Architecture / Structure / MEPF) Megawide – GISPL Construction Joint Venture (MGCJV) Airport Project
Mactan, Lapu-Lapu City
Engineering & Construction
Projects :
• Mactan-Cebu International Airport Terminal-1
(Modification And Improvement Works)
• New Mactan-Cebu International Airport Terminal-2 Duties and Responsibilities :
• Preparing Civil, Architectural & MEPF
(includes IT Networking) Shop Drawings
for the existing Terminal-1
• Civil, Architectural, MEPF Shop Drawings
for Office of the Building Official (OBO) Building Permit
• BIM Modelling for T2 Coordinated I.T. Services.
• As-Built Drawings for the Existing Terminal-1
• Preparing Site Development Plans
& Topographical Sketch for the whole
Airport vicinity Map.
• Providing latest drawings and other information
for Operation and Airport Management (GMCAC)
• Coordinating Local Sub-Contractors for the Terminal- 1
November 22, 2012 – December 26, 2013 Electro – Mechanical (M.E.P.) Auto-CADD Draftsman
Unistar Contracting Company Limited
P.O Box 28324 Riyadh 11437, K.S.A.
Design Office
M.E.P. Projects :
01. King Abdullah Financial District (KAFD)
Parcel 2.07, 2.08, 2.11, 2.12, 2.13
02. Hilton Residential Towers
03. Sultan Palace
04. Mashhour Palace
Duties and Responsibilities:
• Preparing Shop Drawings :
(Mechanical)
• Water Supply
• Drainage
• Firefighting
(Electrical)
• FM-200 Fire Alarm & Detection System
• Central Battery System (CBS)
• Building Management System (BMS)
• Material Take-off ( M.E.P.)
• M.E.P. Builders work
• Electro-Mechanical Coordination Drawing
• Areas Calculation As Per Contract (M.E.P.)
April 12, 2011 to May 08, 2012 VERTICAL CONSTRUCTION Auto-CADD Draftsman (Civil / Architectural)
Commodore Qatar Contracting Co. LLC.
P.O Box 24250 Doha, State Of Qatar
Technical Department - Main Office
Tel No. 465-42-42 Ext. 251/ Fax No. 465-43-43
High Rise Building Projects:
• 2B+G+32 Storey Yohan Office Tower
• 3B+G+40 Al-Jassimya Tower
• Al-Thani Residential Palace
Duties and Responsibilities:
CADD Works – Architectural
Architectural
- Stair Detailing
- Coordinated Reflected Ceiling Layout
- Ceramic Tiling Layout
- As-Built Drawing
- Interior Design
- Landscaping
- General Arrangement (Concrete Setting out)
- Blockworks Layout
- Material Take-off
September 04, 2008 January 31, 2011 Mechanical, Electrical, Plumbing and Fire Protection CADD Draftsman (M.E.P.F.)
Arabian Construction Company (ACC)
c/o: M.E.P. Division, Etihad Tower
Khalidiyah, In front of Emirates Palace
Abu Dhabi, U.A.E.
High Rise Building Projects:
• 4B+G+6P+ 60 Storey Etihad Tower – 4
• 4B+G+6P+ 55 Storey Etihad Tower – 5
Duties and Responsibilities:
• Fire Fighting System Shop Drawings for submittal to the Consultants and Site Implementation.
• Coordination to Fire Fighting Specialist
and Architectural Head
• Drainage System Shop Drawings for submittal
to the Consultants and Site Implementation.
• Water Supply shop drawings for submittal
to the Consultants and Site Implementation
• As-Built Drawings (for 2 Towers)
• HVAC Shop Drawings
• M.E.P. Coordination Drawings
• Material Take-off (Electro-Mechanical)
April 27, 2005 – May 11, 2008 VERTICAL CONSTRUCTION Auto-CAD Draftsman (Civil / Architectural)
Commodore Qatar Contracting Co. LLC.
Technical Department - Main Office
P.O Box 24250 Doha, State Of Qatar
Tel No. 465-42-42 Ext. 251/ Fax No. 465-43-43
High Rise Building Projects:
• 2B+G+ 7 Storey Office Building
• 2B+G+26 Storey Dolphin Enengy Tower
• 3B+G+28 Storey M(Residential) Tower
• H.H. SHK. Mohammed Bin Suhaim Al-Thani
Residence
• 32-Storey Al-Zaabi Residential Tower
• Hilton Hotel Landscaping
• 2B+G+30-Storey UMM-BAB Tower
• Industrial Warehouse
• 2B+G+32 Storey Yohan Office Tower
• 3B+G+16 Storey Dr. Ali Fetais Office Bldg.
• 1B+G+2 Storey Pearl Palace
Duties and Responsibilities:
CADD Works – Architectural, Structural & Mechanical 1. Architectural
• Mobilization
• Coordination
• Sketches
• Blockworks
• Stair Detail
• Ceiling Detail
• Marble & Ceramic Tilings
• Sub-Station Layout and Detalis
• Schedule Of Doors
• Excavation Layout and Details
• Material Take-off
• As-Built Drawings
• Perspective Rendering
• All Shop Drawings for Submittal pertaining
to Architectural
2. Structural
• General Arrangement
• Reinforcement Detail
• Material Take-off
• All Shop Drawings for submittal pertaining to Structural 3. Mechanical
• HVAC Layout and Details
• Mechanical Drawings
4. Electrical
• Shop Drawings
January 18, 2003 – January 19, 2005 HORIZONTAL CONSTRUCTI0N Auto-CADD Draftsman
JUBAR International Contracting Co.
P.O Box 18624 Riyadh 11425
Kingdom of Saudi Arabia (K.S.A.)
Projects :
• Riyadh Sewerage Network System
• Effluent Drain Channel
from S.T.P. K-29 to Wadhi- Hanifa.
Al-Kharj, Riyadh K.S.A.
Duties and Responsibilities:
• Preparing Survey Data Sheets
• 40 kms. Effluent Drain Channel Layout and other details
• Detailings and Bar Bending Schedule.
• Ground Profiles and Line Design for the 40kms
Effluent Drain Channel.
• Excavation Quantity for Billing.
• Weekly Progress Reports.
• Extensive Detailing of Sewerage Network System
(Riyadh K.S.A.)
• Shop Drawings
• Documentations
February 28, 2001 -December 31,2002 CIVIL / ARCHITECTURAL Draftsman / Auto-CADD Operator
Gaisano South Group of Companies
Corporate Engineering Office (CEO)
Colon, Cor. Leon.Kilat St., Cebu City, Phils.
Duties and Responsibilities:
• Architectural Drawings
a. Perspective Rendering
b. Designing Mall interiors,
• Mechanical, Electrical, Plumbing & Sanitary
• Processing for the Building Permit
• Detailing and other Shop Drawings.
• Lot Technical Descriptions (Client)
August 23, 2000 – January 31, 2001 MECHANICAL
Draftsman / Auto-CADD Operator
Bayer Phils. Inc.
Canlubang Industrial Estate Canlubang,
Calamba, Laguna
Duties and Responsibilities:
• Architectural Drawings
• Mechanical Drawings
• Clerical works, faxing & computer encoding (MS Office).
• Weekly Reports
July 8, 1998 – April 2, 2000 MECHANICAL
Mechanical Draftsman
DAC-AIRE Enterprises
Airconditioning and Ventilating System
Suite No.4 Ceniza Commercial Plaza
Hi-way Mandaue City
Project: 23 Storey GOLDEN PEAK Tower
Gorordo Ave. Cor. Escario Ext. Cebu City
Duties and Responsibilities:
• Preparing accomplishment reports,
• Mechanical Shop Drawings
(Chillers and Cooling Tower)
• Manpower supervision
• Preparing employee’s Daily Time Record
• Other Drafting jobs.
October 17, 1997 – June 8, 1998 MECHANICAL
Mechanical Draftsman
DAC-AIRE Enterprises
Airconditioning and Ventilating System
Suite No.4 Ceniza Commercial Plaza
Hi-way Mandaue City
Project: 23 Storey GOLDEN PEAK Tower
Gorordo Ave. Cor. Escario Ext. Cebu City
Duties and Responsibilities:
• Preparing accomplishment reports
• Mechanical Shop Drawings,
• Manpower supervision
• Preparing employee’s Daily Time Record
• Material Take-off
February 13, 1997 – August 16, 1997 MECHANICAL
Company Draftsman
COSMOS Bottling Corporation (CBC)
Canlubang Industrial Estate, Canlubang
Calamba, Laguna
Duties and Responsibilities:
• As-Built Drawing (Bottling Plant Layout & Piping).
• Mechanical Drafting with Vernier Caliper & Scaling. September 13, 1996 – February 13, 1997 MECHANICAL
Company Draftsman
RMI Personnel Resources and Services Inc.
Company Assignment: COSMOS Bottling Corporation (CBC) Canlubang Industrial Estate Canlubang, Calamba Laguna Duties and Responsibilities:
• As-built Drawings (Bottling Plant Layout and Piping)
• Mechanical Drafting with the aid of Vernier Caliper and scaling.
G E N E R A L Q U A L I F I C A T I O N :
ARCHITECTURAL
• autoCAD 2018 / autodesk Revit Architecture 2015
(Basic 2D & 3D Modelling)
• Architectural Designing
• Detailing
• As-Built Drawings
• Interior Designing
• Building Miniature
• Mobilization (Temporary Equipment Facilities)
• Material Take-off / Bill of Quantities (BOQ)
• Perspective Rendering
STRUCTURAL
• autoCAD 2015 / autodesk Revit Structure 2015
• Foundation Plan
• Roof Framing Plan
• Beam and Column Detail
• General Arrangement / Concreting Setting-out
• Blockworks
• Material Take-off / Bill of Quantities (BOQ)
ELECTRICAL
• Lighting Layout
• Cenral Battery System (CBS)
• Building Management System (BMS)
• FM-200 Fire Alarm and Detection System
• Material Take-off
ELECTRO-MECHANICAL
• autoCAD 2015 / autodesk Revit MEPF 2015
• Drainage
• Fire Fighting
• Water Supply
• HVAC
• Coordination Drawing
• Material Take-off
• M.E.P. Builders Work
COMPUTER SOFTWARE
• AutoCAD 2018 (Basic 2D & 3D Modelling)
• MS Office
• Word
• Excel
• Untitled Paint
• Powerpoint
• 3D MAX 5.1
• Adobe Photoshop Latest Version
• Sketch-Up Pro 2015
• Autodesk Revit Architecture 2015
• Autodesk Revit Structure 2015
• Autodesk Revit MEPF 2015
• Navisworks Professional
E D U C A T I O N A L A T T A I N M E N T :
COLLEGE Diploma Holder
1993 – 1998 Bachelor of Science in Industrial Technology (BSIT) - 4 Year Major in: Drafting Technology
Cebu Technological University (CTU)
Formerly Cebu State College of Science and Technology (CSCST) Main Campus – M.J Cuenco Ave., Cor. R. Palma St.,
Cebu City
COLLEGE Third Year Standing
1990 – 1993 Bachelor of Science in Information and Computer Science University of Cebu (UC)
Sanciangko St., Cebu City
S E M I N A R S A N D T R A I N I N G S A T T E N D E D : February 18, 2015 – February 24, 2015 Autodesk Revit Architecture 2015 Microcadd Training Center
Persimmon, Mabolo, Cebu City
Certificate No.: 15BDQWXILO
February 25, 2015 – February 28, 2015 Autodesk Revit MEPF 2015 Microcadd Training Center
Persimmon, Mabolo, Cebu City
Certificate No.: 1AF5023214
March 24, 2015 – March 26, 2015 Autodesk Revit Structure 2015 Microcadd Training Center
Persimmon, Mabolo, Cebu City
Certificate No.: 1NLMRNLM87
October 23, 2013 – October 24, 2013 ETA - KSA
Building Management System (BMS)
Training Programme
UNISTAR - Head Office
Riyadh K.S.A.
May13, 2000 – June 11, 2000 Auto-CADD LT 2000 Module 2 (Advance Training) RAMM Design System Inc.
Balibago, Sta. Rosa, Laguna
April 14 – May 12, 2000 Auto-CADD LT 2000 (BASIC)
RAMM Design System Inc.
Balibago, Sta. Rosa, Laguna
R E F E R E N C E S :
1. Engr. Michel Sabbagh Design Manager
THALES Group
Doha, State Of Qatar
Mobile No. +974-****-****
2. Martin S. Giordan Project Director
Megawide – GISPL Construction Joint Venture (MGCJV) Mactan-Cebu International Airport Project
3. Eng’r. Awni Zeid Project Manager / Senior Architect Commodore Qatar Contracting Company
P.O Box 24250 Doha, Qatar
Mobile No. +974-****-****
This is to certify that everything stated above is deemed true and correct to the best of my knowledge. SALVADOR SAYSON JR. y LAWAS