Post Job Free
Sign in

Draftsman Calamba

Location:
Al Dafna, Qatar
Posted:
March 27, 2022

Contact this candidate

Resume:

Comprehensive Résumé

SALVADOR SAYSON JR. y LAWAS

Sr.CAD Designer / BIM Modeller

(Revit Architecture / Revit Structure / Revit MEPF) Address : Block 5 Lot 5 Phase 2B Villa Celina Subdivision Pakigne, Minglanilla, Cebu Philippines

Mobile No.(Phils.) : +63-928-***-****

Mobile No.(Qatar.) : +974-****-****

Email Address : *********@*****.***

******************@*****.***

Skype : Heiramken

W O R K I N G E X P E R I E N C E :

February 06, 2021 - March 21,2022 Fit-out / Joinery : MEP / Architectural MEP Draftsman / Coordinator

STEADFAST Trading & Contracting

Sub-contracted to URBACON Trading & Contracting (UCC) Doha, State of Qatar

Project:

Qatar Energy District – Tower 10 Fit-out

Duties and Responsibilities :

• Coordinating to Sub-Contractors Drawing Submission

• Review Shop Drawings, Red Line and As-Built Drawings

• Preparing Medical Equipment Shop Drawings

• Documentations

November 22, 2020 – February 03, 2021 Building Construction : Civil and Architectural Architectural BIM Modeller

Al Madar Contracting

Doha, State of Qatar

Project:

Al- Sadd Medical Center

Duties and Responsibilities :

• 3D Modelling

• Creating Families

• MEP Coordination using Navisworks

• Schedule of Quantities

• Updating Floor, Base, Wall & Ceiling Finishes

• Documentations

November 03, 2018 - November 22, 2020 Building Construction : Civil and Architectural Architectural BIM Modeller

Bojamhoor Trading and Contracting (BTCC)

Doha, State of Qatar

Project:

• Internal Security Force (ISF)

Lekhwiya Military Camp

Duhail, State of Qatar

Duties and Responsibilities :

• Responsible in preparing Architectural

Design and Shop Drawings

(Includes M.E.P.F. Coordination)

• As-Built Drawings (Architectural)

October 29, 2016 - October 31, 2018 Railway Project : Signalling and Telecommunication BIM Modeller

THALES Qatar

Doha, State of Qatar

Projects:

01. Doha Metro

(Red Line, Green Line, Gold Line & Blue Line)

Duties and Responsibilities :

• BIM Modelling of PAS, PIS, PES, LAN, PWR, CTV,

PAX,

ECS, TDC, ACS, IAS, ORS, VDR, CBS, ITE and SCD.

• Cable Tray modeling for the Tunnels,

• Modelling for DEPOT Stabling Yard

• Shop Drawings for the Client

(Modelling, Clash, Detection, MEP Coordination

and Sheetings. Includes Schedule of Quantities for . Signalling & Telecommunications.

• Railway Stations and Tunnels CTV Design Drawings for the Ministry of Interior (MOI)

•Shop Drawings for Civil Defense (QCD)

(Modelling, Taggings and Sheetings)

For Railway Stations.

• As-built Drawings

December 11, 2015 - October 12, 2016 Architectural Designing and Project Management Architectural Designer / Interior Designer / BIM Modeller MKAN for Architecture

Riyadh K.S.A.

Projects :

• Travertino Tower (4B+G+M+14+R)

• Commercial Bldgs.

• Residential Villas

• Resorts

Duties and Responsibilities :

• Design and Analysis

• Complete Design Drawings (For Client)

• Complete Design Drawings (For Municipality)

• Interior Design Drawing + Renderings

August 27, 2014 – December 10, 2015 Airport Design & Construction CAD Designer / BIM Modeller (Architecture / Structure / MEPF) Megawide – GISPL Construction Joint Venture (MGCJV) Airport Project

Mactan, Lapu-Lapu City

Engineering & Construction

Projects :

• Mactan-Cebu International Airport Terminal-1

(Modification And Improvement Works)

• New Mactan-Cebu International Airport Terminal-2 Duties and Responsibilities :

• Preparing Civil, Architectural & MEPF

(includes IT Networking) Shop Drawings

for the existing Terminal-1

• Civil, Architectural, MEPF Shop Drawings

for Office of the Building Official (OBO) Building Permit

• BIM Modelling for T2 Coordinated I.T. Services.

• As-Built Drawings for the Existing Terminal-1

• Preparing Site Development Plans

& Topographical Sketch for the whole

Airport vicinity Map.

• Providing latest drawings and other information

for Operation and Airport Management (GMCAC)

• Coordinating Local Sub-Contractors for the Terminal- 1

November 22, 2012 – December 26, 2013 Electro – Mechanical (M.E.P.) Auto-CADD Draftsman

Unistar Contracting Company Limited

P.O Box 28324 Riyadh 11437, K.S.A.

Design Office

M.E.P. Projects :

01. King Abdullah Financial District (KAFD)

Parcel 2.07, 2.08, 2.11, 2.12, 2.13

02. Hilton Residential Towers

03. Sultan Palace

04. Mashhour Palace

Duties and Responsibilities:

• Preparing Shop Drawings :

(Mechanical)

• Water Supply

• Drainage

• Firefighting

(Electrical)

• FM-200 Fire Alarm & Detection System

• Central Battery System (CBS)

• Building Management System (BMS)

• Material Take-off ( M.E.P.)

• M.E.P. Builders work

• Electro-Mechanical Coordination Drawing

• Areas Calculation As Per Contract (M.E.P.)

April 12, 2011 to May 08, 2012 VERTICAL CONSTRUCTION Auto-CADD Draftsman (Civil / Architectural)

Commodore Qatar Contracting Co. LLC.

P.O Box 24250 Doha, State Of Qatar

Technical Department - Main Office

Tel No. 465-42-42 Ext. 251/ Fax No. 465-43-43

High Rise Building Projects:

• 2B+G+32 Storey Yohan Office Tower

• 3B+G+40 Al-Jassimya Tower

• Al-Thani Residential Palace

Duties and Responsibilities:

CADD Works – Architectural

Architectural

- Stair Detailing

- Coordinated Reflected Ceiling Layout

- Ceramic Tiling Layout

- As-Built Drawing

- Interior Design

- Landscaping

- General Arrangement (Concrete Setting out)

- Blockworks Layout

- Material Take-off

September 04, 2008 January 31, 2011 Mechanical, Electrical, Plumbing and Fire Protection CADD Draftsman (M.E.P.F.)

Arabian Construction Company (ACC)

c/o: M.E.P. Division, Etihad Tower

Khalidiyah, In front of Emirates Palace

Abu Dhabi, U.A.E.

High Rise Building Projects:

• 4B+G+6P+ 60 Storey Etihad Tower – 4

• 4B+G+6P+ 55 Storey Etihad Tower – 5

Duties and Responsibilities:

• Fire Fighting System Shop Drawings for submittal to the Consultants and Site Implementation.

• Coordination to Fire Fighting Specialist

and Architectural Head

• Drainage System Shop Drawings for submittal

to the Consultants and Site Implementation.

• Water Supply shop drawings for submittal

to the Consultants and Site Implementation

• As-Built Drawings (for 2 Towers)

• HVAC Shop Drawings

• M.E.P. Coordination Drawings

• Material Take-off (Electro-Mechanical)

April 27, 2005 – May 11, 2008 VERTICAL CONSTRUCTION Auto-CAD Draftsman (Civil / Architectural)

Commodore Qatar Contracting Co. LLC.

Technical Department - Main Office

P.O Box 24250 Doha, State Of Qatar

Tel No. 465-42-42 Ext. 251/ Fax No. 465-43-43

High Rise Building Projects:

• 2B+G+ 7 Storey Office Building

• 2B+G+26 Storey Dolphin Enengy Tower

• 3B+G+28 Storey M(Residential) Tower

• H.H. SHK. Mohammed Bin Suhaim Al-Thani

Residence

• 32-Storey Al-Zaabi Residential Tower

• Hilton Hotel Landscaping

• 2B+G+30-Storey UMM-BAB Tower

• Industrial Warehouse

• 2B+G+32 Storey Yohan Office Tower

• 3B+G+16 Storey Dr. Ali Fetais Office Bldg.

• 1B+G+2 Storey Pearl Palace

Duties and Responsibilities:

CADD Works – Architectural, Structural & Mechanical 1. Architectural

• Mobilization

• Coordination

• Sketches

• Blockworks

• Stair Detail

• Ceiling Detail

• Marble & Ceramic Tilings

• Sub-Station Layout and Detalis

• Schedule Of Doors

• Excavation Layout and Details

• Material Take-off

• As-Built Drawings

• Perspective Rendering

• All Shop Drawings for Submittal pertaining

to Architectural

2. Structural

• General Arrangement

• Reinforcement Detail

• Material Take-off

• All Shop Drawings for submittal pertaining to Structural 3. Mechanical

• HVAC Layout and Details

• Mechanical Drawings

4. Electrical

• Shop Drawings

January 18, 2003 – January 19, 2005 HORIZONTAL CONSTRUCTI0N Auto-CADD Draftsman

JUBAR International Contracting Co.

P.O Box 18624 Riyadh 11425

Kingdom of Saudi Arabia (K.S.A.)

Projects :

• Riyadh Sewerage Network System

• Effluent Drain Channel

from S.T.P. K-29 to Wadhi- Hanifa.

Al-Kharj, Riyadh K.S.A.

Duties and Responsibilities:

• Preparing Survey Data Sheets

• 40 kms. Effluent Drain Channel Layout and other details

• Detailings and Bar Bending Schedule.

• Ground Profiles and Line Design for the 40kms

Effluent Drain Channel.

• Excavation Quantity for Billing.

• Weekly Progress Reports.

• Extensive Detailing of Sewerage Network System

(Riyadh K.S.A.)

• Shop Drawings

• Documentations

February 28, 2001 -December 31,2002 CIVIL / ARCHITECTURAL Draftsman / Auto-CADD Operator

Gaisano South Group of Companies

Corporate Engineering Office (CEO)

Colon, Cor. Leon.Kilat St., Cebu City, Phils.

Duties and Responsibilities:

• Architectural Drawings

a. Perspective Rendering

b. Designing Mall interiors,

• Mechanical, Electrical, Plumbing & Sanitary

• Processing for the Building Permit

• Detailing and other Shop Drawings.

• Lot Technical Descriptions (Client)

August 23, 2000 – January 31, 2001 MECHANICAL

Draftsman / Auto-CADD Operator

Bayer Phils. Inc.

Canlubang Industrial Estate Canlubang,

Calamba, Laguna

Duties and Responsibilities:

• Architectural Drawings

• Mechanical Drawings

• Clerical works, faxing & computer encoding (MS Office).

• Weekly Reports

July 8, 1998 – April 2, 2000 MECHANICAL

Mechanical Draftsman

DAC-AIRE Enterprises

Airconditioning and Ventilating System

Suite No.4 Ceniza Commercial Plaza

Hi-way Mandaue City

Project: 23 Storey GOLDEN PEAK Tower

Gorordo Ave. Cor. Escario Ext. Cebu City

Duties and Responsibilities:

• Preparing accomplishment reports,

• Mechanical Shop Drawings

(Chillers and Cooling Tower)

• Manpower supervision

• Preparing employee’s Daily Time Record

• Other Drafting jobs.

October 17, 1997 – June 8, 1998 MECHANICAL

Mechanical Draftsman

DAC-AIRE Enterprises

Airconditioning and Ventilating System

Suite No.4 Ceniza Commercial Plaza

Hi-way Mandaue City

Project: 23 Storey GOLDEN PEAK Tower

Gorordo Ave. Cor. Escario Ext. Cebu City

Duties and Responsibilities:

• Preparing accomplishment reports

• Mechanical Shop Drawings,

• Manpower supervision

• Preparing employee’s Daily Time Record

• Material Take-off

February 13, 1997 – August 16, 1997 MECHANICAL

Company Draftsman

COSMOS Bottling Corporation (CBC)

Canlubang Industrial Estate, Canlubang

Calamba, Laguna

Duties and Responsibilities:

• As-Built Drawing (Bottling Plant Layout & Piping).

• Mechanical Drafting with Vernier Caliper & Scaling. September 13, 1996 – February 13, 1997 MECHANICAL

Company Draftsman

RMI Personnel Resources and Services Inc.

Company Assignment: COSMOS Bottling Corporation (CBC) Canlubang Industrial Estate Canlubang, Calamba Laguna Duties and Responsibilities:

• As-built Drawings (Bottling Plant Layout and Piping)

• Mechanical Drafting with the aid of Vernier Caliper and scaling.

G E N E R A L Q U A L I F I C A T I O N :

ARCHITECTURAL

• autoCAD 2018 / autodesk Revit Architecture 2015

(Basic 2D & 3D Modelling)

• Architectural Designing

• Detailing

• As-Built Drawings

• Interior Designing

• Building Miniature

• Mobilization (Temporary Equipment Facilities)

• Material Take-off / Bill of Quantities (BOQ)

• Perspective Rendering

STRUCTURAL

• autoCAD 2015 / autodesk Revit Structure 2015

• Foundation Plan

• Roof Framing Plan

• Beam and Column Detail

• General Arrangement / Concreting Setting-out

• Blockworks

• Material Take-off / Bill of Quantities (BOQ)

ELECTRICAL

• Lighting Layout

• Cenral Battery System (CBS)

• Building Management System (BMS)

• FM-200 Fire Alarm and Detection System

• Material Take-off

ELECTRO-MECHANICAL

• autoCAD 2015 / autodesk Revit MEPF 2015

• Drainage

• Fire Fighting

• Water Supply

• HVAC

• Coordination Drawing

• Material Take-off

• M.E.P. Builders Work

COMPUTER SOFTWARE

• AutoCAD 2018 (Basic 2D & 3D Modelling)

• MS Office

• Word

• Excel

• Untitled Paint

• Powerpoint

• 3D MAX 5.1

• Adobe Photoshop Latest Version

• Sketch-Up Pro 2015

• Autodesk Revit Architecture 2015

• Autodesk Revit Structure 2015

• Autodesk Revit MEPF 2015

• Navisworks Professional

E D U C A T I O N A L A T T A I N M E N T :

COLLEGE Diploma Holder

1993 – 1998 Bachelor of Science in Industrial Technology (BSIT) - 4 Year Major in: Drafting Technology

Cebu Technological University (CTU)

Formerly Cebu State College of Science and Technology (CSCST) Main Campus – M.J Cuenco Ave., Cor. R. Palma St.,

Cebu City

COLLEGE Third Year Standing

1990 – 1993 Bachelor of Science in Information and Computer Science University of Cebu (UC)

Sanciangko St., Cebu City

S E M I N A R S A N D T R A I N I N G S A T T E N D E D : February 18, 2015 – February 24, 2015 Autodesk Revit Architecture 2015 Microcadd Training Center

Persimmon, Mabolo, Cebu City

Certificate No.: 15BDQWXILO

February 25, 2015 – February 28, 2015 Autodesk Revit MEPF 2015 Microcadd Training Center

Persimmon, Mabolo, Cebu City

Certificate No.: 1AF5023214

March 24, 2015 – March 26, 2015 Autodesk Revit Structure 2015 Microcadd Training Center

Persimmon, Mabolo, Cebu City

Certificate No.: 1NLMRNLM87

October 23, 2013 – October 24, 2013 ETA - KSA

Building Management System (BMS)

Training Programme

UNISTAR - Head Office

Riyadh K.S.A.

May13, 2000 – June 11, 2000 Auto-CADD LT 2000 Module 2 (Advance Training) RAMM Design System Inc.

Balibago, Sta. Rosa, Laguna

April 14 – May 12, 2000 Auto-CADD LT 2000 (BASIC)

RAMM Design System Inc.

Balibago, Sta. Rosa, Laguna

R E F E R E N C E S :

1. Engr. Michel Sabbagh Design Manager

THALES Group

Doha, State Of Qatar

Mobile No. +974-****-****

2. Martin S. Giordan Project Director

Megawide – GISPL Construction Joint Venture (MGCJV) Mactan-Cebu International Airport Project

3. Eng’r. Awni Zeid Project Manager / Senior Architect Commodore Qatar Contracting Company

P.O Box 24250 Doha, Qatar

Mobile No. +974-****-****

This is to certify that everything stated above is deemed true and correct to the best of my knowledge. SALVADOR SAYSON JR. y LAWAS



Contact this candidate