TAOFEEK MONSURU
Home Address: - No. ** Alubarika Street Agosi Estate Ifo,
Ogun State, Nigeria.
Tel. Contact: Nig. +234**********. +234**********.
Email: **************@*****.***, ***********@*****.***
OBJECTIVE
An enthusiastic and Competent Crane Operator/Supervisor with over Eight year Experience. Possess good knowledge of lifting operations and best practices. Wonderful communication and organisational skill with the zeal to succeed and deliver on all task assigned to me in a safe and economical manner.
PROJECTS/ACHIEVEMENTS
Full Rehabilitation of AGIP Crude Oil Tank 8 Project – NAOC BRASS TERMINAL. Bayelsa state. OCT 2019 – Till Date.
Full Rehabilitation of SPDC Crude Oil Tank 10 Project – BOGT TERMINAL, Rivers state. April 2019 – Dec 2021.
Full Rehabilitation of CHEVRON Crude Oil Tank 8 Project – CHEVRON ESCRAVOS TERMINAL, Delta state. April 2018 – Sept 2020.
Completion of Emergency Inspection and Rehabilitation of Forcados Crude Oil Tank T-210 Project - SPDC FORCADOS TERMINAL. Dec., 2014 – Jul., 2017
Completion Of Modification Of Prover-Loop Pipe & Replacement Of 4-Way Diverter Valve Project - SPDC FORCADOS TERMINAL Sept., 2014 – Dec, 2014
LTI free operation SPDC FORCADOS TERMINAL 2014
LTI free operation for tank rehab at NNPC Mosimi Depot. 2014
Completion of Rehabilitation of Tank 11, 12 and 22 at NNPC Mosimi Depot Project - Ogun State Feb., 2013 – Sept.,2014
Dismantling And Reconstruction Of Tank 13 At NNPC Mosimi Depot Project, Ogun State Feb.,2013 – Sept., 2014
Dismantling and Reconstruction of Tank 11 and 21 at NNPC Atlas cove Depot Project, Lagos State. May.,2013 - Jul., 2013
Water Front Property Project – 3 Thompson Avenue Ikoyi Lagos. Feb., 2012 – Feb., 2013.
Completion Nestle Agbara Distribution Center Project Lagos State. Feb., 2011 – Feb., 2012
Completion Of Nestle Flower Gate Project Shagamu Ogun State. Jul., 2009 – Jan.,2011
AWARDS
SPDC FORCADOS TERMINAL ASSET ENGINEERING TEAM AWARD AS: Goal Zero Hero, Best Driver for the Third quarter of 2016.
SPDC FORCADOS TERMINAL ASSET ENGINEERING TEAM AWARD AS: Goal Zero Hero, Best Crane Operator for the first quarter of 2016.
SPDC HEAD TERMINAL ENGINEERING SAFETY AWARD AS: Best HSE compliant Crane Operator/Driver for the first quarter of 2016.
HEAVY DUTY MACHINE OPERATED
Crane (Telescopic boom, Lattice Boom, Gantry, Tower).
Forklift (Telehandler, Wheel Loader, Industrial Forklift, and Bobcat).
Truck (Tipper, Mini Flatbed, Vacuum Truck, and Self Loader Truck).
Man lift.
Light Vehicles.
PROFESSIONAL EXPERIENCE
HOPIC NIGERIA LIMITED, NAOC BRASS TERMINAL. (OCT., 2019 – Till Date.)
Full Rehabilitation of AGIP Crude Oil Storage Tank 8.
Position: Crane Supervisor / Operator
Key Responsibilities.
Loading and off-loading of materials on/from barge
Inspect all necessary tools to be used for the day.
Responsible for maintaining crane against any defects.
Responsible for preparing Lifting Plan and follow up.
Participate in risk assessments and pre-job / kick-off meetings as required.
Responsible for daily work report on site during lifting operation.
Partake in monthly HSE meeting and daily Toolbox talk.
Daily crane inspection using a checklist.
Blind Lifted and Laid 608Pcs of Lower and Upper Deck Plates
Blind Lifted and Installed 68Pcs of Pontoon Manholes and 4 pcs of Roof Manholes.
Blind Lifted and Installed 4 pcs of Roof Drain sumps and its applicable Pipes.
Blind reinstalled the existing Rolling Ladder.
Blind Lifted and Installed 402 Pcs of Roof Rafter support.
HOPIC NIGERIA LIMITED, Shell Terminal, BOGT. (April 2019 – Dec 2021.)
Full Rehabilitation of SPDC Tank 10, BOGT Terminal.
Position: Crane Supervisor / Operator
Key Responsibilities.
Participate in risk assessments and pre-job / kick-off meetings as required.
Daily Inspect all necessary tools and accessories to be used.
Inspect all necessary tools to be used for the day.
Responsible for preparing Lifting Plan and follow up.
Removed and Reinstalled 4-way diverter valve.
Blind Lifted and Installed 7 Foam Pourers
Removed and reinstalled export and booster line recycle valve.
Remove and reinstalled check valve at Manifold 1 and 2.
Responsible for daily work report on site during lifting operation
Daily crane inspection.
Partake in monthly HSE meeting and daily Toolbox talk.
HOPIC NIGERIA LIMITED, CHEVRON ESCRAVOS Terminal. (April 2018 – Sept., 2020.)
Full Rehabilitation of CHEVRON Crude Oil Tank 8 Project.
Position: Crane Supervisor / Operator
Key Responsibilities.
Loading and off-loading of materials on/from barge
Inspect all necessary tools to be used for the day.
Responsible for maintaining crane against any defects.
Responsible for preparing Lifting Plan and follow up.
Participate in risk assessments and pre-job / kick-off meetings as required.
Responsible for daily work report on site during lifting operation.
Partake in monthly HSE meeting and daily Toolbox talk.
Daily crane inspection using a checklist.
Blind Lifted and Laid 608Pcs of Lower and Upper Deck Plates
Blind Lifted and Installed 68Pcs of Pontoon Manholes and 4 pcs of Roof Manholes.
Blind Lifted and Installed 4 pcs of Roof Drain sumps and its applicable Pipes.
Blind reinstalled the existing Rolling Ladder.
Blind Lifted and Installed 402 Pcs of Roof Rafter support.
Partake in monthly HSE meeting and daily Toolbox talk.
ADANO ENGINEERING COMPANY NIGERIA LIMITED, Shell Terminal, FORCADOS. (Sept.,2014 – Dec., 2014.)
Modification of Prover-Loop Pipe & Replacement Of 4-Way Diverter Valve Project
Position: Crane Operator Supervisor
Key Responsibilities.
Participate in risk assessments and pre-job / kick-off meetings as required.
Daily Inspect all necessary tools and accessories to be used.
Inspect all necessary tools to be used for the day.
Responsible for preparing Lifting Plan and follow up.
Removed and Reinstalled 4-way diverter valve.
Removed and reinstalled export and booster line recycle valve.
Remove and reinstalled check valve at Manifold 1 and 2.
Responsible for daily work report on site during lifting operation
Daily crane inspection.
Partake in monthly HSE meeting and daily Toolbox talk.
ADANO ENGINEERING COMPANY NIGERIA LIMITED, NNPC Mosimi Depot, OGUN STATE. (Feb,2013 – Sept., 2014.)
Dismantling, Rehabilitation and Reconstruction of Mosimi Tanks 11, 12, 13 and 22 at Project.
Position: Crane Operator
Key Responsibilities.
Laid Asphalt on the foundation tank
Lifted and Laid Floor Plate and Annular Plates
Erected of tank shell plates Course 1 to course 7
Lifted and installed Internal Floating Roof (IFR) and accessories.
Lifted and installed Tank Dome Roof.
Inspect all necessary tools to be used for the day.
Responsible for daily work report on site during lifting operation.
Partake in monthly HSE meeting and daily Toolbox talk.
Daily crane inspection using a checklist.
ADANO ENGINEERING COMPANY NIGERIA LIMITED, NNPC Atlas cove Depot, LAGOS STATE. (May, 2013 – Jul., 2013.)
Dismantling and Reconstruction of Tank 11 and 21 at NNPC Atlas cove Depot Project
Position: Crane Operator
Key Responsibilities.
Loaded and off-loaded materials on/from barge.
Laid Floor Plates and Annular Plates.
Loaded and offloaded Tank Roof Dome containers.
MONTEROSA CONSTRUCTION NIGERIA LIMITED, 3 Thompson Avenue Ikoyi, LAGOS STATE. (Feb, 2012 – Feb., 2013.)
Water Front Property Project
Position: Crane Operator
Key Responsibilities.
Loaded and offloaded material container.
Casted Beams and decking with crane
Loaded and installed bullet prove glasses
Lifted and offloaded Iron Rod.
MONTEROSA CONSTRUCTION NIGERIA LIMITED, Agbara, LAGOS STATE. (Feb, 2011 – Feb., 2012.)
Nestle Agbara Distribution Center Project
Position: Crane Operator
Key Responsibilities.
Erection of Ware House
Unloading of Steel materials
Offloading of Materials Container
Dismantling and erection of concrete batching plant
Concrete Casting with crane
MONTEROSA CONSTRUCTION NIGERIA LIMITED, Shagamu, OGUN STATE. (Jul., 2009 – Jan., 2011.)
Nestle Flower Gate Project
Position: Crane Operator
Key Responsibilities.
Erection of batching plant machine.
Casting of fence column using crane.
Erection of warehouse.
Loaded and offloaded material containers.
Loaded, offloaded and installed Production Equipment and accessories.
Daily crane inspection using checklist.
CERTIFICATION
IADC Drilling Industry Training (DIT) Accreditation Program – Cert. No: DITE616139 2016
Icon Lifting & Rigging Inspection Limited, Porthacourt.
SPDC Drivers Educational Program (DEP) Certification – Permit No: 6040B 2016
Shell Petroleum Development Company of Nigeria Industrial Area Porthacourt
Survival Swimming Certification with PFD and PPE – Cert. No: CN2014090220. 2014
Shell Petroleum Development Company of Nigeria Industrial Area, Ogunu Warri.
Federal Republic of Nigeria, Industrial Training Fund Certification on Crane/Forklift Operations 2007
ISTC Training Mechanical Department Wapco Ewekoro Plant Ogun State
SKILLS
Considerable experience in Microsoft office.
Leadership Skills.
Crane operator
Wheeled Loader Machine Operator
Tele-handler Machine Operator
Man Lift Machine Operator
Bobcat Machine Operator
Excellent communication skill.
Team Player.
INTEREST
Reading.
Writing.
Travelling.
Operating.
REFEREE
References are on Request