Post Job Free
Sign in

Document Controller Entry Operator

Location:
Al Dafna, Qatar
Salary:
6000
Posted:
March 14, 2022

Contact this candidate

Resume:

FAHAD PAKKAN

Email: -

***********@*****.***

Mobile # :+974-********

WhatsApp# : +91-813*******

Personal Data

Date of Birth : 27/05/1985

Sex : Male

Religion : Islam

Nationality : Indian

Passport no : L 9006587

Passport issue : KOZHIKODE

Date of Expiry : 27/04/2024

Marital Status : Married

Languages Known:

English, Hindi, Malayalam &

Tamil

(able to read, write and speak)

Hobbies:

Internet surfing, Listening

Music & Playing Cricket.

CURRICULUM VITAE

CAREER OBJECTIVE:

Seeking a suitable position in an aggressive organization that will utilize my acquired experience and commitment to excellence with long – term plans to advance into a major management responsibility within the financial function of the firm.

SKILLS SUMMARY:

Highly motivated with strong organizational, analytical, and problem solving skills

Well organized and committed to quality of work and its presentation

Excellent communication and interpersonal skills with exposure working well in time sensitive environment

EDUCATIONAL QUALIFICATIONS:

DEGREE (B.COM from University of Kerala).

Plus Two (Accounting & Auditing from Board of Vocational Higher Secondary Examination Kerala).

S.S.L.C (Govt: Educational Board of Kerala, India) SOFTWARE PACKAGE KNOWNS:

M.S. Office

Microsoft Excel

Microsoft Word

Microsoft PowerPoint

Talisman

Spooling Office

VBC

Computer Typewriting speed.

WORK EXPERIENCE:

(Document Controller / Senior Clerk with 15 years’ Experience in GULF)

I. Working with CONSOLIDATED CONTRACTOR INTERNATIONAL CO. SAL (C.C.C) Ras Laffan, QATAR, since 01 January. 2022 to till now

Project : - North Field East Project Onshore LNG Facilities EPC 1 Package

Site : - NFE1, Qatar

Position : - Document Controller / Senior Clerk

(Piping).

Principal Client : - QATARGAS

Main Contractor : - CTJV

II. Working with CONSOLIDATED CONTRACTOR INTERNATIONAL CO. SAL (C.C.C) Muscat, OMAN, since 21 April. 2018 to June 30 2020

Project : - GHAZEER PROJECT –KHAZZAN CPF PHASE II

Site : - KHAZZAN, Oman.

Position : - Document Controller / Senior Clerk / Senior Clerk

Principal Client : - British petroleum (BP)

Main Contractor : - PETROFAC

III. Working with CONSOLIDATED CONTRACTOR INTERNATIONAL CO. SAL (C.C.C) Muscat, OMAN, since 10 September. 2017 to March 30 2018

Project : - RABAB HARWEEL INTEGRATED PROJECT-

PHASE 2 (RHIP-2)

Site : - HARWEEL, Oman.

Position : - Document Controller / Senior Clerk

Principal Client : - Petroleum Development Oman (PDO) IV. Working with CONSOLIDATED CONTRACTOR INTERNATIONAL CO. SAL (C.C.C) Muscat, OMAN, since 16 September. 2015 to August 15 2017

Project : - CENTRAL PROCESSING FACILITY - KHAZZAN PROJECT (CPF)

Site : - KHAZZAN, Oman.

Position : - Document Controller / Senior Clerk

Principal Client : - British petroleum (BP)

Main Contractor : - PETROFAC

V. Working with CONSOLIDATED CONTRACTOR INTERNATIONAL CO. SAL (C.C.C) HABSHAN, Abu Dhabi, since 12 May. 2014 to June 14 2015

Project : - Bab Habshan Oil and Gas Project (BHOG)

Site : - Habshan, Abu Dhabi.

Position : - Document Controller / Senior Clerk

Principal Client : - ADCO

Main Contractor : - PETROFAC

VI. Working with CONSOLIDATED CONTRACTOR INTERNATIONAL CO. SAL (C.C.C) Shah, Abu Dhabi, since 01 March. 2013 to 10 May 2014.

Project : - Shah Sulphur Station & Pipelines Project.

Site : - Shah, Abu Dhabi.

Position : - Document Controller / Technical Clerk

Principal Client : - Al Hosn Gas, Abu Dhabi Gas Development Company Ltd.

VII. Worked with CONSOLIDATED CONTRACTOR INTERNATIONAL CO. SAL (C.C.C) Sahil, Abu Dhabi, since 01 February 2010 to 28 February 2013.

Project : - Sahil & Shah Full Fields Development Project.

Site : - Sahil, Abu Dhabi.

Position : - Document Controller / Technical Clerk

Principal Client : - ADCO.

Main Contractor : - TRAD and CCC (Consortium)

VIII. Worked with CONSOLIDATED CONTRACTOR INTERNATIONAL CO. SAL (C.C.C) Ruwais, Abu Dhabi, since 01 September. 2005 to 01 January 2010

Project : - 3rd Natural Gas Liquefaction Project

Site : - Ruwais Refinery – Abu Dhabi, U.A.E.

Position : - Technical Clerk

Principal Client : - Abu Dhabi Gas Industries Ltd. (GASCO).

Main Contractor : - Snamprogetti – ITALY

DUTIES AND RESPONSIBILITIES

Preparing Materials Issue to Construction as per Isometrics drawings FWR, FWRR, FAMR, RFF, for field materials and Pipe support, and also updating Iso’s material from Talisman.

Issuance of materials from stores as per shop requirements with Reference to the standards, piping material code & the Isometrics concerned

Updating spool status in Talisman.

Entering the bill of materials for spools as per the Iso.

Entering the full details of the Isometric in Talisman in including spools, Revision, status etc. for easy follow up.

Cross checking BOM sheets and the concerned Iso to make sure exact Materials are being issued.

Checking the Spool Status and thus locate it for helping the checkers And those who are doing revisions.

Carrying out data entry operation using MS-EXCEL.

Typing the Technical queries which are to be raised to the client and maintaining Technical query log for future reference.

Collecting these Isos back from DCG for proper filing.

Sending the Iso to QC department through transmittal for their further action

Follow-up with the QC to get these Iso back as soon as possible after QC Stamping.

Sending these Isos to Document Control Group (DCG) for their approval and stamping.

Collecting these Isos back from DCG for proper filing.

Helping the test pack team by printing the Isos, P& IDs, GAD drawings and Pipe supports.

Execution of the entire document works in the Engineering department

This includes proper filing of Drawings such as P& ID, GA Drawings. Isometrics, Test packs, Method Statements, Piping Standards, piping spool drawings etc.

Preparing field ware house requisition using Talisman for spools and field runs.

Preparing Transmittal to DCG and QC using Talisman.

Preparation of Test Pack release Records.

Talisman entry of each Test Packs.

Test Packs location Records.

Preparing all documents for Test packs.

Helping the draughts men in printing out the Isos and Spools which are to be Checked and Revised before its issue.

Checking the Spool Status and thus locate it for helping the checkers and those who are doing revisions

Printing out BOM sheets for each Iso using the software named ‘TALISMAN’.

Locating the Isos by maintaining path log using MS- EXCEL.

Helping the test pack team by printing the Isos, P& IDs, GAD drawings and Pipe supports.

Helping the engineers for raising Technical queries for Detail engineering.

Preparing Red line mark-up drawing.

DECLARATION:

I hereby declare that the information’s given above are true and correct to the best of my Knowledge and belief.

FAHAD PAKKAN

Place:

Date:



Contact this candidate