Post Job Free
Sign in

Mechanical Engineer Solar

Location:
Madhya Pradesh, India
Salary:
50000
Posted:
March 03, 2022

Contact this candidate

Resume:

Page * of *

Neeraj Singh

Mechanical Engineer-Projects

***************@*****.***

896-***-****

Chhoti Sagore, kuti

Pithampur sec. no-3

AREA OF

INTREST

Project Planning

Project Co- ordination

Project Execution

Thermal Engineering

Piping Engineering

Fluid Dynamics

HVAC System

EDUCATION

1. BE Mechanical

with 6.6 CGPA

From Shiv Kumar

Singh Institute

Technology Of

Science, Indore

2015,

2. 12th with 51%

From : Govt. Higher

Secondary School

Sagore Dist- Dhar.

3. 10th with 63%

From : Govt. Higher

Secondary School

Sagore Dist- Dhar.

PERSONAL

INFORMATION

Date of Birth

: 14th March 1992

Marital Status

: Unmarried

WORK EXPERIENCE

1. M/s. Archimides India Consultants Pvt. Ltd. Ahmedabad Engineering & Facility (Project Management system) 06/2021 - Present,

Technical coordination & supervision mainly in installation of Electrical, Mechanical, Plumbing & HVAC services works as per approved BOQs.

Preparing project schedules and its adherence & Scheduling, managing & allocating work to all the vendors as per BOQs.

Maintaining accurate records of work performed at site, materials used, and associated costs & Maintenance of Plant for Chiller, HVAC System & Utility Determine work requirements and sequence of work assignments through review of POs, work orders, plans, or drawings. Rate analysis & value engineering & Tendor estimation for project. Managing and training staff in the general maintenance of buildings, grounds & equipment as well as implementing and maintaining effective documentation or reporting system for equipment control, finances and preventive maintenance. Leading and training maintenance team to follow best and approves procedures and practices as well as ensuring all maintenance requests are reloved in a timely and effective manner. Overseeing management of life safety systems and related documentation in accordance with applicable standards and codes

Coordination with the transition management team & Construction management team Schedule maintenance of AHU & TFA units.

Prepare Engineering report for breakdowns.

Consulting with Engineers & Contractors for renovation & maintenance of facility. Preparing & maintaining accurate, timely, coherent and auditable Project records and files. 2. M/s. Sai Hi Tech shot Abrasive Pvt. Ltd.

at Pithampur

06/2019 - 06/2021,

Project estimation; Project planning; Project co- ordination & Project execution - Large scale EPC projects (plant/non-plant Pharma Formulation / API / Automobile facilities). Co- ordination with managers, clients and team members to set expectations, deliverable, and objectives.

Preview of vendor drawing & coordination with various engineering groups & site. And ends with completion & commissioning of plant.

Review and Monitoring overall project and individual stakeholder progress throughout the project life- cycle & Process package.

To co-ordinate & communicate effectively with consultants / concern internal departments (i.e. Purchase / Accounts / Finance / Store / HSE / Engg. / Production) for timely deliverable & agencies and contractor for work related Civil, Electrical and Mechanical Execution. To prepare project summary & BOQ based on end user requirements & Preparation & review of enquiry Documents coordinating with user requirements. Installation & commissioning of Piping & Utility System i.e. Cooling Towers, Utility / Pumps, Air Compressor, Air Handling Units, Process water piping, etc… Erection / installation / Commissioning of Spray dryers, ID / FD blowers, Blenders, Cyclone separators, Pressure jet bag filters, Air Jet Mills, Air classifier mill, Kettle reactors, Process Pumps, etc..

Preparing of P& ID for powder plant and liquid plants based on process requirement & Preparation & review of enquiry Documents coordinating with user requirements. To ensure safety conditions with respect to execution; pre-commissioning, commissioning & start up activities at site.

Responsibility

Responsibility

Page 2 of 2

PERSONAL

INFORMATION

Father Name

: Mr. Yogendra Singh

Mother Name

: Mrs. Sita Devi

Permanent Address

: Chhoti Sagore, Post- kuti

Sector No-3 Dist- Dhar

Madhya Pradesh 454774

LANGUAGES

English

Hindi

TECHANICAL

MANAGEMENT

SKILLS

Project Management

Methodologies

Resource Planning and

Management

Time Management /

Scheduling

Cost

Assessment/Budget

Management

Conflict Management

and Resolution

Prioritization

Leadership

Decision- Making

Accountability

Problem Solving/Critical

Thinking

Confidence

Adaptability/Pro-

activity

Open- mindedness/

Trainability

Collaboration/

Relationship building

WORK EXPERIENCE

3. SD Electrical & Engineers, Pithampur

MEP Project Handling In Torrent Pharmaceuticals Pithampur 01/2017 - 12/2018,

Project planning; Project budgeting; Project estimation & Project execution. Co- ordination of large scale EPC project, consultants for projects under execution & agencies and contractor for work related Civil, Electrical and Mechanical Execution & with procurement department for timely and smooth processing of purchase order/work order. To report superior daily for progress and quality work. Preparation & review of Enquiry Documents coordinating with user requirements & project summary & BOQ based on end user requirements.

Carry out technical discussion with vendors based on technical requirements. Installation & commissioning of total Piping & Utility System i.e. Boiler, Chimney, Chiller, Cooling Towers, Utility Pumps, Water Treatment Plant, Air Compressor, Air Handling Units, Sewer water piping, Storm water piping network, Raw water piping, etc… To ensure safety conditions with respect to pre- commissioning, commissioning & start up activities at site.

Preparation of Monthly Progress Report for management review consisting of Project summary, current project status including site progress, expected completion & Critical issues. To allot project related jobs to the agencies person/workers working under him. Certifying patty contractor bills, measurement checking, Joints measurement, witnessing ongoing activities and coordinating with respective department. 4. Avtec Motor Pvt. Ltd

at Pithampur

08/2015 - 12/2016,

Worked as a Graduate Engineering Trainee.

To find out the solutions & root cause analysis for problems taken in the IC Engines. Root cause analysis of breakdowns in automated production lines To reduce the breakdown frequency & Production Loss. To apply Productive Maintenance Techniques & enhance productivity of Production Lines. PROJECTS

- At Collage 2014-2015

-

Minor Project on Study of Free Energy Generation by using magnets. Major Project on Solar Refrigeration. Refrigeration Effect (Cooling) Produced by Solar Energy with the use of Solar Panels.

PERSONAL SKILL

Preparation of URS / DQ / IQ / OQ / PQ Team Building / Site Management COMPUTER SKILLS

AutoCAD Microsoft Office

DECLARATION

I hereby declare that the information mentioned in this document is correct up to my knowledge and I bear the responsibility for the correctness of the above- mentioned particulars

- . Neeraj Singh

Responsibility

Responsibility

FREE ENERGY GENERATION



Contact this candidate