ARUL VIJIN
Position: Electrical Engineer
Dubai, UAE
Mobile: +971-**-*******(UAE)
Mobile: +91-994*******(IND)
e-mail: *********@*****.***
Possess experience in design of electrical systems for residential and commercial high-rise buildings, mix developments and industrial buildings, Have installation and T&C experience in railway systems. I have also acquired installation experience in building services of commercial, residential and industrial building projects. With the interpersonal skills, attitudes, problem-solving ability, in-depth technical knowledge and practical abilities developed through the career in multi-disciplinary, I am prepared to take up a challenging position of an engineering Design or Construction project.
Technical Skills:
Lighting Calculation
Small Power Design
Cable sizing calculation.
Load Schedule
Electrical Schematic
Diagram
Cable Tray, Ladder sizing
calculation.
Quantity take-off
WORK EXPERIENCE
August 2020 - Present
Pyramid Valley MEP LLC
PROJECT: AL FATTAN KARAMA
Position : Electrical Engineer.
Duration : Feb 2021 to Nov 2021
PROJECT: Burj Al Arab Refurbishment (Contract Engineer at BKG) Position : Electrical Engineer.
Duration : Aug 2020 to Oct 2020
Responsibility:
Preparing Load Schedule, Single Line diagram for Al Fattan Karama.
Review and submit electrical shop drawings for Al Fattan Karama.
Site survey for understanding the existing services and available space to run the new cables for upgraded mechanical services.
Upgrading the exist electrical panel based on new mechanical requirements.
Preparing site markup.
November 2017- April 2020
Acciona Infrastructures, Gulermak Heavy Industries & Alstom JV
(Expolink 2020 Dubai Metro JV)
Project: Route 2020 Metro Rail Project to extension branch of the Dubai Metro Rail from Jabal Ali Metro Station-2 to Expo station including seven stations. (UAE)
Position : Electrical Engineer
Responsibility:
Monitor Electrical installation in MPSs, viaduct, tunnel and stations as per approved standards and code.
Supervising the installation of LV Panels (MDB, PC, SMDB, MCC, MCP, etc.), Cable tray, Cable pulling and dressing, Earthing in Viaduct (Pier& Pile, Handrail, Parallel Earth conductor(PEC), Tendon bonding) Tunnel(PEC and D-wall’s)& Stations (Underground, Slab bonding in the LV Rooms), Lightning Protection System.
Arrange the mock-up installation and obtaining approval from the Construction Skills:
Cable Containment
Installation.
Cable Laying and
Dressing
Earthing, Lightning
Protection.
LV Panels Installation
Cable Termination.
Busbar Installation
Mock-up arrangement
T&C Skills:
T&C of LV Panels
System Integration Test.
CBS and UPS
Earthing & Lightning
Protection System.
Lighting and Small
Power.
Fire Alarm Systems.
Mode Test.
Cause and Effect.
Cable Test.
Software Skills:
MS Office (Excel, Word,
Power point).
DIALux .
AutoCAD
Revit
Bluebeam
Awareness About
o Primavera-P6
o MS Project
o Navisworks.
Engineer prior to commence full-scale installation (Cable Containment, Handrail lighting (Viaduct), Cable Dressing, etc.).
Preparation of weekly site progress report for progress meeting with consultant and the client.
Close monitoring to the sub-contractor progress and achieve the target dates.
Arrange weekly meeting with sub-con and review the site progress with construction program and take mitigation wherever require to achieve the target.
Arranging third party inspection with the Engineer for Fire Protection System (Butler Engineering).
Responsible to liaise with consultant and get approval of electrical installation.
Responsible for the closure of Non-Conformance Notices (NCN) & Site Observation Reports (SOR).
Testing and Commissioning.
Ensuring Testing and Commissioning activities are carried out in accordance with the commissioning programmer and meet the target dates.
Making weekly T&C plan, look ahead plan and report it to the manager.
Notify consultant on upcoming T&C activities.
Ensure that the installation is carried out as per the MS and shop drawings and its approved by the consultant, defects found shall be liaised with concerned team to complete the pending work in order to avoid delay in commence T&C.
Monitor testing activity and ensure all are in compliance with the project specification and requirement.
Preparing test packages, test records and submit it to consultant for approval.
September 2015- October 2017
East Knowledge Information Technology (Under ALSTOM) PROJECT: Dubai Tram. (UAE)
Position : General Engineer – Electrical.
Responsibility:
Leading as In Charge of site activities and snag works clearance.
To assign the daily work for electrical supervisors to co-ordinate with them entire work up to completion.
Organizing inspection with the engineer to close open comments in the ITRs.
Preparing Red Line markup as per site and submit to the consultant for them approval.
Liaising with the consultant for As-Built drawing approvals.
Executing mitigation measures and rectification works.
Update cable schedule as per site installation.
Follow-up of Change Requests, Quality Site Observations, and Master Punch List.
Monitoring the activity progress with the sub-contractors.
Prepare work schedule and tracking the sub-con activities. May 2013- August 2015
COMMANDtech Cad and IT (P) Ltd. (India)
PROJECT : Algaith(Villa-Dubai), Labour camp Project(Dubai), Residential Building(12F Dubai)
Educational Background:
Bachelor in Electrical and
Electronics Engineering
Anna University
2009-2013
TN, India.
High School
2007-2009
TN, India.
Personal Particulars:
Passport No. : K9976237
Nationality : Indian
Sex : Male
Date of Birth : July 1991
Languages :
o English
o Tamil
o Malayalam
Driving License : UAE
Mobile number :
(UAE)
(India)
E-mail :
*********@*****.***
Skype ID : arulvijin
LinkedIn : ArulVijin
Position : Design Engineer - Electrical.
Duration : May 2014 to Aug 2015
PROJECT : Shopping Complex(India), Abraj Quartier(Qator), Amity University Campus(Dubai)
Position : Project Engineer.
Duration : May 2013 to May 2014
Responsibility:
Lighting Calculation using Dialux.
Preparing LV schemes, Load Calculation, Cable size calculation, Tray/Ladder sizing.
Review shop drawing and submit it to the main contractor.
Handling client requirements as per design specification,
Preparing BOQ.
Co-ordinate with suppliers and incoperate their requirments.
Prepare red-line markup (shopping complex)