ENGR. MURSIMAR A. KURSID
Personal Skills
Oracle, MS Excel, MS Word
Master in Draftsman
Experience of the tender
stage & of dealing with
procurement issues.
Active seeking a position as a: Sr.Quantity Surveyor / Cost Engineer Career Objective:
To obtain a challenging position in electrical Engineer with an organization of repute that will provide an opportunity to utilize my knowledge of electrical Engineer continuing my personal and professional growth where my positive attitude Job Integrity Experiences and strong & desire Company to succeed will contribute to company’s success. Currently 1. AYESA Work - SUPERVISION at: CONSULTANT: Engineering & Commercial Department at
New Satellite Plants Water Transfer Systems.
Client- Cost Summarize Accomplishments. Data Duties: that Engineer Saline shows your Water the From key Don’t impact responsibilities, Conversion 2021 list you everything; Up made. to- Present Corporation leadership, keep it relevant and most and stellar include
Working Assist Undertake Reviews Providing works Prepare Developing Responsible Inspecting Produce Attending Monitoring Responsible Analyze in proposals, outcomes tender monthly establishing and on advice meetings and cost the strong a for for for updates. number then cost analysis and managing quantity making and cost and relationships contract of and valuing a guidance & of site write client's Invoice for liaising value build take-all resources. repair completed documents, detailed project off reports, projects requirements to or with with and staff and Payment costs stakeholders progress the cost in maintenance quarterly at work. including the clients any estimation. from Certificate. preparation and one reports. pitch and reports undertake time. on bills project subcontractors. to commercial of completion. & and quantities cash work. feasibility presentation flow matters. with information. studies. the of client.
water Haqil Project: throw pipe Pump line station (4.6 KM) connected to a Terminal to Existing tanks concrete (2 tanks Tanks 25,000 to m3 transmit each).
water Duba Project: throw pipe Pump line station (3.3 KM) connected to a Terminal to Existing tanks concrete (2 tanks Tanks 30,000 to m3 transmit each).
AL water Wajih throw Project: pipe Pump line (4.station 75 KM) connected to a Terminal to Existing tanks (2 steel tanks Tanks 30,000 to transmit m3 each).
Amluj water throw Project: pipe Pump line station (4.6 KM) connected to a Terminal to Existing tanks concrete (2 tanks Tanks 17,000 to m3 transmit each).
AL capacity) 50,000 Laith m3)Project: to . transmit Pump water station throw connected pipe line to (a 4.new 8 KM) product to a terminal tank (25,tank 000 (1 m3 tank
Farasan Project: Product tank (30,000 m3 capacity) Ayesa Project: NEW SATELLITE PLANTS WATER TRANSFER SYSTEMS Shemisi Riyadh K.S.A
Saudi Council ID 227840
Contact # 053*******
***************@****.***.**
******@*****.***
Transferable Iqama
https://www.linkedin.com/in/mu
rsimar-kursid-482030118/
I THE INFORMATION’S TRUE WITH KNOWLEDGE BELIEF HEREBY ABOVE AND THE CERTIFY BEST CORRECT AND OF ARE THAT MY Educational Attainment:
Objective
To obtain a challenging
position in Electrical Engineer
with an organization of
repute that will provide an
opportunity to utilize my
knowledge of electrical
Engineer continuing my
personal and professional
growth where my positive
attitude, Integrity and strong
desire to succeed will
contribute to company’s
success.
Personal Background:
Name: Mursimar A. Kursid
Nickname: Mursi
Sex: Male
Citizenship: Filipino
Religion: Islam
Civil Status: Married
2. . BAYTUR Contract & CONTRACTING Commercial Department COMPANY: at KAP-2 As. Electrical Quantity Surveyor Engineer From 2020 Up to- 2021 Duties: Project King Abdulla Financial District (KAPD) BAYTUR Developing Working Inspecting Attending Assist Monitoring Undertake Analyze Reviews Providing Prepare Responsible Produce Responsible Project: in outcomes tender monthly establishing and on King advice meetings and cost the strong a for for for updates. number then cost Abdulla analysis and managing quantity making and cost and relationships contract of and valuing a guidance & of site write client's Invoice for liaising value Financial build take-all resources. repair completed documents, detailed project off reports, projects requirements to or with with and staff and Payment District costs stakeholders progress the cost in maintenance quarterly at work. including the clients any estimation. from (Certificate. KAPD) preparation and one reports. pitch and reports undertake time. on bills project subcontractors. to commercial of completion. & and quantities cash work. feasibility presentation flow matters. with information. studies. the of client. works
Parcel Parcel Parcel Parcel Parcel 405-***-***-*** 506 3. EL-SEIF ENGINEERING CONTRACTING COMPANY:
Contract & Commercial Department at KAP-2 As.
QS Electrical From 2019 Up to- 2021
Duties: Project (KAP2-A)
KAP2- A Providing Developing Working Inspecting Attending Assist Monitoring Undertake Site Analyze Reviews Site Prepare Responsible Produce Responsible Dammam – – 1, 7, in Site Site outcomes tender monthly establishing and on advice meetings and cost Road the strong a – – for for for updates. number 3, 8, then cost analysis and managing quantity making Site Site and Project: cost and relationships contract of and valuing – – a guidance & of 5, 9, site write client's Invoice for liaising value Site build take-all resources. repair completed documents, detailed – project off reports, projects 6 requirements to or with with and staff and Payment costs stakeholders progress the cost in maintenance quarterly at work. including the clients any estimation. from Certificate. preparation and one reports. pitch and reports undertake time. on bills project subcontractors. to commercial of completion. & and quantities cash work. feasibility presentation flow matters. with information. studies. the of client. works
COLLEGE: ZAMBOANGA COURSE: COMM. ENGINEERING BACHELOR UNIVERSIDAD 1999-2004 OF SCIENCE DE ELECT & 4. AZMEEL CONTRACTING COMPANY:
Estimation Department Infra As.
Electrical Quantity Surveyor Engineer
In Bidding Department From Nov 2014 to Nov 2019
Duties:
5. Working CCE Assist Undertake Reviews Providing Developing Inspecting Attending Monitoring Analyze Responsible Produce Responsible - in Constracting outcomes monthly establishing and on advice meetings and cost the strong a for for updates. number then cost analysis managing quantity and cost and relationships of and valuing a guidance & of site write client's for liaising value build & take-all resources. repair Construction completed detailed project off reports, projects requirements to with with and staff and costs. stakeholders progress the cost in maintenance quarterly at work. the clients any estimation. preparation Enterprices and one reports. and reports undertake time. on project subcontractors. commercial & and cash work. feasibility Ltd. presentation flow matters. information. studies. of works MEP Electrical engineer From 2012-2014
Duties:
Prepare Responsible Produce Responsible Attending Monitoring Analyze outcomes tender monthly meetings the for for for cost and managing quantity making cost and contract of and & site write Invoice liaising value take-all resources. documents, detailed project off reports, or with and Payment costs stakeholders progress cost quarterly including estimation. from Certificate. reports. pitch reports on bills to commercial of completion. & quantities cash flow matters. with information. the client. CCE Project: Crown RTCC Plaza Hotel
6. SAUDI OGER LTD.
Electrical Quantity Surveyor From 2008-2012
P.O. Box 1449 Riyadh K.S.A
Kingdom of Saudi Arabia
Duties:
Site Attended Prepared Prepared Responsible inspection Coordination Material material for for and quantity making Quantities quantities measurement meeting Invoice take-of of off Electrical or Electrical with and of Payment work other cost Low Low under estimation. discipline Certificate. Current. Current renovation and for consultants. Material or construction. Submittal. CCE Project: King Princess King Abdulla Abdulla Nora Road Financial University District