Objective:
To obtain a Challenging Position, where I can utilize my capabilities, team working skill to make a positive impact with a growing organization
Job Profile
Having more then 20 years of experience in PMC Planning, Project control, Delay analysis,Scheduling Analysis,Forecastng, resource planning,Cost estimating, Develops implements and maintains Cost Control System in accordance with approved procedure Cost budget, Monitor variations in cost, Cost performance report. Establish consistent method of risk management from identification assessment.
Track schedule & milestones, escalate delays in completion of projects. Recommend preventive/corrective actions enabling timely completion of projects
Prepare expenditure profile, work force histograms, and comparative cost estimates
Prepare project control presentations to project teams and management
Fully conversant with QA, QC and HSE requirements for incorporating in EPC packages
Provide cost estimate support and establish criteria for defining cost estimates class and accuracy.
Design Engineering, Project co-ordination, Procurement Monitor MDR and Commissioning status report, project monitoring, Performance reporting for various refineries, Method statement for progress reporting Oil & Gas green field, brown fields, LNG plants, FPSO tender schedule,FPSO packages and E-House, Petrochemical, Power /Process Industries, Subsea riser, Shutdown gas plant.
telecommunication and MEP industries, EPCI contractor and PMC consultant.
Excellent working knowledge in Project Management software and most of familiar pc based software application.
Educational Qualification
Bachelor of Mechanical Engineering, from University of Madras, April 1993
Computer Knowledge
Project Management Package : Primavera Project Planner P6 V19.0 & Safran V3.7,MS Project.
Employment History
Brunel Indonasia
Field Planning & Control Supervisor
From(Aug 2019 to Now)
Project :RDMP Balikpapan (Indonesia), Lawe-Lawe
Built the EPC overall high level plan, and monitor progress. Review the Progress measure procedure. Monitoring Engineering,Procurement, construction progress and make report.
Whessoe India
Project control & Planning Engineer
From (Nov 2015 to Sep2018)
Project:-LNG Regasification Terminal Project Mundra india.
Built the EPC overall high level plan, and monitor progress. Records project meetings and circulates the minutes of meeting.
Identify project concerns, liaise regularly with other departments and resolves. Acts as nucleus to ensure a complete EPC package for tendering.
Analyze, optimize resources, for Integrated project schemes
Prepare, recommend evaluation criteria for pre-qualification of contractors and for evaluating technical bids. Evaluate and recommend technical bids.
Provide technical guidance to planning engineer, cost controller and OS during the development and execution phases .Fully conversant with QA, QC and HSE requirements for incorporating in EPC packages.
Provide cost estimate support and establish criteria for defining cost estimates class and accuracy.
Establish consistent methods for risk management from identification assessment-
Prepare expenditure profile, work force histograms, and comparative cost estimates.
Leads planning, costing, contract administration and project reporting functions
Prepare project control presentations to project teams and management
Analyze, monitor and control cost variation
Prepare and circulate project status, schedule and cost performance reports.
Index career Consultants Pte Ltd
Sr Project Planner
From(Nov 2014 to June2015)
Project:-Jangkrik FPU -- E-House Project
Planning and Progress Reporting Package according to approved procedure of Planning and Progress Reporting .Responsible for work activity progress reporting and regular update of plan and schedule
Verifying indents of materials & controlling the delivery. Weekly and monthly reports.
Project Involvement / key performance: Involved from detail engineering up to commissioning activities on the development and implementation of overall planning, scheduling and control of the Project. Established and implemented progress measurement system based on agreed WBS for all project phases, Initiated and managed multiple sub-contract project planning
Axis Offshore
From(April 2014 to Aug 2014) As a Project Planner
Project:-Semi-Submersible Accommodation Vessel
Progress reporting. Monitor the subcontractor Progress and schedule. Follow the critical path in schedule,Achieved milestones and delay activities . Monitor man hours and productivity .
Statoil Norway
From (June 2012 to Dec2013) As a Sr.Planning Engineer
Perform a verify of cost engineering functions, Budget preparations, Forecasting and cost reporting under limited Supervision. Monitor subcontractor weekly &Monthly reports. Prepare Measurable/Non measurable reports Review. Assist with Project Control Manager.
Monitor the commissioning package report. Project Report weekly & Monthly. Monitor subcontractor progress reports. Receive progress information and update plan accordingly .Analysis the plan variance slippages corrective action to be take.
Project Involved
1.Worked in Karsto Expansion Project(KEP) 2010.(Expansion Project Cost 92M Nok)
2. Working in Statfjord B&C Fire and Gas modification Project.
Aibel Singapore
From (July 2011 to May 2012) As a Sr.Planning Engineer
Built a Complete Planning and Progress Reporting Package according to approved procedure of Planning and Progress Reporting .Responsible for work activity progress reporting and regular update of plan and schedule. Resource optimization/prioritization in conjunction with project engineer .
Analyzing variance in cost and schedule performance against plan. Review of contract
Items, Invoices,variations and preparing of variation . Prepare schedule performance measurement reports, and forecast. Conducting weekly progress/coordination meeting(internal and with the subcontractors).Verifying indents of materials & controlling the delivery. Weekly and monthly reports. Project Involvement / key performance: Involved from detail engineering up to commissioning activities on the development and implementation of overall planning, scheduling and control of the Project. Established and implemented progress measurement system based on agreed WBS for all project phases, Initiated and managed multiple sub-contract project planning both on-stream and shutdown related scopes. Prepared and issued analysis of schedule indicating critical activities, loss of floats and provide recommendation on corrective actions. Carried out program revisions and updates on a regular basis to ensure information and decisions are incorporated and made available to project team. Involved in the evaluation of suppliers / vendors / contractors technical proposal, review and approve contractors planning / scheduling of manpower and equipment. Prepare and issue periodic project reports, supervise and monitors planners/schedulers and contractors planning team.My experience in FPSO modification modules Gas water injection,Water treatment module, HP gas compressor module and E-house module. I make schedule in Aibel Singapore for Rubicon
Project Involved:-
1.Gudrun wellhead platform from State oil(895838 hrs for engineering onshore, 2.7B NOK Project cost)
2.GEM Modification Project from Conocophilp
FAITHFUL+GOULD Oman
(From Dec 2010 to May 2011) As a Planning Engineer.
Preparing planning package including “S” curves, Manpower Histograms, Resource curve & Progress curve ( Engineering and Commissioning curves).
Analyze Schedule Critical Path .Develop progress measurement systems for all phases of the project and determination of weight factors. and short fall reports.
Preparing all necessary Project reports (weekly and monthly) for client reporting as well as higher management internal reporting. KPI (key performance indicator) against vendor document and Engineering deliverable
Assist Planning Manager in executing the project, Control cost and forward claims, Cash flow diagram, Monitoring project progress, status of Drawings, Procurement and shipping activities Procurement weekly report against TBE, PO and Delivery of equipment Constantly monitors cost by matching the actual against contracted amounts.
Project Involved:-
1. Octal Petrochemicals FZS (P1&P2)
J.RAY McDERMOTT Singapore
(From Jan 2008 to Dec2010) As a Engineering Planning .
Preparing planning package including “S” curves, Manpower Histograms, Resource curve & Progress curve .( Engineering,Marine and Commissioning curves).
Develop progress measurement systems for all phases of the project and determination of weight factors. and short fall reports.
Analyzing variance in cost and schedule against plan . Work closely with project engineer for over all project plan built and progress reporting . Work activity and FEED progress reporting and regular update of plan and schedule.
Preparing all necessary Project reports(weekly and monthly) for client reporting as well as higher management internal reporting. KPI(key performance indicator)against vendor document and Engineering deliverable
Assist Planning Manager in executing the project, control cost and forward claims, Monitoring project progress, status of Drawings, Procurement and shipping activities Procurement weekly report against TBE, PO and Delivery of equipment
Project Involved:-
1. Platong Gas II, Chevron Tailand(20943T include LQ,382600Hrs for Engineering.Cost of project 3.1B$)
2. KTT Esso Australia (Riser platform design & fabrication.Engineering-35000Hrs,and fabrication 54125Hrs.)
PT NIPPON STEEL BATAM Offshore services Indonasia Batam
(From Nov 2006 to 13 Nov 2007) As a Planning Engineer.
Preparing detailed Schedule for the Project activities in Primavera(P5)- for project including Decks, Jacket. Equipments & Structures.
Preparing planning package including “S” curves, Manpower Histograms, Resource & Cost Curve, Procurement Log,Material Log etc.
Develop progress measurement systems for all phases of the project and determination of weight factors . Resource optimization/prioritization in conjunction with project engineer early warning of plan delay and proposals for mitigation to project engineering for resolution .Update the financial analysis database for unit cost of the BOQ items during different phase of the projects.
Report Preparing all necessary Project reports(weekly and monthly) for client reporting as well as higher management internal reporting.
Assist Project Manager in executing the project, control cost and forward claims, Monitoring project progress, status of Drawings, Procurement and shipping activities
Project Involved:-
1)Sisi Nubi Field Development Phase 1 Offshore platforms
MWPN,MPN2,MWPS Jackets & Decks
2) Peciko-5 Jacket & Deck
JUMMA AL MAJID-EMW LLC, Dubai-UAE
(From Oct 2005 to Nov 2006) As a Planning Engineer.
Preparing detailed Network/Schedule for the Project activities in Primavera(P3)- for multidisciplinary project including structures, mechanical equipments, Piping, Electrical & Instrumentation, HVAC, Fire Services, and Plumbing & Drainage.
Preparing planning package including “S” curves, Manpower Histograms, Resource & Cost curve, Procurement Log,Material Log etc.
Develop progress measurement systems for all phases of the project and determination of weight factors.
Preparing all necessary Project reports(Daily, weekly and monthly) for client reporting as well as higher management internal reporting.
Assist Project Manager in executing the project, control cost and forward claims(Delay valuation), against the finish date.
Project Involved:-
1) Dubai Mall [600 Million] World biggest Mall(MEP work)
B.K.Gulf L.L.C . (Dutco-Balfour Beatty Group), Dubai-UAE
(From May 2003 to Sep 2005) As a Planning Engineer.
Preparing detailed Network/Schedule for the Project activities in Primavera(P3)- for multidisciplinary project including structures, mechanical equipments, Piping, Electrical & Instrumentation, HVAC, Fire Services, and Plumbing & Drainage.
Preparing planning package including “S” curves, Manpower Histograms, Resource & Cost Profiles, Document register,Procurement plans etc.
Develop progress measurement systems for all phases of the project and determination of weight factors.
Preparing all necessary Project reports(weekly and monthly) for client reporting as well as higher management internal reporting.
Assist Project Manager in executing the project, control cost and forward claims, Monitoring project progress, status of Drawings, Procurement and shipping activities
Delay assessment and preparing claims.
Project Involved:-
1) Dubai Marina South Towers 40,28,22 Floors [120 Million]
2) Al Mankool Tower 22 floors Twin Towers. [45 Million]
3) Jet Aviation [50 Million]
4) Hanger and Royal Terminal, AX 151 Dubai Airwing Facilities, UAE. [160 Million]
Asia Biggest Hangar
Design Desk India Pvt Ltd., Chennai.
(Nov 2000 to Mar 2003) As a Project Engineer.
Produced the Detailed Project Planning Schedule with a detailed Work Break-Down Structure, Targets, and Intermediate Milestones and Monitoring Projects using Primavera Project Planner for various power/process Projects.
Prepared the following reports:-
Pure logic Diagram (Critical –Path Method Network)
Bar Chart
Manpower profile and manpower curves.
Drawing Control sheet and man hour estimate
Man hour and physical progress charts.
Manpower loading offloading charts
Design contractor weekly report to expand man hour
Cost performance curve
Project S-Curves
My Design Experience Includes:-
Created Detailed Plant Maintenance exploded isometrics drawing using AutoCAD Created General arrangement drawing. Piping plan and construction isometrics drawing . using Design and Drafting Software like AutoCAD and ADL Pipe. Responsible for creating 3D Piping drawing from 2D drawing Using ADL Pipe and Created semi-automatically the
construction drawing from isometric drawing automatically generated the material take –off(MTO).
Produced the Detailed Project Planning schedule with a detailed work breakdown structure, Targets and Intermediate Milestone and Monitoring Project using Primavera Project Planner for various PSA hydrogen .PSA Nitrogen and shutdown project.
Prepared the weekly Project progress report in the from of bar charts indicating target and current schedule and schedule report.
Prepared the weekly Project Progress report in the from of bar charts indicating targets and current schedule and schedule report.
Prepared the monthly project progress reports summarizing progress for each month, and work area with Delay and Solution.
Prepared work-Down structure, Logic diagram (PERT& CPM) schedule report (activity List) bar chart,Monthly turn –around document, actual & Planned bar chart. Resource Planning
Resource and cost curve,manpower Histograms using Primavera project planner.
Project Involved:-
Hydrogen plant –Hindustan petroleum Limited, India stripper unit-Hindustan Petroleum limited India. PSA nitrogen-Asia peroxides Limited, Chennai, PSA Nitrogen Plant-Atv Bombay, India.
PSA Hydrogen Plant –mangalore petrochemicals Limited Mangalore, India.
Telecommunications Consultants India Ltd, P.O. Box 17097, Accra North,
Ghana (West –Africa).
Feb 1998 to Aug 2000 As a Project Engineer
Produced the Detailed Project Planning Schedule with a detailed Work Break-Down Structure, Targets, and Intermediate Milestones and Monitoring Projects using Primavera Project Planner for various Projects.
To identify the problematic areas and find solutions, to complete the project/ contract in time.
Monitoring the Projects and Co-ordinate with various Departments and vendors for smooth running of the project.
Attending monthly progress review meetings (minutes of meeting) with client.
Prepared monthly progress review reports, which indicates the target dates Vs current status.
Prepared the following Reports:
Activity List
Bar Chart
Pure Logic Diagram
Man Hour Histograms
Cost Curves
Bar Chart showing Actual Vs Planned
Project S-Curves
Project Involved:-
Copper Subscriber Access Network, Ghana Telecom, Ghana.
Kinetic Technology India Limited(KTI)
(A Mannesmann Company) New Delhi, India
Feb 96 to Feb 98 As A Project Planning Engineer.
Produced the Detailed Project Planning Schedule with a detailed work Breakdown structure, Targets and Intermediate Milestone and Monitoring project using primavera Project Planner for various PSA hydrogen PSA Nitrogen and shutdown project.
Prepared the weekly project progress report in the form of bar charts indicating target and current schedule report.
Prepared the monthly Project progress report summarizing progress for each month, and work area with Delay and Solution .
Prepared work-Down structure, Logic diagram(CPM & PERT) schedule report(activity List) bar chart, Monthly turn-around document, actual & planned Bar chart. Resource
Planning, Resource and cost curve, Manpower Histograms using Primavera Project Planner.
Project Involved
Hydrogen plant-Hindustan Petroleum Limited, India stripper unit-Hindustan Petroleum Limited India. PSA nitrogen Plant –Mangalore Petrochemicals Limited Mangalore India.
Design Desk India Pvt Ltd., Chennai.
Apr 1993 to Jan 1996 As a Piping Engineer
Created Detailed plant Maintenance Exploded isometrics Drawing using AutoCAD Package.
Created General Arrangement Drawing, Piping Plan and Construction Isometric Drawing using Computer Aided Design and Drafting Software Like AutoCAD and ADL Pipe.
Responsible for creating 3D piping model from available 2D drawings. from the isometric drawing Automatically generated the material take off(MTO)
Produced the Detailed Project Planning Schedule with a detailed Work Break-Down Structure, Targets, and Intermediate Milestones and Monitoring Projects using Primavera Project Planner for various Projects.
Monitoring the Projects and Co-ordinate with various Departments and vendors for smooth running of the project.
Attended the Bi-Weekly and Monthly Meetings to discussed the delays and provided the solutions.
Prepared the Monthly Project Progress Reports Summarizing Progress for each month, and Work Areas with Delays and Solutions.
Prepared the following Reports for various Projects:-
Bar Chart
Activity List
Pure Logic Diagram (Critical-Path-Method Network)
Manpower Histograms
Manpower Curves
Cost Curves and S-Curves
Project Involved :-
Hydrogen plant –Hindustan petroleum Limited, India stripper unit-Hindustan Petroleum limited India
Narmada Dam Project, Sardar Sarvoar Panaraaswat Agency (SSPA)
Pune Municipal City Maps, Pune Municipal Corporation (PMC).
For Ref:-
1. Jostein Trodahl
Lead Project control (statoil)
Mail ID-- ***@*******.***
office ph No-+475*******
2.Vankat .Veeramani (Piping Engineer)
BW offshore Singapore.
Mobile ph no-+659326604
Personal Data
Nationality
Indian
Marital Status
Date of Birth
Married
06-08-1970
Passport Details
Passport No.Z2370012.Date of Expiry 02/02/2022 Date of Issue 03/02/20012,
E-Mail Address
**********@*****.**.**
Yours Truly,
S. Bakthashanmuganandam