Post Job Free
Sign in

Mining Engineer Production Manager

Location:
Pakistan
Posted:
June 02, 2022

Contact this candidate

Resume:

ENGR .WAQAR YOUNIS

Career

Objective

Keen to obtain a demanding position in a well-established company wherein I can utilize my skills, capabilities, education and experience thereby contributing to the company’s growth and achieving the acme of my career in the process. Detail-oriented professional Engineer with 5 years of experience and a zest for solving complex problems. Seeking to use proven project management and design skills to improve quality, cost and time metrics.

Preparation of strategies for activities.

Implementing safety protocols

Maintenance all asset investment plans and ensure compliance to capital expenditure

Evaluation of system capacity and analyze all production requirements and system deficiencies

Ensure accuracy for all operational requirements for projects and achieve all investment objectives

Provide support to all operations and extension requests along with Execution of environmental management processes such as chemicals and waste management and pollution prevention

Coordination with other engineering departments

Collection of periodic report updates and preparations of daily, weekly and monthly reports

Planning and implementing extraction systems and analyzing activities for internal and external departments

Develop a culture to anticipate and prevent health hazardous conditions.

Generate technical illustration

Preparation of study report and Deploy Automation and Controls Solutions Health, Safety and Environmental Management Systems program

Communication and coordination with suppliers

Supervise and manage the erection team during the executing of the projects under his control.

Follow-up management and technical supervision for the projects assigned to him

Issue the necessary programs of erection through the Construction

Manager for the approval during the installation phase of the project in co-ordination with the Planning Department and the Production for any technical matters arising during the installation phase of the project.

Keep at all times a close relationship with project's Main Contractor, Client and Consultant of the project for a proper coordination of the installation works.

Ensure effective operation of installation/construction procedures.

Keep update records and proper filing and Investigate incidents, determine root cause and develop corrective actions.

Handle safety assessments and deploy corrective measures to minimize hazard risk profile.

Manage reports and present summaries to management with suggested solutions.

Interpret legal requirements and standards by monitoring R&D projects

Design blast patterns using a variety of techniques for wall control and production blasting

Held bench meetings to discuss drilling and blasting of bench prior to a shovel mining in the area

Create variance report and Schedule variance and cost variance at various stages of the project to analyze deviation

Helped implemented a monitoring program for underground operations to minimize the impact to the underground working from surface blasting

Developed timing for the blast crew using seismograph and signatures holes to minimize damaging vibrations to the high wall

Provide daily and weekly report of drilling and blasting

Reduction of cost to blasting and drilling efforts by optimizing blast design

Activation of underground water tanks and sumps of underground mine

Mange logistics and mining operations along with providing Support to HSE inspections, audits and self-assessments.

Background of mining engineering and reclamation process DUTIES AND RESPONSIBILITIES :

PERMANENT VILLAGE ADRESS: Whatsapp : & Date CNIC: PASSPORT: POST Citizenship: DISTRICT of 14203-OFFICE Birth: +923********* EM6909843 03-KARAK 0962984-Pakistani SURATTI 01-1992 TEHSIL 9 KALLA TAKHT KPK E NASRATI **********@*****.***

Primavera P6 Orical 18.8

DelpatV9

(SURFACE AND

Familiar with the highest standards of Quality, Health, Safety and Environment Management Systems and actively take part in their improvement.

QHSE SYESTEM

CAREER EXPERIENCE

ORGANIZATION DESIGNATION PROJECTS DURATION LOCATION OF

PROJECT

BHP PROJECT

ENGINEER

SOUTH OLYMPIC DAM FEB 2018-JUNE 2021 SOUTH

AUSTRALIA

REDCO INTERNATIONAL TRADING AND

CONTRACTING WLL

PROJECT

MONITORING

ENGINEER

RED LINE ELEVATED METRO TRAIN PROJECT

Banana island

Green Line Precast Tunnel

Green line metro precast bridges and 2

stations

Lusail Road tunnel

New Doha port

national orbital highway Qatar

secondary navigation channel Doha

Rayyan international football stadium

OCT 2015-JAN 2018

DOHA

STATE OF

QATAR

EDUCATION & CERTIFICATION HISTORY:

B.S MINING ENGINEERING (SPECIALIZED in Tunnel & Geotechnical Engineering/precast erection,grouting, Quality Control & Epoxy Baluchistan Works/Nebosh Earthwork/IGC: University MINING(of information Surface technology and Underground engineering Blasting and management & Reclamation) Sciences Quetta (Registration No:F-10/133-BS) Nebosh international general certificate in occupational health and safety Nebosh international general certificate in construction health and safety Nebosh international general certificate in fire safety and risk management

(Master Log certificate No: IGC1/00468407/1070558)(GC3/00468407/1070366) SQA Diploma Ref:UE4804 of orical-p6

Rawalpindi DIPLOMA OF institute IT & COMPUTER of international HARDWARE Study and technical education Pakistan NATIONAL INSTITUTE OF DESIGN ANALYSIS PAKISTAN

Communication:

English(Advanced)

Urdu &Hindi (Advanced)

Pashto (Advanced)

Computer Software and Applications Skills

BIMS (Blast Information Management System)

Orica Blast Design System

shot plus (for open pit and underground system)

primavera Project management P6 18.8

MS Office

DelPat V9

BME Solution System

Eneax Blasting Solutions

Ref:

IMRAN RASHEED (production Manager Redco International) ***************@*****.***

M.CAN CELIKSIRT (GENRAL MANAGER DELPAT)

********@******.***.**



Contact this candidate