FRANKLIN CABA SEGARRA
DAKIT CAMBANG-UG TOLEDO CITY CEBU PHIL.
Mobile: +639-********* Email Add: adq8tt@r.postjobfree.com
Position Applying for: HVAC TECHNICIAN
Qualifications:
A technically professional worker excelling in Oil and Gas Refinery, and Facilities industry with over 12 years experience in Troubleshooting, Electrical, BMS control and operation,Installation of industrial hvac unit, Reading and interpret electrical diagrams, transmitter instrument checking, Overhauling Reciprocating Compressor, Mechanical maintenance and Commissioning job of HVAC with reciprocating, screw and centrifugal compressors of TRANE, CARRIER,CLIMAVETA chiller with a high pressure vessel ranging capacity of 300 up tons of refrigeration. Operating with microprocessor controller and associated cooling equipment such air handling unit, fan coil unit, cooling tower evry unit pressure control check and data log, and rotating equipment like chilled water and condenser water pumps. Supervised and handling KTI FLAKES ICE PLANT R22 ranging 35tons & 70tons with screw type compressors and HOERMANN FLAKES ICE PLANT MYCOM AMONIA TYPE ranging also 35tons & 70tons 8L 8 cylinder 6L 6cylinder with direct drive reciprocating compressor associated with cooling tower,
CERTEFIED PERMIT APLICANT AND A PERMIT HOLDER AND
AUTHOURIZE GAS TESTER under the authorization of (PDO) PETROLIUM DEVELOPMENT OF OMAN.
ONE OF SAFETY AWARDED PERSONEL IN (Q.G) QATAR GAS RAS LAFFAN PROJECT..
EMPLOYE OF THE MONTH IN PETROLIUM DEVELOPMENT OF OMAN SOUTH AREA..
Employment Objective:
A quick learner, adaptable to new techniques, procedures, equipment, and concepts, strong technical and supervisory skills to direct & assist staff for better performance, sincere, hardworking and a self - motivated professional with an excellent ability to perform under pressure. Extensive experience in resolution of complex problems related to air conditioner maintenance, HVAC systems and other complaint areas. Demonstrative excellence in resolution of complex technical problems in the related field. Zeal to learn and assimilate new concepts, technologies and keen to deliver desired results.
Language Speak: English, Arabic, Visayan, Tagalog
PROFESSIONAL EXPERIENCE :
COMPANY POSITION FROM-TO
CARILLION ALAWI LLC. HVAC TECHNICIAN JUNE 19, 2015 to DEC 19 2021
Petroleum Development Oman ( P.D.O ) P.O. BOX 1436 Ruwi Postal code 112, Sultanate of Oman Contact no: 968-***-****
SAUDI READY MIX REFRIGERATION TECHNICIAN 2009 -2013 Concrete Co. Ltd. K.S.A DAMMAM/JUBAIL Kingdom of Saudi Arabia
CCIC CONSOLIDATED ASST. ELECTRICIAN 2006-2009 CONTRACTOR INT’L. COMPANY
Qatar Gas Expansion Project II RAS LAFFAN
ALPINE ICE PLANT AND ELECTRICIAN 2003-2006
Igloo Export Processing Corp.
Mandaue City Cebu phils.
DUTIES AND RESPONSIBILITY:
CARILLION ALAWI LLC. HVAC TECHNICIAN June 19, 2015 to DEC. 19 2021
Petroleum Development Oman ( P.D.O )
P.O. BOX 1436 Ruwi Postal code 112, Sultanate of Oman
Contact no: 968-***-*****
Position: HVAC Technician
•Perform corrective repairs on HVAC / refrigeration and associated equipment, Complete preventative maintenance work on HVAC / refrigeration associated equipment.
•Install INDUSTRIAL AND COMMERCIAL REFRIGERATION SYSTEM AND COMISSIONING.
•Disassembled units, OVERHAULING RECEPROCATING COMPRESSOR CARRIER UNIT 30GTN,Repaired broken components and restored them to operation condition.
•Maintaining CARRIER AND TRANE UNIT RANGING 75 TONS 4 UNIT in every SUB STATION 132 KV SUPPLY FOR SWITCH GEAR, ELECTRICAL ROOM AND UPS BATERRY ROOM AND 2 UNITS OF CLIMAVETA RANGING 35 TONS FOR LABORATORY IN EACH SUB STATION.
•Knowledgeable of all operation in HVAC UNIT mention above and determine the faults and alarm in BMS control panel.
•Know the operation of BMS (BUILDING MONITORING SYSTEM
•Knowledgeable in CHARGING REFRIGERANT IN THE SYSTEM AND ALSO I KNOW HOW TO USE RECOVERY MACHINE TO RECOVERED REFRIGERANT IN THE SYSTEM ITSELF.
•REPLACING ANY TYPE OF REFRIGERANT COMPRESSORS.
•KNOW HOW TO USE ARC WELDING MACHINE AND BRAZING SUCH AS COPPER TO COPPER, ALUMINUM TO COPPER,STEEL TO COPPER BY USING BRAZING ROD AND BRAZING POWDER WITH OXEGEN AND ACYTELYN SET.
•Maintaining the accuracy of HVAC and Refrigeration PPM Procedure an give feedback management .
•Perform corrective and reactive works on HVAC/REFRIGERATION AND ASSOCIATED EQUIPEMENTS.
•Initiate measure to improve equipment performance method and quality of works.
•I’m a (PERMIT APLICANT) I Preparing A PERMIT FOR HIGH RISK JOB, and B PERMIT for normal work operation and Prepare documentation such us PTW, Job HSE Plan, TRIC card for the purpose of providing support and conveying information, Conduct short briefing TBT toolbox meeting of colleagues before to start the work for safety reason and proper planning of work schedule
•Repair, troubleshoot FCCU/AHU/FHU AND WATER CHILLED DX SPLIT UNIT AND Electrical and Mechanical Parts and Rectify faults..
•Examine the HEATING,REFRIGERATION AND AIRCONDITIONING SYSTEM FOR SIGN OF DEFECTIVE MALFUNCTION AND THEN RECTIFY THE FAULTS and Comply with the engineering standards and practice
•Respond to HVAC / refrigeration systems emergencies during off hours.
•Initiate measures to improve equipment performance, methods and quality of work.
•Coordinate with requesting department and other tradesmen for the purpose of completing project/ work orders efficiently.
•Maintain tools supplies and equipment to maintain constant, safe and operable condition.
•Analyze trouble shoot and modified program of Digital Control System if it is needed.
•Water pumps for chilled water troubleshoot and repair such as electrical and mechanical parts.
Saudi Ready Mix Concrete Co. LTD. (K.S.A.)
Ras AL Khair MAADEN PROJECT K.S.A
POSITION: REFRIGERATION TECHNICIAN
JOB DISCRIPTION
In charge in supervise the Plant Operation.
Install repair and troubleshoot (30GTN 180 Tons),unit Carrier Chiller.
Install repair and troubleshoot Trane Series R 180 Tons.
Glanding and terminate 150x70x4 core Armored cable for the supply of chillers.
Install water pumps 15HP 380V and the 6”PVC PIPE For water supply.
Install Hoer Man Flake Ice Plant 70 Tons Ammonia type, with 2 Ice Maker and Ice Blower for each Batching Plant.
Troubleshoot and repair Hoer Man ice plant.
Maintain and repairing faults of (KTI FLAKES ICE PLANT) 30Tons – 50 Tons – 70 Tons Touch Panel.
Troubleshoot and Overhauling (6L) 6 cylinders., (8L) 8cylinders MYCOM Ice Plant Compressor.
Diagnose Ice Plant Faults and Ice Cold Storage and Ice Blower.
Conduct Preventive Maintenance Every Weekend.
Learn the Operation of all ICE PLANT mention.
Familiarize of Pneumatic Function and Pneumatic Solenoid Valve and Jack.
Familiarize of Hydraulics Function and Hydraulic Solenoid Valve and Jack.
Check Up and cleaning the Cooling System.
Installing and Troubleshot Domestic, Commercial, and Industrial Air conditioning.
Maintain and repair faults in Ice Storage and Ice Blower system.
Install Ice Screw with Motor Driven by Gear Box.
Install plant Conveyor 2 types of conveyor. Radial Conveyor and Plane Conveyor.
Maintaining SICOMA twin shaft mixer 3 cubic meter.
Maintain C18 Caterpillar Generators and Perkins 2500 series 563.0kva 450.4kw 380v-220v Touch Panel Control
Maintaining SIEMEM twin shaft mixer 3.5 cubic meter.
Overhaul Champion Air Compressor with 4 cylinder
CCIC Consolidated Contractors Int’l. Company and Teysser Contracting Company W.L.L - J.V. Qatar Gas Expansion Project II Ras Laffan Qatar
POSITION: ASST. ELECTRICIAN
JOB DISCRIPTION
Diagram interpretation.
Knows how to interpret electrical details.
Meager checking insulation test of wire.
Glanding and termination high tension wire from Main Substation to the Branch for Transformer to Switch Gear.
Cable Pulling Control cable and Power cables.
Glanding and terminate for UPS cables.
Cad welding and Fix Electrical Earth Ground Brass Bar for ITR and Sub Station Building.
Glanding and terminate of Control Panel Board for ITR control Cables.
Making ferrols and cable tagging.
Fabricate offset of cable trays.
Fabricate a cable tray 90 degree elbow and 45 degree elbow punching type and a ladder type tray.
Install cables trays in ITR and Substation.
Install Fiber Glass ladder type cable tray in Cat Walk of Loading Berth Area.
Glanding and termination of control for the Loading Arms for the Ship.
Install and terminate PAGA and Smoke Detector.
Install RSC EMT pipe for electrical installation and smoke detector.
Fixing light fixture.
Glanding and terminate Smart Hook and Sodium Light outside the building and Loading Berth Area.
Install Stub Ups for Power Cables.
Commissioning.
Alpine Ice Plant and Igloo Export Processing Corp.
G.Ouano St. Brgy, Umapad Mandaue City Cebu City Phils.
POSITION: ELECTRICIAN
JOB DISCRIPTION
Glanding and termination generator to the Double Throw switch.
Glanding and termination Motor Controls, Compressors.
Termination of motor control, START STOP, STAR DELTA, and FORWARD REVERSE CONECTION.
Install cable trays such a (Ladder Type and Punching Type) 200mmx100mmx3m, 400mmx100mmx3m, 600x100mmx3m, 900mmx100mmx3m.
Fabricated cable tray (Ladder type and Punching Type) 90 degrees and 45 degree.
Trouble Shouting Industrial Motor Controls and diagnose the faults.
Install control for the Deep Wale water pump.
Lay outs for the installing of Cable Tray, Conduit Pipe, Switches, Outlet, Junction box, Lighting Fixtures, and Electrical Panel Board.
Installing convince Outlet 3gang 2gang, 3ways switch, 4 way switch, Junction Box, lighting fixtures, Electrical Panel Boards, Motor Controls Panel Board,
Installing Emergency light, Normal light, Sodium light.
Banking transformer.
Install CCTV Camera
Install Telephone and Data Outlet
Install intercom telephone.
OTHER RELATED FIELD OF EXPERIENCE AND SPECIALIZATION:
Oxygen and Acetylene Welding, G.I sheet, Copper to Copper, Aluminum to Aluminum, Aluminum to Copper and brass to steel
E&I Technician.
Electro pneumatic / hydraulic technician
Automotive elect. / mechanic technician
Refrigeration technician
Arc Welding
Plumber
Instrument Fitter
Finishing Carpenter/furniture
Driver
KINGDOM OF SAUDI ARABIA SEMINAR AND TRAINING ATTENDED
Safety behavior / PPE / ERC / emergency response.
Saudi Ready Mix Concrete Co. Ltd.
Jan 28 2011 Jubail K.S.A
LOTO Log Out Tag Out Procedure
Saudi Ready Mix Concrete Co. Ltd
March 13 2011 Ras Al Khair K.S.A
ICE and CHILLER PLANT SAFETY OPERATION
Saudi Ready Mix Concrete Co. Ltd. August 01 2011 Dammam K.S.A
KTI Plersch Katetechnik GbmH Operation & maintenance of KTI Colling Plants
November 08 2010 Riyad K.S.A
Confined Space Siminar
Qatar Gas II Project
Jan 16 2008 CCIC Ras Laffan Qatar
H2s Seminar
Qatar Gas II Project
December 03 2010 CCIC Ras Laffan Qatar
PETROLIUM OF DEVELOPMENT OF OMAN SIMINAR AND TRAINING ATTENDED
HSE = HEALT AND SAFETY ENVIRONMENT ORIENTATION June 21 2015 ( NTI GHALA MUSCAT OMAN)
H2s SEMINAR = HYDRO SULFIDE SEMINAR June 21 2015 to June 20 2018 ( NTI GHALA MUSCAT OMAN)
IFR E = INITIAL FIRE RESPONSE EMERGENCY June 22 2015 to June 21 2018 ( NTI GHALA MUSCAT OMAN)
A PTW S = APLICANT PERMIT TO WORK SEMINAR November12 2015 to October 8 2018 ( NTI MARMUL OMAN)
CMC = COACHING AND MENTORING COLLEAGUES SEMINAR September 31 2015 September 30 2019
( NTI MARMUL OMAN)
SLS = SAFETY LEADERSHIP FOR FRONTLINE SUPERVISOR SEMINAR. September 7 2015 September 8 2019 ( NTI MARMUL OMAN
EDUCATIONAL BACKGROUND:
COURSE SCHOOL YEAR
2 yrs Electrical Technology DASMC La Salle 2000-2003 Lutopan Toledo City Cebu Phil.
Industrial Electricity TESDA RUIB VII under (CIDA) Nov.12-Dec.04 2001
Canadian Int’l. Dev. Agency
1 yr (RAC) Refrigeration & CSCST Cebu State College of 2002-2003
Air conditioning Mechanics Science and Technology
Night Classes Mandaue City Cebu City Phils.
1yr Automotive Mechanics CSCST Cebu State College of 2004-2005
Night Classes Science and Technology
Mandaue City Cebu City Phils.
SECONDARY Consolatrix College 1999-2000
COURSE Poblacion Toledo City Cebu City
PRIMARY Malubog Elem. School 1990-1996
COURSE Malubog Toledo City
PERSONAL DATA:
Date of Birth June 12 1983
Place of Birth Toledo City, Cebu City
Philippines.
Height 5’6”
Weight 73 kg
Civil Status Married Spouse Glecelia C. Segarra
Citizenship Filipino
Religion Roman Catholic
Name of Mother Salpina C. Segarra
Occupation Housewife
Name of Father Francisco L. Segarra
Occupation Farmer
Passport # P849015A
Date of Issue AUG. 30, 2018
Date of Expired AUG. 29, 2028
CHARACTER REFERRENCE
Carlos Y. Casenas Saudi Ready Mix
Plant Equipment Manager Concrete Co. Ltd.
Bryant Gopioo Saudi Ready Mix
H.S.E. Instructor Concrete Co. Ltd.
Mark Robertson Saudi Ready Mix Factory Manager Concrete Co. Ltd.
Alexander Tan Chan Alpine Ice Plant and Cold
President/Owner Storage Corp. Mandaue
City Cebu Phils.
Nestor Villanueva CCIC Qatar Gas II Project
Site Electrical.engr. Ras Laffan Qatar.
Munner Albalushi CARILLION ALAWI LLC.
Ibrahim Al Sharji PETROLIUM DEVELOPMENT OF OMAN
Site Manager
I hereby certify that the above information’s are true and correct true the best of my knowledge and ability….
FRANKLIN C. SEGARRA