AROKIANATHAN ANILKUMAR C
Mobile No.: +919*********
Email : ************.*********@*****.***
OBJECTIVE
I am goal oriented with high degree of determinaton. Leads team from the front Build
team with excellent interpersonal skills. Self has been result oriented and task master. My current
objectve is achieving success in executng major project with cost efectve manner with high
quality and safety standards.
PROFESSIONAL SUMMARY
29 years of experience in Large Scale Infrastructure Projects like Metro Rail Underground and
Elevated structures. All types of Geo Structures of Pile Foundaton, Diaphragm wall, sheet
pile, worked in formaton and laying of Roads for Chennai Corporaton and Natonal
Highways.
Ability to work individually and as part of a team.
Good team player and believe in positve approach.
Ability to work in a creatve environment using cutng edge technology where I would
constantly learn and successfully deliver solutons to various
Well experienced to handle the project independently in internatonal level.
PROFESSIONAL EXPERIENCE
From 2019 to 2020 – Constructon Manager (Civil for Larsen & Toubro Hydrocarbon Engineering
Limited – MONO ETHYLENE GLYCOL (MEG PLANT AND ETHYLENE RECOVERY UNIT (ERU UNDER
LSTK -1 PACKAGE AT IOCL, PARADIP REFINERY – ODISHA
Scope of work – Constructon of Permanent of Permanent Roads, Constructon of Temporary
Constructon Facility for the above Project like Project ofce, Stores, Warehouse, Pipe Fabricatng
shops, Time ofce, Workmen Canteen, Workmen Rest shelters, Workmen Colony with all
amenites, Raw material & Stacking yard. Culverts, Permanent & Temporary Roads and Drains.
From 2016 to 2019 : Constructon Manager (Civil for all Infrastructure works at LARSEN &
TOUBRO HYDROCARBON ENIGINEERING LIMITED – MODULAR FABRICATION FACILITY LIMITED –
KATTUPALLI (THIRUVALLUR DT
Scope of work : Constructon of 2 nos Warehouse of siee 120 x 20 M,Storm water drain to a
Length of 3000 M, Strengthening of Permanent and Interior Roads to a Length of 5 KM, Yard
Development to a tune of 6 Lakh Square meter Using Boulders, WBM and Wet Mix Macadam,
Garden development & Maintenance to a tune of 2 Lakhs Square meter,
Constructon of Foundaton for Plate bending and cutng machine, Constructon of RT
Bunker, Workmen Accommodaton Block includes all amenites.
From April 2013 to June 2016:
Working in LARSEN & TOUBRO LTD., as CONSTRUCTION MANAGER.
Name of the Project: Contract UAA-04 Design and Constructon of Underground Staton at
Nehru Park Kilpauk Medical College, Pachaiappa’s College and Associated Tunnel’s for Chennai
Metro Rail Ltd., India.
Scope of Work: Constructon Underground Metro Rail statons, with works covers Diaphragm
walls, Roof, Concourse, Base Slab, King Posts, barrete pile, Trafc Diversions at diferent
stages of staton box constructon, utlity diversions planning, executon and liasoning with
Government departments/required environmental and forest department approval for Tree
cutng and disposal/Monitoring of required Tree plantatons for Tree felling. Steel Strutng
fabricaton and erecton and Instrument monitoring at diferent levels for diferent stages in
Botom Up/Top Down Staton Box constructon.
Work involves trafc diversion (3.8km, utlity diversion such us water mains, electrical 33kva,
110kva, 11kva, Telephone cable, OFC, BSNL, storm water line, sewer line, Diaphragm wall
2.5kmx25mx1m, instrumentaton, kingpost, strut fabricaton & erectons-3500t, excavaton –
5lacs, Dewatering, sheet illing, water proofing and civil works.
Roles and Responsibilites
1. Whole and sole responsible to construct tunnelling works in accordance with
approved drawings, specificaton and within stpulated tme frame.
2. Preparaton of method statements and obtain approval from consultant.
3. Task briefing about method of works to sub ordinates and sub contractors
4. Preparaton of works plan, schedule and resource.
5. Finalieaton of sub contractors.
6. Allocaton of man power and sub contractors.
7. Interfacing with neighbour contractors.
8. Coordinaton with consultant, clients, staton team, local authorites, design consultant
and procurement department.
9. Preparaton of internal leters and contractual leters to consultant and client.
10. Monitoring daily producton of work in terms of planned and ensuring safe working
practce at site.
11. Utlites and road diversion mapping, diversion plan and obtain approval from relevant
authorites.
12. Review the subcontractor bills and ensure tmely payments.
13. Heading the weekly review meetng with client and consultant and internal meetng.
From June 2012 to September 2013: Worked in LARSEN & TOUBRO Ltd.,
as Constructon Manager.
Name of the Project: DELHI METRO RAIL CORPORATION, CC17, Elevated Metro from Delhi
Cantonment to Mot Bagh.
Scope of Work: Work Involves Trafc Diversion, Excavaton, Pilling, Pile cap, Pier, Pier Cap,
Prestressing & Post stressing, Segmental type launching in between the live road locaton at
heart of Delhi.
Role and Responsibility:
1. Whole and sole responsible to construct tunnelling works in accordance
with approved drawings, specificaton and within stpulated tme frame.
2. Preparaton of method statements and obtain approval from consultant.
3. Task briefing about method of works to sub ordinates and sub-contractors
4. Preparaton of works plan, schedule and resource.
5. Finalieaton of sub contractors.
6. Allocaton of man power and sub contractors.
7. Interfacing with neighbour contractors.
8. Coordinaton with consultant, clients, staton team, local authorites, design
consultant and procurement department.
9. Preparaton of internal leters and contractual leters to consultant and client.
10. Monitoring daily producton of work in terms of planned and ensuring
safe working practce at site.
11. Utlites and road diversion mapping, diversion plan and obtain approval from
relevant authorites.
12. Review the subcontractor bills and ensure tmely payments.
13. Heading the weekly review meetng with client and consultant and
internal meetng.
From January 2010 to June 2012: Worked in LARSEN & TOUBRO Ltd., As Secton Incharge.
Name of the Project: Nasik Elevated Corridor Project.
Scope of Work: Work include Land Acquisiton, Preparaton of Trafc Management Plan,
Excavaton for open Foundaton, Pier, Pier cap & Launching of I-Grider, Roof Slab, RE & RC Wall
for PIMPALGOAN Flyover.
Role and Responsibility:
Preparaton of all method statement of setng approval from Employer and Employer
Representatve, Preparaton of Planning and overall executon of work.
From May 2009 to December 2009: Worked in LARSEN & TOUBRO Ltd., As Night work in charge.
Name of the Project: Design & Constructon of Saket under Ground Metro Staton (New Delhi
Scope of Work: Constructon of Underground Metro Rail staton, with works covers Diaphragm
walls, Roof, Concourse, Base Slab, King Posts, barrete pile, Trafc Diversions, Steel Strutng
fabricaton and erecton and Instrument monitoring at diferent levels for diferent stages in
Botom Up/Top Down Staton Box constructon.
Work involves trafc diversion (3.8km, utlity diversion such us water mains, electrical 33kva,
110kva, 11kva, Telephone cable, OFC, BSNL, storm water line, sewer line, Diaphragm wall
2.5kmx25mx1m, instrumentaton, kingpost, strut fabricaton & erectons-3500t, excavaton –
5lacs, Dewatering, sheet illing, water proofing and civil works.
Role and Responsibility: Preparaton of all method statement of setng approval from Employer
and Employer Representatve, Preparaton of Planning and overall executon of work.
From January 2008 to April 2009 : Worked in LARSEN & TOUBRO Ltd., as Assistant Engineer.
Name of the Project: Design and Constructon of Delhi Internatonal Airport Terminal –III.
Scope of Work: Work Involved formaton of Sub grade for PQC, Laying PQC for Aprons, Taxiway,
Relaying of Main Runway and Echo Taxiway using DBM & BC inside IGI Airport.
Role and Responsibility: Preparaton of all method statement of setng approval from Employer
and Employer Representatve, Preparaton of Planning and overall executon of work.
From May 2005 to December 2007: Worked in BALAJEE ROAD LAYERS Pvt.Ltd., as Site
Engineer.
Name of the Project: Road works for Natonal Highway & Chennai Corporatons.
Scope of Work: Formaton of Road, Laying of Road with DBM & BC for Roads belonging to
Natonal Highways, State Highways & Corporaton of Chennai.
Role and Responsibility: Preparaton Schedule of Rates and Partcipatng in Govt. Tenders
& Executon of work.
From May 1992 to May 2005 : Worked for Mr.S.Pandian, Civil Engineer & Contractor
as Site Engineer.
Name of the Project: Road works for Natonal Highway & Chennai Corporaton. Scope of Work:
Formaton of Road, Laying of Road with DBM & BC for Roads belonging to Natonal
Highways, State Highways & Corporaton of Chennai.
Role and Responsibility: Preparaton Schedule of Rates and Partcipatng in Govt. Tenders
& Executon of work.
Educatonal Qualifcaton
Diploma in Civil Engineering - St.Michael’s Polytechnic,Chennai
PROFESSIONAL TRAINING COURSES
Health, Safety & Environment – IOSH
Constructon Safety Procedures
Risk Assessment, Evacuaton Muck Drills, Tool Box talks, Safety Procedures & Ergonomics.
PERSONAL PROFILE:
Date of Birth : 28.10.1972
Place of Birth : Chennai, Tamil Nadu, India
Languages Known : English, Hindi, Tamil
Marital Status : Married & Two Kids
Hobbies / Interest : Reading & Sports
Natonality : Indian
Special qualites:
Worked on large scale of Civil Engineering projects worth over 2000Crore in value previously
worked on major tunnel works and heavy dense populated cites. Strong
Leadership, Communicaton skill and High level of organieaton. Be able to work
and communicate as part of a team
Exceptonal understanding of OH &S Policies
Ability to think and react quickly to any difcultes which may arise in the workplace.
DECLARATION:
I do hereby declare that partculars of informaton stated above true and complete to my
knowledge and belief.
Date: 30-May-21
Place: Chennai
C.AROKIANATHAN ANILKUMAR