Shiv Pratap Singh – DESIGN SPECIALIST

Contact number -626-***-****

A result oriented professional, Mr. Satyendra Singh about five (3) years of experience in Drafting and Design, DBoRs- CANRAD, CAD Link, RFNSA, MITS, RODS, Structure builder, Whisper, SH, MTX He is an expertise in DBOR- CANRAD, CAD Link and PD Acceptence.

His core competencies include:

Cell site design and drafting service

DBOR- CANRAD, CAD Link, RFNSA, MITS, RODS, Structure builder, Whisper, TRA

Skill Sets

Operating Systems : Windows 2000, Windows XP, Windows 98, Windows 7, Windows 10. Telstra databases : Cad Link, CANRAD, MITS, RODS, Whisper, SB & RFNSA

Drafting : AutoCAD

Other : MS Office 2007 and MS Access

Expertise : Installation, Commissioning and quality Audit.

Achievements

Associate of the month for SSMC project

Awarded most valuable performer bronze -team for excellent commitment towards PD DBoRs scope.

Achieved Associate of the Month (AOM) Award 5-times from CYIENT Ltd. For the excellent performance in projects.

Received “Mark of Excellence” award for the year 2014.

Achieved Team of the month (TOM) 20-times in spite of excellent support and dedication in project deliveries

Experience Summary

Heaving 3+ years’ Experience in telecom domain in the area of updating Telstra databases, Installation and Commissioning, Integration, Expansion, Swapping, Quality Audit (QA) of Huawei, ZTE, NSN & ERICSSON BTS & Transmission Equipment.

RF and RFI survey for BTS and MW.

Commissioning and integrating of BTS and Installation, commissioning & Alignment of the Microwave Link Equipment.

Alarm Patching of BTS Power Plant, and PIU on DDF and Show it to OMCR.

Quality Checking & reporting of installation completed site to customer.

Flexi packet radio link implementation and troubleshooting.

Responsible for Performance Acceptance Test (ATP) of new Sites.

Responsible for maintaining the DPR about the team movement, site material dispatching, material shorting, pending sites, work out etc. for Project.

Handling all project related work including BTS swapping, Revamp sites update, coordinate with transport team for site E1, coordinate with sub vender to achieve the target.

Updating the Telstra’s database CANRAD, RFNSA, Structure builder, Rods, Cadlink and whisper for the WCDMA850, WCDMA2100, LTE1800, LTE700, & LTE2600 technologies (Macro and IBC sites) based on the Telstra’s CANRAD Business Rule.

Performing PD acceptance task on behalf of Telstra for all the contractor’s sites.

Perform drive test using X-CAL and drive log analysis and reporting using X-CAP.

Perform RF planning using MapInfo, Atoll.

Monitor and Perform network optimization.

Representative Project Experience

Project # 1 Telstra (Australia)

Duration: 17/12/2020 – till date

As part of this project, he is responsible for:

Handling and preparing mobile cell site drawings (for construction and as built) based on site configuration, redlines/client standards and uploading them on to CAD link.

Pre-Construction:

Updating Canrad based on proposed site works (swapping of Antennas, Installation and configuration of new RUS and DUS cards in RBS6202,Feeders,tails, Combiners for L700 technology with WCDMA and LTE and connections)

Provide RFSR Report (Plumbing diagram) to installation team.

Check out drawings from Cad Link.

Provide Site drawings in PDF Post Construction

Update all serial number of Antennas, combiners etc in Canrad, Mits

Add LTE mobile technology and its mobile cells and SIU details from Transport data on to RODS

Upload photos on to RODS

Update Structure Builder with new power rack, Rectifiers and battery details if any changes done on site

Update MITS with RUS, DUS and other active radio elements

Verify all existing issue numbers at sheet level in Cad Link to update in newly created DC as on many occasions DC was not updated even though sheets were up issued on Lotus Notes.

Prepare As Built drawings based on proper redline mark-ups received from ND Team

Checking in amended AB drawings in to Cad Link after review and confirmation from Telstra ND team

Update all serial number of Antennas, combiners etc. in Canrad

Upload Post construction build photos and toggling Canrad to Existing

Add respective mobile technology and its mobile cells and SIU details from Transport data on to RODS

Updating all tasks of Whisper with data received from ND team PIMS, Sweeps,

1.1 Project: DBoRs

Customer: Telstra Australia

Duration: On-going

Description: Telstra Corporation Ltd. (known as Telstra) is an Australian telecommunications and media company which builds and operates telecommunications networks and markets voice, mobile, internet access, pay television and other entertainment products and services. Telstra is Australia's largest telecommunications company.

As part of this project, he is responsible for updating 7 databases.

CANRAD

The CANRAD application is used to manage Telstra's National radio network. The CANRAD application maintains Radio Network Records, and supports Radio Network Planning, Design and Maintenance. It contains the mobile site equipment (Antenna, Feeders, Junction devices, Transceivers, Shelter & Shelter & structure) details.

Updating the Telstra's CANRAD Database for the WCDMA850, WCDMA2100, LTE1800, LTE700 & LTE2600/NR2600 /NR3600 technologies based on the Telstra's CANRAD Business Rule.

Correcting/updating the existing site configurations if that has not been updated as per the latest Telstra standard.

Updating Canrad based on proposed site works (swapping of Antennas, Installation and configuration of new RUS and DUS cards in RBS6202, Feeders, tails, Combiners for L700 technology with WCDMA and LTE and connections).

CADlink

This database having the records of Mobile network site AutoCAD drawings, for each & every project’s updated

CAD files should be uploaded in CAD Link when it has been approved by Telstra.

Uploading construction and As Built drawings to the Lotus Notes (Telstra’s CAD Link Server) using the

Auto linker tool.

Checking the sheet & issue number and date variations in the drawings and modify the same as per the

Telstra and SSMC standards before uploading

Updating the other databases MITS, RODS, Whisper, Structure Builder & RFNSA after the site construction.

3. Project - MW Installation and commissioning

Customer: ERICSSON

Duration: Jun 2020 – Nov- 2021

As part of this project, he was responsible for:

RFI check in near end and far end besides ensuring the site permissions.

Material reception at both ends and checking as per packing list and intimate the customer in case of exigency.

Assembling and hoisting of MW antennas & radios on tower in both ends as per TND/RND.

Clamping and routing of if cables from Shelter to Antennae in both ends.

Grounding the antennas and RF cables at appropriate place.

Fixing Transmission rack if required in both ends.

Installation & commissioning of IDUs in shelters.

Alignment of MW antennas till we achieve required receive level.

Grounding, weather proofing and labelling all cables in both ends and Acceptance test.

4. Project Ericsson

Project : BTS Installation & Acceptance

Operator : IDEA

Location : Raipur (MP& CG)

Duration: Jun 2019 – Dec- 2020

Job Responsibilities;-

Ericsson RBS6202/6601 Installation.

Installation and Commissioning of Ericsson MW.

Installation and Commissioning and Alignment of Ericsson M/W.

Installation of Feeder, GSM Antenna, Microwave Antenna.

Monitoring and co-ordination of Integration/Acceptance Testing of new Ericsson 2G/3G/4G cell sites