Post Job Free
Sign in

Commissioning Engineer Chemical

Location:
Varna, Bulgaria
Posted:
May 10, 2022

Contact this candidate

Resume:

IVAN GEORGIEV ANZOV

Postal address: jk. “ Vl. Varnenchik “ bl. 406, entr. 18, fl. 2. ap. 51, Varna 9023, R. Bulgaria E – mail address: *********@*****.***

Telephone number: Mobile: +359-***-***-***

Education:

1976 – 1981 Higher Institute of Chemical Engineering – Sofia, Bulgaria Dipl. Chemical Engineer in Technology of Inorganic Substances Courses included: Higher Mathematics, Inorganic and Organic Chemistry, Processes and Apparatuses in Chemical Industry, Technology of Mineral Acids and Salts, Technology of Pigment Production, Principles of Chemical Technologies, Technology of Salt Production, Technology of the Mineral Fertilizers, Mineralogy and Crystallography, Machine Drawing, Mechanics, Principles of Safety, Economics and Management of the Industry, Preservation of the Environment, Synthesis of Ammonia.

1988 – 1991 Varna University of Economics – Varna, Bulgaria Postgraduate qualification in International Economics Relations Summer 1989 Course in International Economics Relations – Moscow, Russia Work / professional

Experience:

2019 – present. Robert Bosh Semiconductor Manufacturing Dresden GmbH Technical Manager

Responsible for coordinating of the flow of materials, parts, component and sub – assembly components (bolts, fasteners, composite beams, slabs, columns) recruited for construction.

Organize and supervise the construction assembly process. The execution of entire process follows strictly the project construction plan.

Monitor and control of the technical assembly team.

Familiarize technical assembly team with health and safety requirements and work related regulations (Incident and Injury Free, Initiative Fault free Start up, and Quarantine Management).

2016 – 2019 Self Employed

2013 – 2016 TECHNIP ITALY S.P.A., SICES POLSKA SP.ZO.O. HEAVY RESIDUE PROCESSING COMPLEX – LUKOIL NEFTOCHIM BURGAS Technical Manager

Responsible for purchasing and coordinating of the flow of materials, parts, component and sub - assembly component ( bolts, fasteners, composite beams, slabs, columns ) required for construction and assembly construction of Heavy Residue Processing Complex

/ HRPC / at LUKOIL Neftohim Burgas JSC ( PR 080 and РR 200 ). All components are purchased according to the project construction plan.

Organize and supervise the construction and assembly process of Heavy Residue Processing Complex / HRPC / at LUKOIL Neftohim Burgas JSC (PR 080 and РR 200). The execution of entire process follows strictly the project construction plan.

Monitoring and control of technical assembly team assigned with construction and assembly construction of Heavy Residue Processing Complex / HRPC / at LUKOIL Neftohim Burgas JSC (PR 080 and РR 200).

Familiarized technical assembly teams with health and safety requirement and work related regulations (Incident & Injury Free, Initiative Fault free Start up, and Quarantine Management).

Material Engineer

Organize and coordinate transportation and delivery of the required parts and components such as pipes, pipe spools, flanges and fittings and etc.

Supervise the receiving process of the delivered parts and components such as pipes, pipe spools, flanges and fittings.

Inspect received pipe spools so they match the provided isometric blueprints.

Create and maintain data base of received and stocked parts and components such as pipes, pipe spools, flanges and fittings. Most of the parts and components come from different suppliers, including local (Burgas and Varna) and foreign (Poland and Greece).

Coordinate and control of the unloading process. Pre Commissioning Engineer

Site monitoring in day – to - day of the ongoing of piping works to achieve completion according to the project blueprint. This includes monitoring of piping fabrication, installation, pipeline, apparatus, valves and etc.

Determine which connection ports of the pipe system to be used so the flushing procedure to be started.

Monitor and control the entire pipe flushing process.

Monitor the cleanliness of the pipe system during and after flushing process was executed.

To execute hydro test, pneumatic test, and nitrogen / helium leak test of piping system.

Prepare and maintain technical documentation of manipulations that have been done to the pipeline such as testing, piping flushing / blowing, piping retro – jetting / cleaning, piping drying & preservation, and piping reinstatement.

2010 – 2012 NAVALMARE - Srl – LA SPECIA – ITALY

Commissioning engineer on the gas platform – Kashagan project

Made pressure tests of the pipes for natural gas and glycol, the vessels working under pressure and the lifting equipments in accordance with the international regulations.

Prepared all documents after testing, according to the requirements of the international regulations.

Site monitoring in day - to - day of the ongoing of piping works to achieve completion according to project blueprint. This includes monitoring of piping fabrication, installation, pipeline apparatus, valves and etc.

Determine which connection ports of the pipe system to be used so the flushing procedure to be started.

Monitor and control the entire pipe flushing process.

Monitor the cleanliness of the pipe system during and after flushing process was executed.

To execute hydro test, pneumatic test, and nitrogen / helium leak test of piping system.

Prepare and maintain technical documentation of manipulations that have been done to the pipeline such as testing, piping flushing / blowing, piping retro – jetting / cleaning, piping drying & preservation, and piping reinstatement.

2009 - 2010 MALTA SHIPYARDS – MALTA

Supervisor – steel workers

Managed, organized and controlled the work of the shift of 25 steel workers. 2008 - 2009 SHIPYARD – HUELVA – SPAIN

Supervisor – pipe fitters

Managed, organized and controlled the work of the shift of 18 pipefitters. 2005 – 2007 GCCI – ABU KAMMASH, LIBYA

Shift Supervisor in Salt Plant

Realized total control of the technological regime.

Created optimum organization for the process of production. Maintained optimum parameters of the technological process. Organized the process of the high quality production.

Managed, organized and controlled the work of the technological and assistant personnel.

2002 – 2004 DECAPHOS – S.A., DEVNYA, BULGARIA

Process Engineer

Built and started up the plant.

Managed, organized and controlled the work of the technological and assistant personnel.

Managed, organized and controlled the technological processes.

Realized projects related to the workshop reconstruction, the environment and work safety.

Created optimum organization for the process of production. Maintained optimum parameters of the technological process. Organized the process of the high quality production.

Controlled the technical condition of the pipes for hot water, steam, oil and natural gas, the vessels working under pressure and the lifting equipments.

Made pressure tests of the pipes for hot water, steam, oil and natural gas, the vessels working under pressure and the lifting equipments in accordance with the regulations 15, 16, 28, 29, 30 and 31 (State Agency for Technical Surveillance).

Prepared all documents after testing, according to the requirements of the regulations 15, 16, 28, 29, 30 and 31 (State Agency for Technical Surveillance). 2000 – 2001 AGROPOLYCHIM – S.A., DEVNYA, BULGARIA

Shift Supervisor in the Synthesis of Ammonia - workshop

Managed, organized and controlled the work of the shift of 15 workers.

Maintained optimum parameters of the technological process. Organized the process of the high quality production.

Realized total control of the technological regime. 1999 – 2000 POWER STATION DEVNYA – S.A., DEVNYA, BULGARIA Inspector Technical Supervision

Controlled the technical condition of the pipes for hot water, steam and natural gas, the vessels working under pressure and the lifting equipments.

Made pressure tests of the pipes for hot water, steam, oil and natural gas, the vessels working under pressure and the lifting equipments in accordance with the regulations 15, 16, 28, 29, 30 and 31 (State Agency for Technical Surveillance).

Prepared all documents after testing, according to the requirements of the regulations 15, 16, 28, 29, 30 and 31 (State Agency for Technical Surveillance). SODA ASH PLANT / SOLVAY – SODI – S.A., DEVNYA, BULGARIA 1998 - 1999 Head of Shareholders Department ( Public Relations )

Prepared, organized and held the Annual General Meeting of the shareholders.

Maintained active relations with all shareholders of “ Solvay – Sodi “

Prepared all documents to the requirements the Bulgarian Trade Act.

Prepared all documents necessary for the listing of the company on the Bulgarian Stock Exchange – Sofia, according to the requirements of the Securities of the Stock Exchange Commission.

Prepared of the Agenda of the General Meeting.

Led and kept the book of shareholders. Issued temporary certificates.

Monitoring of prices and the daily volumes of the Stock. 1988 – 1998 Chief of Production of the raw bicarbonate /Absorption, Filtration, Carbonization and Distillation / workshop

Managed, organized and controlled the work of the technological, mechanical and assistant personnel.

Realized projects related to the workshop reconstruction, the environment and work safety.

Created optimum organization for the production process.

Maintained optimum parameters of the technological process. Organized the process of the high quality production.

1985 – 1988 Technologist of the workshop for quicklime, slake lime and CO2

Created optimum organization for the process of production. Maintained optimum parameters of the technological process. Organized the process of the high quality production.

Managed, organized and controlled the work of the technological and assisting personnel.

Finalized projects related to the workshop reconstruction, the environment and work safety. 1983 – 1985 Shift Supervisor in Production of the raw bicarbonate / Absorption Filtration, Carbonization and Distillation / workshop

Managed, organized and controlled the work of the shift of 36 workers.

Maintained optimum parameters of the technological process. Organized the process of the high quality production.

Realized total control of the technological regime. 1981 – 1983 Shift Supervisor in Calcination - workshop

Managed, organized and controlled the work of the shift of 27 workers.

Maintained optimum parameters of the technological process. Organized the process of the high quality production.

Realized total control of the technological regime. Language Skills: Native Bulgarian, fluent Russian, intermediate English Computer Skills: MS Office, Word, Excel, Internet

Other:

2011 Nominated for Membership in the American Chemical Society 1999 Certificate 60 - the requirements to the structure and safety exploitation of the lifting equipments. 1999 Certificate 65 - the structure and technical surveillance of the pipes for steam and hot wate



Contact this candidate