Post Job Free

Resume

Sign in

Construction Management, problem, solver

Location:
Tomball, TX
Posted:
May 09, 2022

Contact this candidate

Resume:

Steven Q. Peterson

***** **** ***** *******, ***** 77377 Home: 281-***-**** Cell: 713-***-**** adq0e7@r.postjobfree.com

CONSTRUCTION MANAGEMENT - resourceful, perceptive, project visualization, and problem solving

PRO F E S S I O N A L EXPERIENCE

QUALITY CONTROL and CLOSEOUT SPECIALIST

Burton Construction Houston, Texas 2016 - 2020

•Completed dozens of post-construction punchlists enabling nearly $10 million in retainages to be released

•Problem solver – identified, initiated, and achieved rectification of finish items faults, drainage issues, water leaks, and warranty issues,

•Achieved the re-working of ADA inspection infractions.

•Handled many through-the-cracks issues - many times using my labor and my tools

COMMERCIAL SUPERINTENDENT 2012-2015

Primetex Corporation The Woodlands, Texas

•Coordinated all onsite work efforts while maintaining the vast majority of the project management duties as well.

•Maintained close scrutiny on the structural steel submittals to ensure no-problem fits for erectors.

•Developed and implemented grading plans for concrete paving and slabs

•Initiated and documented ongoing communications with architect and structural engineer to improve and fine-tune the different structural and architectural aspects of the $7+ million Sun's Club remodel and ground-up project on FM 1960 in Houston, Tx

•Continued to hone my attention to details

FIELD SERVICE TECHNICIAN 2009 - 2012

Proximity Systems, Inc. Tomball, Texas

•Coordinated all installations of new work stations and the repairs and modifications of existing units in hospital, nationwide.

•Provided quality customer service while ensuring that the customer's issues were resolved within agreement

parameters.

•Coordinated and led on-site technical support including servicing and repair of existing units, parts replacement, and educating the IT and maintenance personnel to maximize the usage and lifespans of the work stations.

•Heightened my precision which elevated every facet of my skill set.

PROJECT MGR/ ESTIMATOR/ SUPERINTENDENT 1993-2006 I 2007- 2009

Q-Built Construction Tomball, Texas

o Constructed cell phone sites for the GTE Mobilnet, custom homes, whole-house remodels, tenant lease space

build-outs, several restaurants.

" Ground-up and remodeling for Budget Rent a Car, Ingersoll Rand, Dresser Rand, and 5-floor interior build-out for Ikon Document Services

•Maintained positive relationships with customers, architects, property managers, subcontractors, suppliers, and

inspectors

•Identified and solved jobsite problems, successfully completing projects and exceeding expectations.

SUPERINTENDENT 2006 - 2007

Tuscan Builders, LP Houston, Texas

•Orchestrated the construction of a $1.3 million ground-up Capital One Bank, completed in 130 days grossing a

$166,000 profit

•Completed the high-finish restaurant Raffa's Waterfront Grill in Kingwood, Texas on the waterfront in Kings Harbor

PROJECT MGR. / ESTIMATOR/ SUPERINTENDENT 1990 -1993 I 1983 -1988

Christian Brothers Construction, Inc. Tomball, Texas

•Built car return facility for Budget Rent a Car on the Gulf Fry, engineering all of the site drainage on 2-acre site

(1985)

•Completed extensive remodels for Budget Rent a Car at IAH and Hobby Airports

PROJECT MGR/ ESTIMATOR

Green's Concrete Contractors Houston, Texas

•1000 piers, miles of grade beams, acres of paving and slabs

SUPERINTENDENT

Mongold Construction Houston, Texas Constructed my first ground-up building

•Avis Rent a Car in downtown Houston, Louisiana @ Webster, a prototype building

SUPERINTENDENT

M/R Interiors Houston, Texas Built 8-floor Tl in 9 months totaling $2.2 million in 1981 dollars

•The Ashford 6 building

SUPERINTENDENT

Coburn Construction Cypress, Texas First learned to estimate commercial work

1988-1990

1982- 1983

1981- 1982

1980- 1981

•Transformed the old Guaranty Bond State Bank building into the administrative offices for Tomball ISO

ASSISTANT FIELD ENGINEER

H. A Lott Houston, Texas

•Learned layout, instrument usage, and detailed plan reading

1979- 1980

PURCHASING AGENT 1978 - 1979

Greenwood Corporation Houston, Texas In Champion Forest

FRAME and CORNICE SUBCONTRACTOR

NW Harris County, Tx In Champion Forest, Northampton, and Tomball

LICENSED REAL ESTATE AGENT:

Houston, Texas At age 21, First with Red Carpet Realtors, then Jim West & Co.

1975- 1978

1974- 1975

EDUCATION & CERTIFICATIONS

Completed 66 hours toward Construction Technology degree from University of Houston OSHA 30-hr

Steven Peterson, page 2 of 2

•Structural

Steven Q. Peterson

Strengths From Experiences

Framing subcontractor, framed and corniced a dozen homes 1977-1978

Reinforced concrete work, spotted, punched and placed nearly 1000 piers, dozens of slabs, acres of paving, tilt wall buildings, multiple tons of rebar

Cell sites - 1992

-Ring shaped foundations for above-ground fuel storage tanks -1989

-Scurlock Tower parking garage- 1979

•Ground-up

-Avis Rent a Car, Louisiana at Webster - 1982

Budget Rent a Car, Gulf Freeway at Monroe and Hobby Airport car return - 1985 & 1990 Capital One Bank, Dunvale at Westheimer - 2006

-Tomball Nursing Center dining area - 1997

3 Express Oil Changes, West Main Retail, Rilco Mfg, North Golden Sun plaza - 2012 - 2015

•Tenant Finish

-Ashford 6 Building, 8 stories, 3 tenants, $2.2 million in 1981 dollars,

completed in 9 months

Platinum Pools, new corporate offices and 5 satellite sales locations - 2008

Restaurants - Pho Hoa Noodle Soup, Ravello's, Spicy Panda, Locatelli's, Raffa's - 2004 - 2007 Built-out 5 floors of corporate offices for Ikon Document Services, at Walters Road - 1996-1999 Imagination Toys and Shoes at Vintage Park Shopping Center -·1999

Texas ENT in Tomball, Texas -2003

-many other individual lease spaces for Petereit Investments, Vista Management - 2003 - 2005 Elizabeth Anthony- a $750,000 remodel in the Houston Galleria area – 2015

-Two mid-rise medical/office buildings with OR’s in Spring Branch and Hedwig Village - 2020

•Field Engineering

Scurlock Tower parking garage, Houston, Texas - 1979 Exxon Chemical Company offices, Houston, Texas - 1980

Budget Rent a Car facility Gulf Freeway at Monroe, Houston, Texas -1985

Dresser-Rand shipping/receiving area with loading docks and truck wells - 1989

- West Main retail, Tomball, Tx - 2015

•Remodeling

Budget Rent a Car, Gulf Freeway, Hobby Airport, Bush IAH Airport -

Tomball ISD Administration offices -1980

-Tomball Nursing Center dining room add-on - 1997

Ingersoll-Rand, West Sam Houston Pkwy N., Lumpkin Road -1993 -1996 Dresser-Rand, Lumpkin Road repair center -1998

Elizabeth Anthony – 2015

Lark Technologies - 2000 - 2003

Commercial and Residential

•Residential

Personally built several custom homes ranging from $167,000 to $487,000

•Management

Superintendent for most of the projects listed above Project Manager for many of the projects listed above

•Estimating

-Worked on estimates for many of the projects listed above



Contact this candidate