Chris Erwin E. Lagbo
S E N I O R A R C H I T E C T
Email: ************@*****.***
Cell: 095*-*******
Add: 197 Manga st. Blk. 7 West Rembo Makati
Key Skills Knowledge in AutoCAD, and MEP/Architecture/LANDSCAPE/Structure Revit, MS- PROJECT, SKETCH-UP, NAVIS - WORKS
Preparing Documentation Records/weekly status
Work Summary
MICROSOURCING, Dec 11-2021 – JANUARY 14. 2022
CADD ARCHITECT
Examine and/or analyze the job requirements and job specifications to ensure that each job contract/s is/are not over expended and comply with client’s requirements;
Examine time sheet of each drafting staff to ensure accurate recording and work time allocation to individual jobs
Coordinating with State’s LEAD Architect on Australia regarding plan and give comments, QA/QC of project and working closely with other disciplines such as MEP, Interior Design and Structural to ensure a coordinated design MDCC, October 1, 2018 – Sept. 2020
SR BIM ARCHITECT
Manage the work flow for all staff involved and/or assigned to design, drafting works
Ensure that drafting jobs and drafting contracts complies with the specifications required for by the client.
Ensure that all job deadlines are met.
Ensure the efficient work performance of each personnel.
Examine and/or analyze the job requirements and job specifications to ensure that each job contract/s is/are not over expended and comply with client’s requirements;
Examine time sheet of each drafting staff to ensure accurate recording and work time allocation to individual jobs
Manage the CADD/BIM documentation process as well as project specifications, Calculations, plans and submittals for each project’s BIM Implementation Plan compliance;
Other Project’s Handled :
“The Monument” 31 Storey Condominium = LOT 3, Scout Madrinian, Barangay South Triangle, Q.C.
“Fred Siy Residence” = No. 38 Domingo st, Urdaneta Village Makati City
3 Storey Hotel Elizabeth = San Vicente, Palawan
VERANT, January 2016 – August 6, 2018
AR BIM LEAD (AS-BUILT)
Manage the BIM documentation process as well as project specifications, Calculations, plans and submittals for each project’s BIM Implementation Plan compliance; Coordinate with/support contractors and designers including MEP and Structural engineers; Conduct product and technology research related to BIM; Contributions to regional publications, lectures, teaching assignments; Participate in brainstorming; bring forward innovative, but pragmatic ideas, methods, and technology uses Perform BIM, QC/QA audits of BIM/CAD deliverable s submitted from various authors Co-author and implement strategic and tactical BIM/O and CAD management plans, standards, specifications, reports, and related documentation. Creating Program Management for the Directors and migrate to layman’s Flat form
Ensures high level of communications and fostering teamwork to assemble a work environment for different individuals representing multiple disciplines to achieve optimum BIM performance.
Performs related tasks.
Other Project’s Handled :
15 Storey Centro Sohar 5 Star Hotel (LWI) = Dubai
92 Storey Tower Malaysian MULIA = Malaysia
BMW Showroom = 30th St. BGC Taguig
MARITME Engineering Center (Under U.S. Embassy) = NAPOCOR Vill., Bagac Batan New World Hotel and Casino = Roxas Blvd. Manila
Integrated Architectural Services (I.A.S.) Nov., 2014 – January, 2016 Senior Architect
Manage the CADD/BIM documentation process as well as project specifications, Calculations, plans and submittals for each project’s BIM Implementation Plan compliance.
Coordinating with State’s LEAD Architect on Australia regarding plan and give comments, QA/QC of project and working closely with other disciplines such as MEP, Interior Design and Structural to ensure a coordinated design.
Close Coordination and performs changes, addition, and/or revisions as required by the Lead States and client requirements.
Prepares all documents for submittals, i.e. drawing list, transmittals, quality control evidences, binding and plotted drawings.
Project’s Handled :
CANTALA= Wilk st, Melbourne Australia
WATERLINE = Elizabeth st., Melbourne Australia
LITTLE BAY = Solarch st., Sydney Australia
BRIDGE LANE = Station Precinct, Sydney Australia Ridley & Co. Feb 2013 – Sep 2014
Record Architect
Preparing Architectural/Interior Drawing Designs and Details
Preparing Interior/Exterior 3D Modeling Perspective
Preparing Documentation Records
Inspection of Workshops Drawings and Engineering Specs
Coordination meeting with Project State’s Lead
Projects Handled :
THE QUARTER, KARRATHA = Perth Western Australia
15 Storey SOUTH POINT BLDG. = Brisbane Australia
C.T. Onglao Architects Aug. 1, 2011- Jan 10, 2013
Project Architect
Prepared Architectural/Interior Drawing and Details
Preparing Interior/Exterior 3D Modeling Perspective
Preparing Material Specs/ Material Boards
Inspection of Workshops Drawings and Engineering Specs
Coordination meeting with Engineers and Project Manager
Site Inspection and Coordination
Projects Handled:
JAZA _CAMBRIDGE RENOVATION = 11st. corner 32nd Ave., Forbes Park, Makati City
JAZA _CALATAGAN GUEST HOUSE = Calatagan Batangas
BGC-HOTEL BERLIN = 11st. corner 32nd Ave., The Fort Global City, Taguig City Ayala Hotel Inc.- COBALT HOTEL = Cagayan De Oro
Ayala Hotel Inc.-DALLAS HOTEL. = Davao City
Vision Architecture + Engineering Inc., Feb. 2008 – January 2011 Arch. Revit Designer
Preparing Architectural/Interior Drawing and Details
Preparing Interior/Exterior 3D Modeling Perspective
Coordination meeting with Engineers and Project Manager
Preparing Navis Works Management
Projects Handled :
SABANG HOTEL DEVELOPMENT = Sabang Baler, Quezon
PROPOSED STAR BUCKS = The Fort 5th Ave. Taguig City
Interior Fit-out ST. LUKES HOS. = The Fort 5th Ave. Taguig City
PROPOSED PAGO BAY RESORT = (Mixed Used Residential Resort Subdivision) Guam U.S.A.
SEGA ENTERTAINMENT CENTER= (34 Storey Recreational Center) Dubai, KSA Projects Highlights :
*In Collaboration with P.C. Architects (Patrick Cotter Architects) Unit 235, 11300 no. 5 Road Richmond B.C., Canada
RIVER DRIVE DEV. = 6 Flr. Mixed Used Res w/ Loft. River Drive, Surrey B.C
QUATTRO BUILDING-D = 4 Storey W/ Loft Mixed Used Res. 13728 108th Avenue Surrey B.C. ONYX RESIDENTIAL DEVELOPMENT = (26 Storey) Lot 3, 909 East Playa Del Norte, Tempe, Arizona LOW RISE RESIDENTIAL & COMMERCIAL BLDG. = 2957 Glen Drive, Coquitlam, B.C. ISLAND CEDDAR = 162-400 Haleiwa, Hawaii, U.S.A
DCI Architects April 2005- July 2007
Arch. Designer
Preparing Architectural/Interior Design Drawing and Details
Preparing Concept Boards/Drawings for Principal Architect
Preparing Exterior 3D Modeling Perspective
Coordination meeting with Engineers
Preparing Master Development Plan
Site Inspection and Coordination
Projects Handled :
McKinley Executive Villas PHASE 2 = Upper McKinley Road, Fort Bonifacio Taguig City
McKinley Tuscany = Upper McKinley Road, Fort Bonifacio Taguig City
CANYON WOODS PEAK = B1 L1 Canyon Woods Phase1 San Gregorio, Laurel Batangas
COMMERCIAL and RESIDENTIAL CONDO GILMORE TOWERS = Domingo St corner Gilmore st. Q.C.
CANYON WOODS FAIRWAY VILLAS = Marella Property Lot3-0-18B to F Canyon Woods
3B San Gabriel Laurel Batangas
CANYON COVE BEACH CLUB = Nasugbu, Batangas
Xavierville Model House Subdivision = L7E B31 Xavierville Subdv. Q.C.
FAIRWAYS AND BLUE WATER HOTEL = Boracay, Aklan
Canyon Woods Courtyard = Canyon Woods Residential Resort Phase 2, Laurel Batangas
THE RIDGE = Canyon woods Residential Resort Brgy San Gregorio, Laurel Batangas
Las Haciendas Casa Sonrisas = L1&L2 B3Cascada, Las Hacienda, Laurel Batangas
ZAMBOANGA DEL SUR HOSPITAL = Ipil st. Padpad Compound, Pagadian City,
Zamboanga Del Sur
LAS HACIENDAS CASCADA CAMPSITE = B8 L40 La Hacienda Cascada, Las Haciendas,
San Gabriel, Laurel Batangas
MADISON SOUTH CLUBHOUSE = Madison South, Fil-Invest Road, Brgy Batino Calamba, Laguna In Collaboration with the ACT (Associated Consultant Team) Based on KSA, written below are the Design Competition projects which have been design and Plan with the DCI Architects:
AL RHIYAD ENTERTAINMENT DEVELOPMENT=
(AMUSEMENT AND RECREATION) Al Rhiyad Kingdom of Saudi Arabia
AL KHOBAR HOTEL AND RESIDENTIAL LEISURE DEVELOPMENT=
(16 STOREY HOTELS and 2 STOREY APARTMENTS)Al Khobar Kingdom of Saudi Arabia Project Highlights on
PRIVATE PROJECTS
Mar 2020-Jul 2020
• SUNSET SHOPPING MALL
Riyadh, Saudi Arabia
DESIGN ARCHITECT
Preparing of 3D Modeling/Detail Drawing/Perspective
Preparing Architectural Flr. Plans and Details
Coordination Meeting with the Owner and Contractor
Site Supervision and Inspection/Preparing Estimates and Specs.
Preparing Interior Fit-out
Sep 2015-Mar 2016
• Hilo High School
Waianuenue Ave., Hilo Hawaii U.S.A.
PROJECT ARCHITECT
Preparing of 3D Modeling/Perspective
Preparing Architectural Flr. Plans and Details
Coordination Meeting with the Owner and Contractor
Site Supervision and Inspection/Preparing Estimates and Specs.
Preparing Interior Fit-out
• ATEBARA RETAIL BUILDING
717 Manono street, Hilo Hawaii U.S.A
Feb, 2010 – April 2010
• Renovation of DNATA Airline Office
4TH Flr. NAIA TERMINAL 1, Pasay City
Jul -Aug 2008 (In Collaboration with AL GHWANEM ARCHITECTURE) 22 STOREY OFFICE BLDG.,TASWEQAR TOWER
K.S.A. Al Khobar
Oct 2007- Jan 2008 (In Collaboration with (Studio Supremo in Hong Kong) 30 STOREY HOTEL RESTAURANT= Causeway Bay, Hong Kong RENOVATION OF 5 STOREY SUNG SUI MALL= Wanchai, Hong Kong April 4-Jul 2, 2007 * In Collaboration with A+D Design Studio: HANDS INTERIOR DESIGN LIMITED
18/F, 111 Leighton Rd., Causeway Bay, Hong Kong
VIP ZEN RESTAURANT @ SHOP 3033 VENETIAN HOTEL & CASINO MACAU
ABALONE RESTAURANT @ SHOP 3036 VENETIAN HOTEL & CASINO MACAU April 4-Jul 2, 2007 *In Collaboration with A+D Design: Km.23 Ortigas Ext., Cainta Rizal 1900 Phil.
PROPOSED EXPANSION OF DR. YANGA 5-STOREY HOSPITAL INC. P. Burgos st. Bucaue, Bulacan
Education
Eulogio “Amang” Rodriguez Institute of Science and Technology, Philippines (Manila) BACHELOR OF SCIENCE, ARCHITECTURE = 2003
Makati High School = 1996
Poblacion Makati