Post Job Free

Resume

Sign in

B.C Brgy

Location:
Quezon City, Philippines
Salary:
60000
Posted:
January 21, 2022

Contact this candidate

Resume:

Chris Erwin E. Lagbo

S E N I O R A R C H I T E C T

Email: adpzpg@r.postjobfree.com

Cell: 095*-*******

Add: 197 Manga st. Blk. 7 West Rembo Makati

Key Skills Knowledge in AutoCAD, and MEP/Architecture/LANDSCAPE/Structure Revit, MS- PROJECT, SKETCH-UP, NAVIS - WORKS

Preparing Documentation Records/weekly status

Work Summary

MICROSOURCING, Dec 11-2021 – JANUARY 14. 2022

CADD ARCHITECT

Examine and/or analyze the job requirements and job specifications to ensure that each job contract/s is/are not over expended and comply with client’s requirements;

Examine time sheet of each drafting staff to ensure accurate recording and work time allocation to individual jobs

Coordinating with State’s LEAD Architect on Australia regarding plan and give comments, QA/QC of project and working closely with other disciplines such as MEP, Interior Design and Structural to ensure a coordinated design MDCC, October 1, 2018 – Sept. 2020

SR BIM ARCHITECT

Manage the work flow for all staff involved and/or assigned to design, drafting works

Ensure that drafting jobs and drafting contracts complies with the specifications required for by the client.

Ensure that all job deadlines are met.

Ensure the efficient work performance of each personnel.

Examine and/or analyze the job requirements and job specifications to ensure that each job contract/s is/are not over expended and comply with client’s requirements;

Examine time sheet of each drafting staff to ensure accurate recording and work time allocation to individual jobs

Manage the CADD/BIM documentation process as well as project specifications, Calculations, plans and submittals for each project’s BIM Implementation Plan compliance;

Other Project’s Handled :

“The Monument” 31 Storey Condominium = LOT 3, Scout Madrinian, Barangay South Triangle, Q.C.

“Fred Siy Residence” = No. 38 Domingo st, Urdaneta Village Makati City

3 Storey Hotel Elizabeth = San Vicente, Palawan

VERANT, January 2016 – August 6, 2018

AR BIM LEAD (AS-BUILT)

Manage the BIM documentation process as well as project specifications, Calculations, plans and submittals for each project’s BIM Implementation Plan compliance; Coordinate with/support contractors and designers including MEP and Structural engineers; Conduct product and technology research related to BIM; Contributions to regional publications, lectures, teaching assignments; Participate in brainstorming; bring forward innovative, but pragmatic ideas, methods, and technology uses Perform BIM, QC/QA audits of BIM/CAD deliverable s submitted from various authors Co-author and implement strategic and tactical BIM/O and CAD management plans, standards, specifications, reports, and related documentation. Creating Program Management for the Directors and migrate to layman’s Flat form

Ensures high level of communications and fostering teamwork to assemble a work environment for different individuals representing multiple disciplines to achieve optimum BIM performance.

Performs related tasks.

Other Project’s Handled :

15 Storey Centro Sohar 5 Star Hotel (LWI) = Dubai

92 Storey Tower Malaysian MULIA = Malaysia

BMW Showroom = 30th St. BGC Taguig

MARITME Engineering Center (Under U.S. Embassy) = NAPOCOR Vill., Bagac Batan New World Hotel and Casino = Roxas Blvd. Manila

Integrated Architectural Services (I.A.S.) Nov., 2014 – January, 2016 Senior Architect

Manage the CADD/BIM documentation process as well as project specifications, Calculations, plans and submittals for each project’s BIM Implementation Plan compliance.

Coordinating with State’s LEAD Architect on Australia regarding plan and give comments, QA/QC of project and working closely with other disciplines such as MEP, Interior Design and Structural to ensure a coordinated design.

Close Coordination and performs changes, addition, and/or revisions as required by the Lead States and client requirements.

Prepares all documents for submittals, i.e. drawing list, transmittals, quality control evidences, binding and plotted drawings.

Project’s Handled :

CANTALA= Wilk st, Melbourne Australia

WATERLINE = Elizabeth st., Melbourne Australia

LITTLE BAY = Solarch st., Sydney Australia

BRIDGE LANE = Station Precinct, Sydney Australia Ridley & Co. Feb 2013 – Sep 2014

Record Architect

Preparing Architectural/Interior Drawing Designs and Details

Preparing Interior/Exterior 3D Modeling Perspective

Preparing Documentation Records

Inspection of Workshops Drawings and Engineering Specs

Coordination meeting with Project State’s Lead

Projects Handled :

THE QUARTER, KARRATHA = Perth Western Australia

15 Storey SOUTH POINT BLDG. = Brisbane Australia

C.T. Onglao Architects Aug. 1, 2011- Jan 10, 2013

Project Architect

Prepared Architectural/Interior Drawing and Details

Preparing Interior/Exterior 3D Modeling Perspective

Preparing Material Specs/ Material Boards

Inspection of Workshops Drawings and Engineering Specs

Coordination meeting with Engineers and Project Manager

Site Inspection and Coordination

Projects Handled:

JAZA _CAMBRIDGE RENOVATION = 11st. corner 32nd Ave., Forbes Park, Makati City

JAZA _CALATAGAN GUEST HOUSE = Calatagan Batangas

BGC-HOTEL BERLIN = 11st. corner 32nd Ave., The Fort Global City, Taguig City Ayala Hotel Inc.- COBALT HOTEL = Cagayan De Oro

Ayala Hotel Inc.-DALLAS HOTEL. = Davao City

Vision Architecture + Engineering Inc., Feb. 2008 – January 2011 Arch. Revit Designer

Preparing Architectural/Interior Drawing and Details

Preparing Interior/Exterior 3D Modeling Perspective

Coordination meeting with Engineers and Project Manager

Preparing Navis Works Management

Projects Handled :

SABANG HOTEL DEVELOPMENT = Sabang Baler, Quezon

PROPOSED STAR BUCKS = The Fort 5th Ave. Taguig City

Interior Fit-out ST. LUKES HOS. = The Fort 5th Ave. Taguig City

PROPOSED PAGO BAY RESORT = (Mixed Used Residential Resort Subdivision) Guam U.S.A.

SEGA ENTERTAINMENT CENTER= (34 Storey Recreational Center) Dubai, KSA Projects Highlights :

*In Collaboration with P.C. Architects (Patrick Cotter Architects) Unit 235, 11300 no. 5 Road Richmond B.C., Canada

RIVER DRIVE DEV. = 6 Flr. Mixed Used Res w/ Loft. River Drive, Surrey B.C

QUATTRO BUILDING-D = 4 Storey W/ Loft Mixed Used Res. 13728 108th Avenue Surrey B.C. ONYX RESIDENTIAL DEVELOPMENT = (26 Storey) Lot 3, 909 East Playa Del Norte, Tempe, Arizona LOW RISE RESIDENTIAL & COMMERCIAL BLDG. = 2957 Glen Drive, Coquitlam, B.C. ISLAND CEDDAR = 162-400 Haleiwa, Hawaii, U.S.A

DCI Architects April 2005- July 2007

Arch. Designer

Preparing Architectural/Interior Design Drawing and Details

Preparing Concept Boards/Drawings for Principal Architect

Preparing Exterior 3D Modeling Perspective

Coordination meeting with Engineers

Preparing Master Development Plan

Site Inspection and Coordination

Projects Handled :

McKinley Executive Villas PHASE 2 = Upper McKinley Road, Fort Bonifacio Taguig City

McKinley Tuscany = Upper McKinley Road, Fort Bonifacio Taguig City

CANYON WOODS PEAK = B1 L1 Canyon Woods Phase1 San Gregorio, Laurel Batangas

COMMERCIAL and RESIDENTIAL CONDO GILMORE TOWERS = Domingo St corner Gilmore st. Q.C.

CANYON WOODS FAIRWAY VILLAS = Marella Property Lot3-0-18B to F Canyon Woods

3B San Gabriel Laurel Batangas

CANYON COVE BEACH CLUB = Nasugbu, Batangas

Xavierville Model House Subdivision = L7E B31 Xavierville Subdv. Q.C.

FAIRWAYS AND BLUE WATER HOTEL = Boracay, Aklan

Canyon Woods Courtyard = Canyon Woods Residential Resort Phase 2, Laurel Batangas

THE RIDGE = Canyon woods Residential Resort Brgy San Gregorio, Laurel Batangas

Las Haciendas Casa Sonrisas = L1&L2 B3Cascada, Las Hacienda, Laurel Batangas

ZAMBOANGA DEL SUR HOSPITAL = Ipil st. Padpad Compound, Pagadian City,

Zamboanga Del Sur

LAS HACIENDAS CASCADA CAMPSITE = B8 L40 La Hacienda Cascada, Las Haciendas,

San Gabriel, Laurel Batangas

MADISON SOUTH CLUBHOUSE = Madison South, Fil-Invest Road, Brgy Batino Calamba, Laguna In Collaboration with the ACT (Associated Consultant Team) Based on KSA, written below are the Design Competition projects which have been design and Plan with the DCI Architects:

AL RHIYAD ENTERTAINMENT DEVELOPMENT=

(AMUSEMENT AND RECREATION) Al Rhiyad Kingdom of Saudi Arabia

AL KHOBAR HOTEL AND RESIDENTIAL LEISURE DEVELOPMENT=

(16 STOREY HOTELS and 2 STOREY APARTMENTS)Al Khobar Kingdom of Saudi Arabia Project Highlights on

PRIVATE PROJECTS

Mar 2020-Jul 2020

• SUNSET SHOPPING MALL

Riyadh, Saudi Arabia

DESIGN ARCHITECT

Preparing of 3D Modeling/Detail Drawing/Perspective

Preparing Architectural Flr. Plans and Details

Coordination Meeting with the Owner and Contractor

Site Supervision and Inspection/Preparing Estimates and Specs.

Preparing Interior Fit-out

Sep 2015-Mar 2016

• Hilo High School

Waianuenue Ave., Hilo Hawaii U.S.A.

PROJECT ARCHITECT

Preparing of 3D Modeling/Perspective

Preparing Architectural Flr. Plans and Details

Coordination Meeting with the Owner and Contractor

Site Supervision and Inspection/Preparing Estimates and Specs.

Preparing Interior Fit-out

• ATEBARA RETAIL BUILDING

717 Manono street, Hilo Hawaii U.S.A

Feb, 2010 – April 2010

• Renovation of DNATA Airline Office

4TH Flr. NAIA TERMINAL 1, Pasay City

Jul -Aug 2008 (In Collaboration with AL GHWANEM ARCHITECTURE) 22 STOREY OFFICE BLDG.,TASWEQAR TOWER

K.S.A. Al Khobar

Oct 2007- Jan 2008 (In Collaboration with (Studio Supremo in Hong Kong) 30 STOREY HOTEL RESTAURANT= Causeway Bay, Hong Kong RENOVATION OF 5 STOREY SUNG SUI MALL= Wanchai, Hong Kong April 4-Jul 2, 2007 * In Collaboration with A+D Design Studio: HANDS INTERIOR DESIGN LIMITED

18/F, 111 Leighton Rd., Causeway Bay, Hong Kong

VIP ZEN RESTAURANT @ SHOP 3033 VENETIAN HOTEL & CASINO MACAU

ABALONE RESTAURANT @ SHOP 3036 VENETIAN HOTEL & CASINO MACAU April 4-Jul 2, 2007 *In Collaboration with A+D Design: Km.23 Ortigas Ext., Cainta Rizal 1900 Phil.

PROPOSED EXPANSION OF DR. YANGA 5-STOREY HOSPITAL INC. P. Burgos st. Bucaue, Bulacan

Education

Eulogio “Amang” Rodriguez Institute of Science and Technology, Philippines (Manila) BACHELOR OF SCIENCE, ARCHITECTURE = 2003

Makati High School = 1996

Poblacion Makati



Contact this candidate