Resume
Name Myra Wagan Morales
Position Sought Quantity Surveyor
Status
Filipino, Married
Qualifications
Jul 15, 2011 – Certified Quantity Surveyor
Zabeel International Institute of Management & Technology, UAE 2010 – 2011 – Masters in Geomatics Engineering (Undergraduate) University of the Philippines, Diliman, Quezon City Sep 28, 2005 – Sep 29, 2005 – Passed the PRC Licensure for Geodetic Engineers
Currently Resides
UAE
Availability
Immediately
Salary
Negotiable
E-mail/Contact No.
adpzfg@r.postjobfree.com/+971*********
EMPLOYMENT HISTORY:
Arab Engineering Bureau (Consulting Firm), Qatar
Mar 7, 2021 – Present
Duties & Responsibilities:
Pre-Contract Stage:
- Carried out quantity take off of Architectural, Structural, Interior Design and Electromechanical Works for residential, commercial, mixed-use, hospitality and industrial projects from 2D drawings with measurement software/CAD based software (BIM) and preparation of Bill of Quantities.
- Responding to tender queries.
- Cost Estimation.
- Liaise with QS Department Head for pre contract QS works.
- Liaise with designers in drawing issues and revisions. New Vision Construction Qatar
Aug 15, 2020 – Mar 6, 2021
Quantity Surveyor
Duties & Responsibilities:
- Reviewing construction plans and preparing quantity requirements.
- Identify and calculate all variations and prepare variation reports for management.
- Review and confirm all subcontractor invoices and payment requests and forward them to the Technical Manager for final approval.
- Preparation/reviewing of bills of quantities, rate analysis and other commercial activities for the projects.
- Liaise with design manager in drawing issues and revisions. Fujita Corporation Qatar
Oct 1, 2015 – Jul 18, 2018
Quantity Surveyor
Project: Doha Metro Phase 1- Systems, Rolling Stock, Track Work, Depot and Maintenance Duties & Responsibilities:
Pre & Post Contract Stage:
- Report to Commercial Manager and Project Management as required.
- Dealing with Construction Team, Design Team and Subcontractors.
- Valuing completed work and arranging payments for Design, Civil and Building Works, and other Services – Consultant, Technical and Labour.
- Assisting Commercial Manager in preparing other documents like Technical Service Agreement, Letters and Claims as per instruction and advice.
- Assisting Senior QS in Client matters; payment, financial report (internal), change order and other estimates as per instruction and advice.
- Prepare the BOQ’s from architectural, structural, and M.E.P drawings and estimate the project cost. Bouygues Construction Qatar (Sep 1, 2013 – Sep 30, 2015) Bouygues Batiment International, Dubai Branch (Jul 8, 2012 – Aug 31, 2013) Quantity Surveyor
Projects:
- Kingdom of Saudi Arabia Villa
- Project Khaznah Dubai
- Parking Air R+1
- Msheireb Properties Qatar
- Heritage Lagos Nigeria
- Sharjah Parking Tower
- Dubai-Hotel 1
- The Avenues 2 Dubai
- Lusail Villas Qatar
- Qatar Cool-District Cooling Plant 3
- Westin Hotel & Resorts DCC, UAE
- Qatar Petroleum Fit Out Package 1 & 2
- Four Seasons 5 Star Hotel, KSA
Duties & Responsibilities:
Pre-Tender Stage:
- Preparation of BOQ’s as per POM(I).
- Attending pre-tender meetings.
- Brief knowledge on FIDIC.
- Basic quantity carrying out methodologies.
- Carrying out detailed quantifications as per POM(I) Principles of Measurements (International Standards).
- Setting out Computer aided Quantification works using spread sheets.
- Raising Tender Queries to the consultants.
- Identifying various potential subcontractors and floating enquiries and preparing relevant Subcontractor Packages.
Trojan General Contracting LLC, UAE
Aug 2, 2011 – Feb 2, 2012
Quantity Surveyor
Projects:
- Morocco Housing
- Command of Military Works
- Najmat Water Villas
- Al Aryam Villa
- Vocational Education Development Centre
- Sheik Zayed Bin Sultan Al Nahyan Mosque
- Iconic Greenhouse
- Abu Dhabi Centre for Technical and Vocational Education Training Centre
- Al Ajban Poultry Company
- Sweihan Airbase
- Baynunah Academic Complex
Duties & Responsibilities:
- Working as a part of busy team handled tender.
- Assist Senior Estimator / Commercial Manager in preparing a reliable project for tender purposes.
- Review proposal specifications and drawings.
- Prepare estimates by calculating complete takeoff of scope of work.
- Preparation of Bills of Quantities for budgetary proposal.
- Identifying various potential subcontractors and floating enquiries and preparing relevant Subcontractor Packages.
- Follow-up with various subcontractors interested in getting involved in the project and obtaining proper quotations.
- Evaluation of all the subcontractors and suggesting good subcontractor for pricing. Japanese-Turkish Metro Joint Venture Obayashi UAE
Dec 26, 2007 – Nov 19, 2009
Survey Engineer / Data Processor
Duties & Responsibilities:
- Perform complex mathematical calculations in setting out construction surveys.
- Monitor survey and benchmark controls.
- Resolves field problems.
- Checking of as-built data.
- Review and checking construction drawings and documents before giving setting-out points at the site.
- Supervises construction Drafting Technicians in the preparation of record drawings and final quantities for construction works projects.
- Supervises administrative, professional, and technical employees involved in conducting construction surveys.
- Directs, reviews, and certifies construction surveys completed by Designer.
- Responsible for the processing of field data and checking of charts.
- Check survey data received from the field for completeness and quality.
- Responsible for correct processing of survey data as per client requirements.
- Carry out check computations using raw and processed data.
- Performs daily backup of field collected data and transmits same to the central office.
- Planning daily field operations and other tasks/activities of the crew. Capital Surveys
Apr 2007 – Oct 2007
Project: Dubai Metro Project
EEI Corporation Philippines
Oct 10, 2005 – Nov 21, 2006
Land Surveyor
Projects:
Light Rail Transit Line1 Capacity Expansion Project Duties & Responsibilities:
- Checking Structural plan versus Architectural plan.
- Lay-out and taking elevation of the lean concrete, column, beam, pedestal, anchor bolts, platforms, steel bars and formworks.
- Supervising the excavation and backfill.
- Locate, measure, compute, and evaluate tolerances for as-builts, layouts, and the alignment. Erection of Skyway Interchange for Ninoy Aquino International Airport- III Duties & Responsibilities:
- Established all survey lay-out and data checking for sub-structures and super structures setting-out
(i.e., includes bored piles, pile cap’s location and elevation, column/column heads, horizontal and vertical alignments, plinths/ shear keys position, pre-casted box girder position and parapet location and elevation).
- Coordinates with all field survey executions for the review of detailed engineering design and contract drawings including field survey data gathering and setting.
- Prepares survey method statements and technical reports.
- Evaluates and assesses sub-contractors progress of work.
- Reports directly to the Construction Manager.
On-the-Job Training (OJT) for Surveyor
Duties & Responsibilities:
- Design construction layout for clearing, excavation, backfilling, foundations, structures, buildings, mechanical and electrical installations, roads, railroads, fences, and underground utilities/facilities.
- Prepares cross-sections & profiles, and calculation of earthworks. SKILLS AND COMPETENCIES:
Strengths:
- Hard work nature, organized, dedicated, and can work under pressure.
- Methodical way of thinking.
- Good knowledge of construction.
- Excellent problem-solving skills.
- Good financial and numeracy management skills.
- Able to communicate and negotiating skills.
- The ability to absorb complex information and assess requirements readily.
- Computer literate.
Achievement:
- Included in the Top 10% of the Graduates of A.Y. 2004-05 Department of Geodetic Engineering University of the Philippines Diliman, Quezon City Department of Science and Technology Scholar 1997
Top 4 President Elpidio Quirino Scholar 1997
Skills:
- MicroSurvey Star*Net Least Squares Adjustment, TCLEV
- AutoCAD, On-Screen Takeoff, Bluebeam PDF
- Microsoft Office Applications (Word, Excel, PowerPoint)
- ArcGIS 9.3 (Geographic Information System)
- Candy Construction Computer Software (CCS) - Training Course
- BIM (Cad Measure)