JOB OBJECTIVE:

Seeking middle level assignments in Project Execution & installation Testing & Commissioning (and maintenance) Of HVAC, Electricals, fire fighting System and plumbing with an organization of high repute.

Profile Summary :

A dynamic professional with over 11+ years of experience in the areas HVAC, Electrical, fire fighting & plumbing work, like MEP work.

MEP Project Execution, Engineering & Management Hospital, Hotel, Factories, Warehouses, High rise and Residential buildings

Project Coordination Site Management Installation, Testing & Commissioning, Operations & Maintenance Designing Liaison Work

Project reporting, site Co-ordinate, client meeting and team supervision

Installation of chiller, Primary & Secondary Centrifugal Pumps, Fan coil Unit (FCU), Air Handling Unit (AHU), Treated Fresh Air Units (TFA)

Maintenance work of HVAC plant as like chiller maintenance work, all type turbo shooting of chiller like gas charging, oil charging, plc, all type of chiller electrical turbo shooting

Maintenance both chiller, water cooled chiller and air cooled chiller

Maintenance both chiller, mechanical and electrical, low voltage work of chiller.

Installation, testing and commissioning of VRV, Duct able and Split ac etc

Adept in handling multi -discipline contracts involving Mechanical, Electrical and Fire Fighting Commissioning Jobs.

Inspections, progress monitoring, site management and manpower planning

Proficient in handling site operations and accountable for quality service & timely completion of projects.

Adept at carrying out various tests & inspections for various processes and checking the quality

Breakdown/downtime & enhancing operational effectiveness of equipment Exposure in Piping Erection, Duct Installation

Familiar with executing projects involving HVAC Systems, CCTV, DG Set, Electrical Panels, Street light pole &Electrical Transformer, installation of D.B connection,testing, commissioning.

Installation of CCTV, laying communication cable of CCTV cable, DVR, testing & commissioning of CCTV system

Handel electrical work as internal wiring, external electrical work, substation, installation of DB, connection and distribution or connection.

Laying electrical cable and installation of electrical panel and connection of panel, distribution of three phase supply as per require at site.

Laying electrical cable and testing of HT and LT cable.

Installation, testing and commissioning fire fighting system as hydra, branch line of sprinkler, hydrant valve, cabinet of fire shaft, pressure valve, foot valve, gate vale, non return valve, butterfly valve and pump house of fire fighting.

Installation testing commissioning of sprinkler as per requirement as like drawing.

.

Installation, alignment, testing and commissioning of fire main pump, jockey pump, diesel engine pump

Testing of fire pipe line as per client requirement.

Installation, testing and commissioning of fire fighting, pipe line.

CORE COMPETENCIES

HVAC System installation, Testing, commissioning& Maintenance

External Electrical installation, Testing, commissioning &Maintenance

Internal electrical installation, Testing, commissioning &Maintenance

CCTV system installation, Testing, commissioning &Maintenance

Fire Fighting installation, Testing, commissioning &Maintenance

BMS of HVAC installation

ORGANISATIONAL EXPERIENCE

Total Experience 11+ years

From Feb’ 2014 to till now GSJ ENVO Ltd. Hemkunt colony New Delhi .

Company Profile & Details: Engineers and Environmental Consultants & Have a turnover of around 90 Cores per year.

Designation: project Engineer

Current running Project Details:

: Renovation & Maintenances of Manicktala ESIC Hospital Kolkata& PG COLLEGE Under Engineering Project India Ltd. Project value 63 Crore (500 Bedded Hospital).

Here I have to look up through the commissioning testing 1260 TR Chiller Plant for central Air-conditioning System of the Hospital as like chiller pipe line, all vale installation AHU installation TFA, HRV, Cassette unit wall mounted, ducting, insulation, ventilation system, etc.

Also I have to go through the Internal & External Electrical work like as hospital Building Wiring, DG, Transformer, LT & HT Panel Breaker Panel, cabling. Building Fire fighting system as sprinkler pipe line, hydrant pipe line and pump house etc.

Also have brief knowledge about MODULAR INDIAN OPERATION THEATRE(Stainless Still O.T), MODULAR IMPORTED OT &Medical Gas Pipe Line& GAS Manifold System Anesthetic Gas Scavenging Systems (AGSS)

I am gathering knowledge about Building Management system which is Presently Executing in that Hospital

From sept 2011 to Jan 2014, I. N. Beam engineer Pvt. Ltd.

PEARL HOTEL CHANDIGHAR ZIRAKPUR &SEC 104 MOHALI PROJECT

Role:

Project Coordination Site Management Operations, Maintenance Installation & Commissioning, Installation of chiller plant, chiller water pipe line, Air handling unit (AHU),Treated fresh air units(TFA), Hydraulic cassette unit wall mounted type instillation & Heat ventilation system installation

Responsible for Executing External electrical work at site like L.T. Panel installation & commissioning, Distributions and Control Panel, DDC Panel, Star Delta Starter, Doll Starter& Panel Connection

Preparing monthly or weekly project status reports and change orders for smoothly running work at site.

From August 2009 to Sept 2011, Rhythm Aircon

GANGA RAM HOSPITAL & PRIMES HOSPITAL DELHI

Role:

Site Management system, Installation, testing & Commissioning, maintenance.

HVAC Plant, chiller water pipe line, Air handling unit (AHU), fan coil units (FCU), Treated fresh air units(TFA), Hydraulic cassette unit, Hydraulic wall mounted Unites, Cooling Tower, Heat &Ventilation system.

EDUCATION

2009 B. Tech in Mechanical Engineering, from College of Engineering & Technology Moradabad, affiliated to Uttar Pradesh Technical University (UPTU), India.

2003 High School from U.P. Board.

2005 Intermediate from U.P. Board.

IT Skills

Auto Cad & CATIA

MS Office, MS Excel, and Internet Applications

Training Project

Pedal control washing machine

I worked on project pedal control washing machine in final year & team leader of project team.

Hard worked on project and large knowledge gain about project operation.

Having full knowledge about pedal control washing machine project.

Personal Information

Date of Birth : 15th June 1989

Father’s Name : Ali Abbas

Marital Status : married

Nationality : Indian

Sex : Male

Passport No . : U 1582104

Personality Profile : Diligent & Energetic. a person with good communication skills, team worker and a keen learner, with a desire to excel in life.

Date:

Place: (Shajar Abbas)



Contact this candidate