Cover Letter
Respected Sir/Madam,
oProfessional career as CIVIL/STRUCTURAL DESIGNER with 10 years with GCC Experience.
oExperience works on detailed drafting and 3D modelling activity of complete Refinery, Oil & Gas structures such as Pipe Rack, Pipe support, Platforms, Topside and Jackets etc.
oSoftware Proficiency: SM3D(SmartMarine 3D) For Offshore, SP3D,PDMS,MICROSTATION,AUTOCAD, SMART SKETCH
I'm seeking a challenging and rewarding work relationship where my abilities and potentials can be fully and effectively utilized. I will surely take the job with a great sense of responsibility and enjoy the challenge of new situations and expect to make a positive contribution.
DECLARATION
I hereby conform to the best of my knowledge for having furnished the genuine Details above
I can be reached anytime via email at adpytu@r.postjobfree.com or my cell phone, +91-988*******.
Thank you for your time and consideration. I look forward to speaking with you about this employment opportunity.
Sincerely,
N.Ramesh Sagar.
Curriculum vitae
Ramesh Sagar.N
Cell: +91-988*******
E-Mail: adpytu@r.postjobfree.com
oProfessional career as CIVIL/STRUCTURAL DESIGNER with 9 year s
oExperience works on detailed drafting and 3D modelling activity of complete Refinery, Oil & Gas structures such as Pipe Rack, Pipe support, Platforms, etc.3d model of inside cable trey support and foundation & pipe sleepers & pipe supports.
KEY SKILLS
oSM3D(SmartMarine 3D) For Offshore
oSmart Plant 3D And Smart sketch 2D (Ver 2011 R1 And 2014 R1 )
oPDMS Design (Ver 11.5,11.6 SP4,12.0 SP6.9)
oMicro station Ver 8.
oAutoCAD all versions.
oNavisworks Freedom 2017
oSmart Plant Review (SPR)
oMicrosoft Office XP: MS word, Excel, Access Power point
WORK EXPERIANCE
Projects Involved: J Ray Mcdermott Engineering Services Pvt. Ltd.(Chennai)
Project : Marjan package 1 Project
Client : Saudi Arabian Oil Company
Designation : Structural Designer
Duration : July 2019 to March 2021.
Responsibility:
oModeling All Primary members Steel for Topside, Jacket, and Bridges.
oModeling Joints, Cans, Cone, Floor deck plate and elliptical.
oModeling Handrail & Stair tower arrangement
oCoordinating with Design Lead and Project S3D Administrator to customize S3D as per project requirements.
oResolving Clash in Model.
oPreparation of MTO for Structures using sp3d reports.
oExtracted Smart sketch Drawings for all plans and elevations & Joint details.
Projects Involved: PETROFAC (Kuwait)
Project : Lower Fars Heavy Oil Development Program Phase-1
Client : KOC (Kuwait Oil Company)
Designation : Structural Designer
Duration : Oct 2018 to JUNE 2019.
Responsibility:
oReview and inspect the contractors work to ensure that both the design intent and the quality of workmanship and materials are achieved in accordance with the drawings and specifications.
oPrepare of progress reports based upon the findings during site visits.
oProvide recommendations to overcome deficiencies or potential problems observed on site related to the project design requirements.
oCoordinate with suppliers, site engineers and project managers for the resolution of problems.
oRed line marking related resolving and design preparation for project.
oClarifying details with Engineering Departments for project.
oFollow up the detail especially during the construction phase.
oProvide supplementary design drawings and information as needed.
Projects Involved: FLUOR (Delhi)
Project : Future Growth Project
Client : TENGIZCHEVROIL (TCO)
Designation : Structural Designer
Duration : January 2017 to February 2018
The Future Growth Project (FGP) is planned as the next major expansion of company s (Tengizchevroil) oil production capacity. The Capacity of the FGP process facilities is 12 MMTY of stabilized oil and 960 MMscfd of injected gas. Modularization of the FGP facilities considers the design of plant using equipment modules and pre-assembled pipe rack sections (PARs) collectively termed Modules .
Worked as a Structural Designer, Modeling of Steel Structures Using SP3D and preparation of GA Drawing s And Standard Drawings Using Micro-Station and Auto-Cad as per Client requirements. Model Self Checking and Preparation of Design drawings for Oil & Gas Industry.
Responsibility:
oModeling for Steel Structures, Pipe racks, slug catcher supports, Platform Supports.
oModeling for Steel Ladders, Steel Hand railings, Gratings.
oClearing Inter Discipline Checking (IDC).
oResolving Clash in Model.
oPreparation of MTO for Structures using sp3d reports.
oPreparation of Model locking reports.
oSupport structures Pipe Rack Overall Layout Plan, Standard Steel Drawings, Support Layout and Details.
oPreparation of GA drawing.
Projects Involved: PETROFAC (Chennai)
Project :Jazan Refinery Project
Client : Saudi Arabian Oil Company
Designation : Structural Designer
Duration : July 2016 to January 2017
Responsibility:
oModeling for Steel Structures, Pipe racks, slug catcher supports, Platform Supports.
oModeling for Pipe Support foundation.
oModeling for Steel Ladders, Steel Hand railings, Gratings.
oClearing Inter Discipline Checking (IDC).
oResolving Clash in Model.
oPreparation of MTO for Structures using sp3d reports.
oPreparation of Model locking reports.
oSupport structures Pipe Rack Overall Layout Plan, Standard Steel Drawings, Support Layout and Details.
oPreparation of GA drawing.
Projects Involved: PETROFAC (Mumbai)
Project : Fadhili Gas Plant Project
Client : Saudi Arabian Oil Company
Organization : PETROFAC (Mumbai)
Designation : Structural Designer
Duration : June 201 6 to July 2016
Fadhili Gas Plant (FGP) is a grassroots gas processing facility with a total capacity of 2,500 MMSCFD located approximately 30 Kms North West of Khursaniyah Gas Plant and 80 Kms West of Jubail.
Responsibility:
oModeling for Steel Structures, Pipe racks, slug catcher supports, Platform Supports.
oModeling for Structure foundation, Equipment foundation, Roads, paving, Trenches Etc.
oModeling for Steel Ladders, Steel Hand railings, Gratings.
oClearing Inter Discipline Checking (IDC).
oResolving Clash in Model.
oPreparation of MTO for Structures using sp3d reports.
oPreparation of Model locking reports.
oSupport structures Pipe Rack Overall Layout Plan, Standard Steel Drawings, Support Layout and Details.
oPreparation of GA drawing.
Projects Involved: PETROFAC (Chennai)
Project : ZADCO
Client : Zakum Development Company
Designation : Structural Designer
Duration : March 2014 to March2016
oInstall on-Island facilities for production capacity of 750,000 BOPD for Production Build-Up (PBU) Phase. Phased completion/handover: PBU-1, PBU-2A & PBU-2B.
oLeaving provisions for future Sustainable Production (SP) Phase.
oInstall Initial Production (IP) facilities with temp facilities on West Island (optional scope).
oDemolition of IP facilities upon completion of PBU-1, PBU-2A & PBU-2B on all Islands (optional scope).
oFour new artificial islands (Central, North, South and West) and subsea pipelines, cables, risers and flares being constructed by others. Each Island to have Drilling Area, Oil Producing/Injection Wells, Processing Area, Utilities Area, Accommodation.
Responsibility:
oModeling for Steel Structures, Pipe racks, Pipe supports, Platform Supports.
oModeling for Steel Ladders, Steel Hand railings, Gratings.
oClearing Inter Discipline Checking (IDC).
oResolving Clash in Model.
oPreparation of MTO for Structures using sp3d reports.
oPreparation of Model locking reports.
oSupport structures Pipe Rack Overall Layout Plan, Standard Steel Drawings, Support Layout and Details.
oPreparation of GA drawing.
oModeling for Pipe Support foundation.
Projects Involved: CGC CONVERSE TECHNOLOGIES (Hyderabad)
Project : KNPC (Kuwait National Petroleum Company)
Client : Kuwait National Petroleum Company
Designation : Structural Designer
Duration : JULY 2012 TO FEB 2014
Mina Al Ahmadi (MAA), one of the largest refineries in the region, was established in 1944 and since then has undergone several modifications/upgrades.
Responsibility:
oModeling for Steel Structures, Pipe racks, slug catcher supports, Platform Supports.
oModeling for Structure foundation, Equipment foundation, Roads, paving, Trenches Etc.
oModeling for Steel Ladders, Steel Hand railings, Gratings.
oClearing Inter Discipline Checking (IDC).
oResolving Clash in Model.
oPreparation of MTO for Structures using sp3d reports.
oPreparation of Model locking reports.
oSupport structures Pipe Rack Overall Layout Plan, Standard Steel Drawings, Support Layout and Details.
oPreparation of GA drawing.
Projects Involved: CGC CONVERSE TECHNOLOGIES (Hyderabad)
Project : NGL
Client : QATAR PETROLIUM
Designation : Structural Designer
Duration : JAN 2011 to JULY 2012
NGL It s the 1976 s Existing plant of Natural Gas to Liquid like NGL our scope is to remodeling for the documentation and expansion of the plant
Responsibility:
oPDMS 3D Modeling of primary and secondary structures, stiffeners plates, gratings, platforms,
oModeling of equipment racks, pipe racks, staircase, ladders, and stiffener plates.
oExtraction of Auto Cad 2D drawings and updating as per drafting requirements.
SUMMARY
o3d Modeling on Smart Plant.
oCoordinating with other discipline.
oPreparation of general arrangement & foundation layout drawings.
oPreparing Structural Steel General Arrangement & detail Drawings for on Smart Sketch, Micro station & AutoCAD.
oPreparation of Structural steel drawing on Smart sketch.
oPreparing Structural Steel standard Drawings on AutoCAD.
oPreparing Structural Steel General Arrangement Drawing for pipe rack, equipment platform, technological structure, Shelters, circular platforms with Smart Sketch, Microstation & AutoCAD.
oPreparation of Pipe supports detail drawings.
oBill of material from 3D model (SP3D).
EDUCATION
oSecondary School Certificate
oDiploma in CIVIL
oSteel Structural in Oil & Gas from IPEBS
PERSONAL DETAILS
oName :N.Rameshsagar
oFathers Name :N. kondalaRao
oSex :Male
oMarital Status :Married
oLanguages Known :English, Telugu and Hindi
oNationality :INDIA
Thanks & Best Regards RameshSagar.N