MR.ASGHAR IMAM
ELECTRICAL ENGINEER, MMUP, *****
Email **-**********.***@*****.***
QID- 290********
Mobile No- +974******** (Qatar)
OBJECTIVE
OBJECTIVE
Seeking a position in an organization that provides me ample opportunity to explore & Excel while carving out the niche for personal, professionals well as organizational goals.
PROFESSIONAL SNAPSHOT
Electrical engineering graduate with practical experience approx. 6 years in Supervision, installation, testing and commissioning Shop drawing review, MS review, ITP review, including infrastructure, Building, MV System, LV system, street light, landscape light. focused and resourceful Electrical Engineer with exceptional team leadership and quality assurance abilities .able to work on multiple projects simultaneously and complete them on time and meticulous attention to details with regards to safety regulation and practices
PROFESSIONAL QUALIFICATION
Bachelors in Electrical & Electronics Engineering from Bhopal Institute of Technology and Science, Bhopal, RGPV, Madhya Pradesh (India)
Certified Electrical Engineer by MMUP (Ministry of Municipality and Urban Planning) (Reg.23958), Qatar KEY PROJECT HANDLED
Falcon-3 Phase -2 US Army Corps of engineers
Proposed (G+3) L. Accommodation, Birkat Al-Awamer Qatar
New Doha Port Project, Qatar (NPP0057)
Delta Distribution Network .Raipur India
Power Plant Development (660x 2MW) TPCIL.NELLORE (A.P) CAREER CONTOUR
Organization- Multi Energy Qatar (LTD) QATAR
Project: – Falcon-3 Phase-2 (Al Udeid Air Base)
Client: - US Army Corps of engineers
Consultant: - Parsons
Main Contractors: - UCE
Duration:-14 –July-2020 to till date.
Designation- QA/QC
Job Responsibilities:-
Responsible for site implementation & inspecting of electrical services, Communication system, LV & ELV System.
Supervision and inspection of installation of cable tray, GI Conduit, PVC Conduit, Cable laying, dressing, testing termination.
Supervision and installation inspection of DB, SDB, MDB, LV panel, Control panel, etc. (Including termination).
Supervision and installation of ELV System public address system, Fire detection and Alarm system.
Factory Acceptance Test (FAT) & Site Acceptance Test (SAT).
Expertise to execute T&C and Responsible for megger Testing and functional Check for LV panels.
Responsible for Supervision and Execution of Electrical System & Attend the inspection of IR (Inspection Request) & MIR (Material Inspection Request).
Update MIR & ITR Inspection & Submittal Log sheet.
Compiling weekly quality reports for site work.
Monitor health and Safety of the Construction work and reporting if any violation. Organization: - Multi Energy Qatar (Ltd) QATAR
Project: - Proposed (G+3) L. Accommodation
Client: - Hamad Mohamed Al Mana
Consultant:-Al Majid Consulting Engineering
Main Contractors: - UCE
Duration:-04-Dec-2018 to 13-July-2020
Experience: - 1 year 1 month & 9 Days
Designation:-Electrical Engineer
Job Responsibilities:-
Responsible for adequate allocation of manpower & resources for execution of site activities.
Review, analysis & resolves the electrical field construction design problem.
Responsible for installation of FACP.
Responsible for lighting system.
Responsible for emergency system.
Responsible for Wi-Fi system.
Responsible for small power system.
Responsible for Installation of Diesel Generator.
Responsible for testing & commissioning of electrical system.
Ordering of material as per contract specification
Interaction with clients, consultants & Third party inspection on engineering issues.
Responsible to review and confirm as-built drawings for all electrical shop drawing Changes and submit as-built to engineering for documentation
Organization: - Multi Energy Qatar (Ltd) QATAR
Project; - (New Port Project (NPP0057)
Client:-State of Qatar
Consultant:-AECOM
Main Contractor:-UCE
Duration:-29th Nov-2016 to 03-Dec-18
Experience: - 2 Years 4 days
Designation:-Site Electrical engr.
Job Responsibilities:-
To check the entire work as according to approved drawings
Installation of LV & HV Duct Bank
Installation of LV Power Cable
Installation of Cable Ladder/Cable Tray
Installation of Low Voltage Switchgear
Installation of Power Factor Controller (PFC)
Installation of Main Distribution Board (MDB)
Installation of Sub Main Distribution Board (SMDB)
Installation of uninterruptible Power System (UPS)
Installation of Diesel Generator
Installation of Feeder Pillar (FDRP)
Installation of Lighting Fixture
Installation of Land Scape Light
Installation of Power Post (Service Cabinet)
Installation of Lighting Protection
Installation of MSDB, EDB etc.
Experience on Factory Acceptance Test (FAT) Related to all LV Equipment’
Experience on Conduct the Inspection with Consultant
Experience on Testing & commissioning related to all LV Equipment’s
Experience on Submit the, MS, RA & ITP related to all LV Equipment’s
Experience on Submit the drawing and Comply the Consultant Comments
Responsible to review and confirm as-built drawings for all electrical shop drawing Changes, and submit as-built to engineering for documentation
Organization: - ADCC Info cad Limited Nagpur INDIA Client-CSPDCL, Raipur (C.G)
Project:-Delta Distribution Network.
Duration: - 1st May- 2016 to Nov-2016
Experience:-6 Month 2 days
Designation: - Jr. Executive of GIS SIAS
Job Responsibilities:-
Survey of 33kv Substation.
Survey of 11kv Feeder.
Survey of Power Transformer
Survey of Distribution Transformer
Survey of HT Line
Survey of LT Line
Survey of HT Cable
Survey of LT Cable
Survey of HT Pole.
Survey of LT Pole.
Survey of HT Consumer.
Survey of LT Consumer, etc.
Organization: - M/S SAHI RAM INDIA
Main Contractor- BGR ENERGY SYSTEM LTD (A.P)
Project: - Power Plant Development (660x 2MW) TPCIL.NELLORE (A.P) Duration: - 15th July-2014 to 30th January- 2016.
Experience: - 1 Year 6 Month & 15 Days
Designation:-Site Engineer
Job Responsibilities:-
Experience on LT & HT Pole Installation.
Handling of electrical load as per requirement.
Installation of Local Push Button.
To provide the entire electrical solutions as per requirement.
To check the entire work as according to approved drawings.
Knowledge on Cable laying
Experience on Low Voltage Cable
Experience on Cable Tray
Experience on Cable Termination
Experience on Distribution Transformer Installation
Experience on CTPT Installation
Experience on Power Transformer Installation
Installation of DB, SMDB & MDB
Knowledge on Earthing
SOFTWARE SKILLS
MS Office (Excel, Words, Power Point)
SOFTWARE SKILLS
PERSONAL SNIPPETS
SONAL QUALIT))
Date of Birth : 20th Sept 1990
Gender : Male
Marital Status : Un-Married
Nationality : Indian
Languages : English, Hindi & Urdu
Driving License : India- BR-022**********
Driving License : Qatar-290********
Address : Al Muraikh Doha Qatar
I
DECALERATION
I hereby declare that the information given here with is correct to best of my knowledge and I will be responsible for any discrepancy.
Date- 15/01/2022
Place-Doha ASGHAR IMAM