FAKHAR AZIZ MALIK
LAND SURVEYOR
DATE OF BIRTH : 01-04-1976
MARITAL STATUS : MARRIED
NATIONALITY : PAKISTANI
Driving License : Valid
SEC MEMBER SHIP NO : 332398
Mobile # 054*******, 059*******
E-mail **********@*****.***
OBJECTIVE:
Looking for a career job in the field of surveying and engineering while contributing towards the growth of the company by initiating my professional international experience
EDUCATION:
H.S.C. (Science) from BISE RAWALPINDI PAKISTAN
TECHNICAL EDUCATION:
Diploma in surveying from PMDC Surveying Institute Pakistan (1995)
2 Year Diploma in Surveying from GULF INSTITUTE FOR MODERN TECHNOLOGY PAKISTAN (2007)
HANDLING OF INSTRUMENTS:
Total station TOPCON, LEICA, SOKKIA Trimble GPS model R8 and R4
Able to work with Auto cad R14, 2004 & data uploading, downloading
Processing and using for different work task .Microsoft word and excel
PROFESIONAL EXPERIENCE IN SAUDI ARABIA
Working with OMRANIA ASSOCIATES from April 2019 to Dec 2020
Project: MOH Yanbu al Bahr (INFRASTRUCTURE)
RESPONSIBILITIES: Responsible for checking all surveying work such as Manhole location, Trench for Electrical Cable, Portable Water, Sewage Line House connections Layout, and level for each layer and centerline of road as per design drawings
Establish new control point. Topographic survey for filling and cutting and calculation of area
Working with DAR AL RIYADH CONSULTANTS from 03-12-2018 to APRIL 2019 & 08 MAY 2014 to 02 OCT 2016
PROJECT: AL DARB (JAZAN) M.O.H
RIYADH MUNCIPALITY (Bridges and Tunnel)
KING ABDUL AZIZ ROAD CROSSING WITH ANAS BIN MALAK ROAD (RIYADH)
RESPONSIBILITIES: Responsible for checking all surveying work such as level for each layer and centerline of road as per design drawings
Establish new control point. Topographic survey for filling and cutting and calculation of area
Worked with Saudi Diyar Engineering Consultant From 21-01-2012 to FEB 2014 & FEB 2018 to Dec 2018
PROJECT: NORTH PROJECT (SHARMAA TABUK REGION)
PROJECT:King Saud University Endowment (Riyadh)
FIVE PALACES RIYADH
KAFD TADAWUL tower 43 stories
Responsibilities and duties:
Establishing control points for horizontal and vertical alignment. Topographical survey of site existing above and underground structure, Excavation for basement raft and foundations, calculating and inspecting horizontal and vertical alignment of concrete raft foundations retaining walls columns beams slab edges,as built survey of building external vertical alignment for the purpose of façade work & quantity calculation,
Worked with CCC AND ALSAIF JOINTVENTURE as a Surveyor from January 2009 to March 2011
Project: PNUFW (PRINCESS NORA UNIVERSITY FOR WOMEN) IN RIYADH
Responsibilities and duties:
Establishing control points for horizontal and vertical alignment. Topographical survey of site existing above and underground structure,Performed calculations from drawings and marked on site Roads, storm water sewer supply water horizontal and vertical alignment, all kind of infrastructure work,including cables and cables duct work, walkways, parking lot area, backfilling, subgrade, sub base, asphalt layout etc.
Worked with AL-OSAIS (MCM) as a surveyorfrom Nov 2007 to Nov 2008
Project: AL-HASA BULK PLANT HUFOF WITH SAUDI ARAMCO
Responsibilities and duties:
Establishing control points for horizontal and vertical alignment. Calculations coordinates from auto cad drawings for foundations cables duct, pipelines manholes, concrete work all infrastructure work,roads access roads and, walkways, loading dock parking lot area, backfilling, subgrade, sub base, asphalt layout etc.
Worked with ICC (INTERNATIONAL CENTER FOR COMMERCE &CONTRACTING) as a Surveyor from 27-11-2005 to 06-03-2007
PROJECT:
PUBLIC PENSION FUND BUILDING IN RIYADH &
RAFIQ AL HARARI TECHNICAL TRAINING INSTITUTE RIYADH
Responsibilities and duties:
Establishing control points for horizontal and vertical alignment. Topographical survey of site existing above and underground structure, Excavation for basement raft and foundations, calculating and onsite points marking horizontal and vertical alignment of concrete raft foundations retaining walls columns beams slab edges,as built survey of building external vertical alignment for the purpose of façade work & quantity calculation,
Worked with AL - MASHRIK CO. in Riyadh
Project: WADI HANIFA RESTORATION PROJECT IN RIYADH
Responsibilities and duties:
Establishing control points for horizontal and vertical alignment Performed calculations from drawings and marked on site Roads, walkways public rest area culverts layout, all kind of infrastructure work,including underground cables and cables duct work, lighting poles, parking lot area, backfilling, subgrade, sub base, asphalt work layout etc.
Worked with SAUDI LEBANESE TAROUK CONTRACTING CO.
as a surveyor From 03-06-2003 to 14-11-2004
Project: CENTRIYA (BUILDING) RIYADH
Responsibilities and duties:
Establishing control points for horizontal and vertical alignment. Topographical survey of site existing above and underground structure Excavation for basement raft and foundations, calculating and marking on site concrete foundations corners retaining walls columns beams slab edges.
Worked with TEKSER as a surveyor From January 1999 to August 2002
PROJECT: CHASHMA TO D.G.KHAN HIGH WAY
Responsibilities and duties:
Establishing control points for horizontal and vertical alignment. Performed calculations from drawings and marked on site Roads, culverts layout, excavation, backfilling, sub grade, sub base, asphalt work layout etc.
Worked with PUT SARAJEVO CO As a surveyorfrom 21-11-1997 to 12-01-1999
PROJECT:INDUS HIGH WAY (N 55) D.G.Khan
Responsibilities and duties:
Establishing control points for horizontal and vertical alignment. Performed calculations from drawings and marked on site Roads, culverts layout, excavation, backfilling, sub grade, sub base, asphalt work layout etc.
Worked with C.P.E.C.C. As a surveyor from 24-02-1996 to 19-11-1997
PROJECT:INDUS HIGH WAY D.G.Khan
Responsibilities and duties:
Establishing control points for horizontal and vertical alignment. Performed calculations from drawings and marked on site Roads, culverts layout, excavation, backfilling, sub grade, sub base, asphalt work layout etc.