OBJECTIVE:
** ***** ** ***** ********** as Land Surveyor Domestic. I am
willing to take up any challenging assignment and flexible to work in any environment. I am interested to explore my horizons by seeking new challenges in the field of construction.Strong willingness to take additional responsibilities and relocation for exposure and professional development proven ability to work under pressure and tight deadlines with efficiency and effectiveness. Experience to work as team leader to motivate, control and direct team member to get the desired result within given time frame. Education:
B. Tech (civil 4 years) : University of South Asia, LHR, Pakistan. D.A.E (1st Division) :Punjab Board of Technical Education, LHR, Pakistan
Instruments Used:
Automatic Level Machines.
Nikon/Sokia Level Machines.
Theodolite T2.
Sokkia Theodolite D6 & D8.
Total Station Sokkia 310,510,630 RK.
Sokkia Total Station Set 2C, 3C, 5F & Power set 2010
Top Con ET2, Total Station GTS 303,720
Total Station Leica TC 805
Total Station Nikon DTM 332, 552
Trimble GPS 5800 R8
Leica GPS 14
Spectra Precision GPS receiver SP80
Computer Programmer able Casio 880-P
Computer Programmer able Casio 603-P
Technical Qualification.
Civil 3D
AUTOCAD
MS Office Family
Internet & Email
Date sheet
PERSONAL SKILLS:
Excellent communication skill
Positive attitude, hardworking and Organized.
Seeking continual improvement and applying and/or adding to Technical Knowledge.
Time Management Skills.
WAQAS HASSAN
Address:
Current Location:
Building No. 2, zone 56,
Street 279, Ain Khaled
DOHA, QATAR.
Cell No.
Email:
*********@*****.***
Personal Bio data
Date of Birth
16th, Sep 1992
Marital Status
Married
Religion
Islam
Nationality
Pakistani
Language
English, Urdu, Hindi
Transfer Visa
NOC Available
Current Job Position
Land Surveyor
Leadership Capabilities
Total Experience : 08 Years
Types of Work:
1. Road Survey
2. Fixing of curbstone
3. Sewerage work
4. Water supply work
5. Drainage work
6. Submitted Requested
7. Boundary wall work
8. Ponds, swale, ditches work
9. Work as supervisor
10. Utilities(T.S.E, PW, OOREEDO, FOUL SEWER, SURFACE WATER MV LV CABLE)
Feb 2020 to Present : Land Surveyor.
Project : RIW In Various Areas Of Greater Doha Phase-6(DC042-P00) Organization : Marbu Contracting Co. W.L.L. Doha, Qatar Client : Public Work Authority, Qatar (ASHGAL).
Consultant : Gulf Engineering & Industrial Consultancy (GIEC). Duties & Responsibilities:
Full authority and responsibility to manage supervise and control the work.
Manage full life cycle of project.
Evaluate and provide alternatives to scheduled work to ensure an integrated Survey team.
Controlling all the activities carrying out (i.e. setting out, topographic survey, Monthly survey Quantities, making a Bench Mark, etc.).
Overall, management of the project sites, co ordination with the Client / Consultant.
Supervised & performed joint inspections with Client / Consultant.
Existing Topographical Survey.
Vertical Control as per design levels.
Setting out of Roads, Kerb Lines in straight & curves.
Maintained the Survey reports and records of the project.
Prepare As Built records of all field activities.
Setting out of Dewatering Well.
Setting out of Geotechnical Bore Holes for Piezometer.
Setting out of Earthing Mesh Pit.
Dec 2019 to Feb2020 : Land Surveyor.
Project : Construction Of Bus Parking Area For Al Rayyan Stadium Organization : Marbu Contracting Co. W.L.L. Doha, Qatar Client : Public Work Authority, Qatar (ASHGAL).
Consultant : Gulf Engineering & Industrial Consultancy (GEIC). Duties & Responsibilities:
Full authority and responsibility to manage supervise and control the work.
Manage full life cycle of project.
Evaluate and provide alternatives to scheduled work to ensure an integrated Survey team.
Controlling all the activities carrying out (i.e. setting out, topographic survey, Monthly survey Quantities, making a Bench Mark, etc.).
Overall, management of the project sites, co ordination with the Client / Consultant.
Supervised & performed joint inspections with Client / Consultant.
Existing Topographical Survey.
Vertical Control as per design levels.
Setting out of Roads, Kerb Lines in straight & curves.
Maintained the Survey reports and records of the project.
Prepare As Built records of all field activities.
Setting out of Dewatering Well.
Setting out of Geotechnical Bore Holes for Piezometer.
Setting out of Earthing Mesh Pit.
Setting out of TBM Launching Pit.
Apr 2013 to 2019 : Land Surveyor.
Project : Bhalwal industrial Estate
Organization : Saad Ulah khan & Brother’s.
Client : Punjab industrial estate (PIE).
Consultant : Punjab industrial estate (PIE).
Project Cost. : Two Billions
Duties & Responsibilities:
Full authority and responsibility to manage supervise and control the work.
Manage full life cycle of project.
Evaluate and provide alternatives to scheduled work to ensure an integrated Survey team.
Controlling all the activities carrying out (i.e. setting out, topographic survey, Monthly survey for quantities, making a Bench Mark, etc.).
Preparation of Survey Team for each Project.
Controlling of all the subcontractors working Relative with Survey.
Overall, management of the project sites, co-ordination with the Client / Consultant.
Supervised & performed joint inspections with Client / Consultant.
Performed routine Cleaning on Instrument & as applicable periodic calibration of laboratory instruments. Ensured that all Instruments is properly operated, maintained and stored.
Existing Topographical Survey.
Vertical Control as per design levels.
Preparation of Sub-contractor quantities.
Used civil 3D for calculation for Earthwork Quantities.
Setting out of Roads, Kerb Lines in straight & curves.
Maintained the Survey reports and records of the project.
Prepare As-Built records of all field activities.
Setting out of Dewatering Well.
Setting out of Geotechnical Bore Holes for Piezometer.
Setting out of Earthing Mesh Pit.
Reference:
References will be furnished upon demand and can travel any time anywhere I am agree that information, I have provided is true & complete to the best of my knowledge