SERGIO D. PANGANIBAN JR.
Blk-** L-* Avida village Nuvali Canlubang Calamba
Laguna, Philippines
Cel. No: 095******** / 099********
Email Add: *******@*****.***
Availability: I can start for work as soon as possible PERSONAL DATA
Age: 48
Date of Birth: December 9, 1972
Gender: Male
Civil Status: Marriage
Height: 5’5”
Weight: 68 Kls
Nationality: Filipino
Religion: Roman Catholic
Permanent Address: Blk-17 L-4 Avida village Nuvali Canlubang Calamba WORK EXPERIENCE
1. Position: QaQc Engineer
Duration: October 7, 2020- Up to Present
Company: ZTE Philippines
Project: 2019 DITO Project
Location: CALABARSON AREA
Department: QUALITY TEAM
Duties & Responsibilities;
Inspection of elevation and area location prior to start excavation if the subcontractors complied as per DDD and quality requirements
Daily monitoring activities in every ongoing work at site area
Inspection of reinforcement bar as per re-bars scheduled
Inspection of anchor bolt eccentricity, re-bars spacing, diameter quantity
Inspection of vertical/Horizontal alignment using level hose and plumb bob
Witnessing compressive test of concrete cylinder conducted by the approved 3rd party Geo technical laboratory
Witnessing concrete pouring activities by monitoring / inspecting concrete item like slump, temperature, concrete mix designed, components of concrete, travel disposal time of concrete from batch plant to site area, segregation, correct concrete vibration and concrete cylinder sample
Perform rebound hammer test after 3-7 days of pouring prior back filling works
Inspection /witness prior to removal of form works and raise issue thru I center if they have some defect of concrete physical appearance
Monitoring of back filling works that the minimum thickness of backfill is 300mm and should be compacted prior to proceed for the next layer
Monitoring of bolt torquing activities using calibrated torque wrench
Witnessing verticality alignment of structural tower using total station equipment's 2. Position: Head Qaqc ngineer
Duration: July 5, 2019- October 2, 2020
Company: Sta Clara International Corporation
Project: Seismic Resiliency of 40ML Magdiwang Reservoir (Mynilad Project) Location: Bgry. Molino III Bacoor Cavite
Department: QC Civil Department
Duties & Responsibilities;
Prepared / Submit for the Project Quality Plan (PQP) for Approval
Prepared / Submit the Typical Inspection Plan (ITP) for Approval
Prepared /Submit The Methodology or Work Method of Statement for Approval
Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification
Witness of mock up of Materials prior to acceptance / Approval of Client
Prepared/ Witness the trial mixed of concrete designed prior to used in the Project
Soil Sampling & Testing for every stock file/ existing sub grade, ABC, & Sub base prior to used as embankment materials.
Prepared Qaqc documents of the entire project (certifications, calibrations, test results, inspection requests, non-compliance reports, site instructions/observations, permanent materials delivered, etc.)
Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site.
Weekly Meeting with the Qc Engineer regarding some problem encountered in site area & some review of Standard ( DPWH, ACI, ASTM, AASTHO & Etc.)
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Carry out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.
Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)
Responsible for the quality workmanship of every activity
Plan and managing the performance of internal quality audits, recommend improvement for the process to avoid a non-conformity.
3. Position: Project Quality Engineer
Duration: November 12, 2018- July 4, 2019
Company: Schierman & Cruz Construction Incorporated Project: Decathlon Store
Location: Masinag Antipolo City
Department: QC Civil Department
Job Description & Responsibilities;
Prepared / Submit for the Project Quality Plan (PQP) for Approval
Prepared / Submit the Typical Inspection Plan (ITP) for Approval
Prepared /Submit The Methodology or Work Method of Statement for Approval
Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification
Witness of mock up of Materials prior to acceptance / and Approval of Client
Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring
Coordinate with the consultant’s representative and Site In-charge for inspection and meeting about quality problems including the closure of Non-Compliance Report.
Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)
Weekly Meeting with the Client & Construction team concerning about the Project issue
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Report to the QA/QC Manager, control, and monitor all activities related to Quality Management System, QMS
Supervise effective implementation of all test and inspection schedule and ensure adherence to all procedures and coordinate with various teams to perform quality audit on process.
Punch list of non conformance structure prior to turn over of project.
Taking care of QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents. Responsible for the closure of Non- conformance, NCR and Site Instruction, SI.
4. Position: PQE/ QaqcEngineer
Duration: January 24, 2018- November 12, 2018
Company: Betonbau Philippines Inc
Project: Knauf Gypsum Philippines Inc.
Location : (Calaca Batangas City)
New Zealand Creamery Philippines
Location: Canlubang Calamba Laguna
Department: QC Civil Department
Duties & Responsibilities;
Prepared /Submit The Methodology or Work Method of Statement for Approval
Resourcing Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification
Witness of mock up of Materials prior to acceptance / and Approval of Client
Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring
Responsible for the quality and workmanship of every activity, thorough knowledge of all phases of engineering construction relating to Civil, Architectural and Structural discipline interfacing the multidisciplinary operations.
Develop method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project.
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Carry out Internal Audit at the site as scheduled in the Project Quality Plan, PQP
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)
Supervise effective implementation of all test and inspection schedule and ensure adherence to all procedures and coordinate with various teams to perform quality audit on process.
Punch list of non conformance structure prior to turn over of project 5. Position: Sr. QC Civil Inspector
Duration: July 21, 2016 -April 30, 2017
Company: Hitachi / CCC Company
Project : Jizan Gas Refinery (Aramco Project)
Location: BI No. 66-000-29563/ Saudi Arabia
Department: QC Civil Department
Duties & Responsibilities;
Prepared /Submit The Methodology or Work Method of Statement for Approval
Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification
Raising / Closed RFI in every activities on Site
Prepared/ Witness the trial mixed of concrete & Super pave( Asphalt) designed prior to used in Site Project.
Assigned Task to the QC Engineers /monitors the daily activities according to their expertise and experiences
Prepared Qaqc documents of the entire project (certifications, calibrations, test results, inspection requests, non-compliance reports, site instructions/observations, permanent materials delivered, etc.)
review of Standard (Aramco Stadard, ACI, ASTM, AASHTO & Etc.)
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Supervise effective implementation of all test and inspection schedule and ensure adherence to all procedures and coordinate with various teams to perform quality audit on process.
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)
Punch list of non conformance structure prior to turn over of project
Supervising quality control throughout the construction and production process 6. Position: QC Civil Inspector
Duration: November 26, 2014- February 2, 2016
Company: POSCO/FMSCO Company
Project : Sulfur Rail Car Loading Facility (Aramco Project) Location: BI No. 10-01825- Berry Gas Plant -KSA
Department: QC Civil Department
Duties & Responsibilities;
Prepared /Submit The Methodology or Work Method of Statement for Approval
Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) Contract Specification
Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring
Soil Sampling & Testing for every stock file/ existing sub grade, ABC & Sub base prior to used as embankment materials for back-filling
Inspect and certifies that all incoming construction materials and good delivered to the job site comply with the approved submittal
Weekly Meeting with the Client & Construction
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)
Punch list of non conformance structure prior to turn over of project 7. Position: Civil Inspector (SAP # 70014321)
Duration: June 25, 2013- Nov. 6, 2014
Company: SungChang Al- Shaikh Co. LTD (SAACO)
Company Industry: Gas Plant Project (Aramco Project)-KSA Project: BI No. 10-1254 (Uthmaniyah Cogeneration Interconnection Facilities. Department: QA/QC Civil Dept.
Duties & Responsibilities;
Prepared /Submit The Methodology or Work Method of Statement for Approval
Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring
Soil Sampling & Testing for every stock file/ existing sub grade, ABC, Sub base & Sand prior to used as embankment materials for back-filling
Material receiving Inspection for the inspect-able material prior to used in Site Area
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)
Weekly Meeting with the Client & Construction
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Works activities ( Concrete/ Asphalt Pavement, & Back Filling of embankment Materials)
Inspection of Pipe Rock, Pipe Support, Metering Skid Cat walk & Platform Installation
Punch list of non conformance structure prior to turn over of project 8. Position: Civil Engineer / QC Inspector
Duration: December 23, 2012- March 10, 2013
Company: MODON / Al Ajmi Company
Project: Dammam 3 Idustrial City Development
Location: Al-Oquir.Abqaiq K.S.A
Department: Civil Engineering Dept
Duties & Responsibilities;
Prepared /Submit The Methodology or Work Method of Statement for Approval
Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification
Prepared/ Witness the trial mixed of concrete designed & Asphalt prior to used in Site Project&
Soil Sampling & Testing for every stock file/ existing sub grade, ABC, Sub Base & Sand prior to used as embankment materials
Material receiving Inspection of materials to be used in site
Weekly Meeting with the Client & Construction
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)
Inspection of ( Concrete/ Asphalt Pavement, & Back Filling of embankment Materials)
Street light Precast Foundation, Manhole & RCP installation 9. Position: QA/QC Civil Inspector (SAP # 70014321) Duration: February 17, 2012- December 23, 2012
Company: Al Ajmi Company
Project : Railway Overpass Project( highways & Bridge)- BI/JO No. 10-00039-007) Location: Mubarraz Al-Hassa K.S.A.
Department: Civ il Engineering Dept.
Duties & Responsibilities;
Prepared /Submit The Methodology or Work Method of Statement for Approval
Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification
Prepared/ Witness the trial mixed of concrete designed & Asphalt prior to used in site area.
Prepared/Witness for the trial mixed of super pave (Asphalt) designed prior to used as road pavement
Witness & visual inspection of prime coat & tack coat application
Inspection of asphalt binder & wearing coarse application
Material receiving Inspection of materials to be used in site
Weekly Meeting with the Client & Construction
Close out of Non Conformance Report ( NCR)
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification) 10. Position: Civil QC Inspector (SAP # 70014321)
Duration: March 9, 2011- Feb. 16, 2012
Company: Al Ajmi Company
Project: NGL Recovery Program -Site preparation, Highways & Bridges (BI/JO No. 10-00776- 0001)
Location: ShaybahK.S.A.
Department: QC CivilDept.
Duties & Responsibilities;
Prepared /Submit The Methodology or Work Method of Statement for Approval
Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification
Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring
Prepared/Witness for the trial mixed of super pave (Asphalt) designed prior to used as road pavement
Witness & visual inspection of prime coat & tack coat application
Inspection of asphalt binder & wearing coarse application
Soil Sampling & Testing for every stock file/ existing sub grade prior to used as embankment materials for back-filling
Material receiving Inspection of materials to be used in site
Weekly Meeting with the Client & Construction
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification) 11. Position: Civil QC Inspector
Duration: Dec. 1, 2007- Dec. 18, 2010
Company: Saudi Aramco Project (Dhahran)
Company Industry: Construction/Building
Location: Alkhobar K.S.A.
Department: QC Civil Dept.
Job Description & Responsibilities;
Prepared /Submit The Methodology or Work Method of Statement for Approval
Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification
Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)
Material receiving Inspection of materials to be used in site
Inspection in Client Consultant
Weekly Meeting with the Client & Construction
Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.
Punch list of non conformance structure prior to turn over of project 12. Position: Site Engineer
Duration: June 1, 1997 – June 2. 2007
Company: Blue Lagoon Villas / Municipality Projects Project: Bgry Roads / Residential Building
Location: Aklan
Department: Civil Engineering Dept.
Job Description & Responsibilities;
*Prepare equipment and manpower requirement for the project.
* Directly report to the Site manager
* Check drawings prior to the start of the project.
* Prepare material requirements prior to start of the project.
*Prepare weekly accomplishment report to be submitted to the site manager.
* Discuss with technical manage possible project instruction, and any work.
*Construction of Municipal Roads & Buidings
13. Position: SK Chairman
Duration: May, 1992 – May. 1994
Company: DILG
Location: Alegria Buruanga Aklan
Job Description & Responsibilities;
Attend Weekly Meeting together with Bgry Officials
Facilitate Barangay sports Fiest
Build some Project related to the youth.
EDUCATION
Education level: Bachelor’s / College Degree
Education Field: Engineering (Civil)
Course: Bachelor of Science in Civil Engineering
School/University: Garcia College of Technology
Location: Kalibo, Aklan
Date: June 1990 – March 1997
Additional Education;
School/ University: West Visayan State University – Ilo Ilo city Course : Education Unit Sponsored by DOST
Units : 9 Units
School/ University: Northwestern Visayan College – Kalibo Aklan Course : Public Administration
Units : 18 Units
SKILL YEARS OF EXPERIENCE REMARKS
Micro station design 4 yrs I have knowledge & experience AutoCAD 3 yrs
Microsoft words & excel 14 yrs
Power Point
LANGUAGE SPOKEN
English, Arabic & Tagalog
REFERENCES
ENGR. ROLLY ARA
Sta Clara International Corporation
Cel. No. 091********
Civil Superintendent
ENGR. GLENN ORDONIO
Betonbau Philippines Inc.
Cel. No. 091********
Project Manager
ENGR. WILLIAM DELA PENA
Archetype Philippines Inc
Cel. No. 092********
Senior Civil Engineer