Post Job Free
Sign in

Aramco Calamba

Location:
Philippines
Salary:
4500
Posted:
January 06, 2022

Contact this candidate

Resume:

SERGIO D. PANGANIBAN JR.

Blk-** L-* Avida village Nuvali Canlubang Calamba

Laguna, Philippines

Cel. No: 095******** / 099********

Email Add: *******@*****.***

Availability: I can start for work as soon as possible PERSONAL DATA

Age: 48

Date of Birth: December 9, 1972

Gender: Male

Civil Status: Marriage

Height: 5’5”

Weight: 68 Kls

Nationality: Filipino

Religion: Roman Catholic

Permanent Address: Blk-17 L-4 Avida village Nuvali Canlubang Calamba WORK EXPERIENCE

1. Position: QaQc Engineer

Duration: October 7, 2020- Up to Present

Company: ZTE Philippines

Project: 2019 DITO Project

Location: CALABARSON AREA

Department: QUALITY TEAM

Duties & Responsibilities;

Inspection of elevation and area location prior to start excavation if the subcontractors complied as per DDD and quality requirements

Daily monitoring activities in every ongoing work at site area

Inspection of reinforcement bar as per re-bars scheduled

Inspection of anchor bolt eccentricity, re-bars spacing, diameter quantity

Inspection of vertical/Horizontal alignment using level hose and plumb bob

Witnessing compressive test of concrete cylinder conducted by the approved 3rd party Geo technical laboratory

Witnessing concrete pouring activities by monitoring / inspecting concrete item like slump, temperature, concrete mix designed, components of concrete, travel disposal time of concrete from batch plant to site area, segregation, correct concrete vibration and concrete cylinder sample

Perform rebound hammer test after 3-7 days of pouring prior back filling works

Inspection /witness prior to removal of form works and raise issue thru I center if they have some defect of concrete physical appearance

Monitoring of back filling works that the minimum thickness of backfill is 300mm and should be compacted prior to proceed for the next layer

Monitoring of bolt torquing activities using calibrated torque wrench

Witnessing verticality alignment of structural tower using total station equipment's 2. Position: Head Qaqc ngineer

Duration: July 5, 2019- October 2, 2020

Company: Sta Clara International Corporation

Project: Seismic Resiliency of 40ML Magdiwang Reservoir (Mynilad Project) Location: Bgry. Molino III Bacoor Cavite

Department: QC Civil Department

Duties & Responsibilities;

Prepared / Submit for the Project Quality Plan (PQP) for Approval

Prepared / Submit the Typical Inspection Plan (ITP) for Approval

Prepared /Submit The Methodology or Work Method of Statement for Approval

Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification

Witness of mock up of Materials prior to acceptance / Approval of Client

Prepared/ Witness the trial mixed of concrete designed prior to used in the Project

Soil Sampling & Testing for every stock file/ existing sub grade, ABC, & Sub base prior to used as embankment materials.

Prepared Qaqc documents of the entire project (certifications, calibrations, test results, inspection requests, non-compliance reports, site instructions/observations, permanent materials delivered, etc.)

Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site.

Weekly Meeting with the Qc Engineer regarding some problem encountered in site area & some review of Standard ( DPWH, ACI, ASTM, AASTHO & Etc.)

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Carry out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.

Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)

Responsible for the quality workmanship of every activity

Plan and managing the performance of internal quality audits, recommend improvement for the process to avoid a non-conformity.

3. Position: Project Quality Engineer

Duration: November 12, 2018- July 4, 2019

Company: Schierman & Cruz Construction Incorporated Project: Decathlon Store

Location: Masinag Antipolo City

Department: QC Civil Department

Job Description & Responsibilities;

Prepared / Submit for the Project Quality Plan (PQP) for Approval

Prepared / Submit the Typical Inspection Plan (ITP) for Approval

Prepared /Submit The Methodology or Work Method of Statement for Approval

Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification

Witness of mock up of Materials prior to acceptance / and Approval of Client

Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring

Coordinate with the consultant’s representative and Site In-charge for inspection and meeting about quality problems including the closure of Non-Compliance Report.

Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)

Weekly Meeting with the Client & Construction team concerning about the Project issue

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Report to the QA/QC Manager, control, and monitor all activities related to Quality Management System, QMS

Supervise effective implementation of all test and inspection schedule and ensure adherence to all procedures and coordinate with various teams to perform quality audit on process.

Punch list of non conformance structure prior to turn over of project.

Taking care of QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents. Responsible for the closure of Non- conformance, NCR and Site Instruction, SI.

4. Position: PQE/ QaqcEngineer

Duration: January 24, 2018- November 12, 2018

Company: Betonbau Philippines Inc

Project: Knauf Gypsum Philippines Inc.

Location : (Calaca Batangas City)

New Zealand Creamery Philippines

Location: Canlubang Calamba Laguna

Department: QC Civil Department

Duties & Responsibilities;

Prepared /Submit The Methodology or Work Method of Statement for Approval

Resourcing Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification

Witness of mock up of Materials prior to acceptance / and Approval of Client

Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring

Responsible for the quality and workmanship of every activity, thorough knowledge of all phases of engineering construction relating to Civil, Architectural and Structural discipline interfacing the multidisciplinary operations.

Develop method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project.

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Carry out Internal Audit at the site as scheduled in the Project Quality Plan, PQP

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)

Supervise effective implementation of all test and inspection schedule and ensure adherence to all procedures and coordinate with various teams to perform quality audit on process.

Punch list of non conformance structure prior to turn over of project 5. Position: Sr. QC Civil Inspector

Duration: July 21, 2016 -April 30, 2017

Company: Hitachi / CCC Company

Project : Jizan Gas Refinery (Aramco Project)

Location: BI No. 66-000-29563/ Saudi Arabia

Department: QC Civil Department

Duties & Responsibilities;

Prepared /Submit The Methodology or Work Method of Statement for Approval

Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification

Raising / Closed RFI in every activities on Site

Prepared/ Witness the trial mixed of concrete & Super pave( Asphalt) designed prior to used in Site Project.

Assigned Task to the QC Engineers /monitors the daily activities according to their expertise and experiences

Prepared Qaqc documents of the entire project (certifications, calibrations, test results, inspection requests, non-compliance reports, site instructions/observations, permanent materials delivered, etc.)

review of Standard (Aramco Stadard, ACI, ASTM, AASHTO & Etc.)

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Supervise effective implementation of all test and inspection schedule and ensure adherence to all procedures and coordinate with various teams to perform quality audit on process.

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)

Punch list of non conformance structure prior to turn over of project

Supervising quality control throughout the construction and production process 6. Position: QC Civil Inspector

Duration: November 26, 2014- February 2, 2016

Company: POSCO/FMSCO Company

Project : Sulfur Rail Car Loading Facility (Aramco Project) Location: BI No. 10-01825- Berry Gas Plant -KSA

Department: QC Civil Department

Duties & Responsibilities;

Prepared /Submit The Methodology or Work Method of Statement for Approval

Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) Contract Specification

Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring

Soil Sampling & Testing for every stock file/ existing sub grade, ABC & Sub base prior to used as embankment materials for back-filling

Inspect and certifies that all incoming construction materials and good delivered to the job site comply with the approved submittal

Weekly Meeting with the Client & Construction

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)

Punch list of non conformance structure prior to turn over of project 7. Position: Civil Inspector (SAP # 70014321)

Duration: June 25, 2013- Nov. 6, 2014

Company: SungChang Al- Shaikh Co. LTD (SAACO)

Company Industry: Gas Plant Project (Aramco Project)-KSA Project: BI No. 10-1254 (Uthmaniyah Cogeneration Interconnection Facilities. Department: QA/QC Civil Dept.

Duties & Responsibilities;

Prepared /Submit The Methodology or Work Method of Statement for Approval

Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring

Soil Sampling & Testing for every stock file/ existing sub grade, ABC, Sub base & Sand prior to used as embankment materials for back-filling

Material receiving Inspection for the inspect-able material prior to used in Site Area

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)

Weekly Meeting with the Client & Construction

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Works activities ( Concrete/ Asphalt Pavement, & Back Filling of embankment Materials)

Inspection of Pipe Rock, Pipe Support, Metering Skid Cat walk & Platform Installation

Punch list of non conformance structure prior to turn over of project 8. Position: Civil Engineer / QC Inspector

Duration: December 23, 2012- March 10, 2013

Company: MODON / Al Ajmi Company

Project: Dammam 3 Idustrial City Development

Location: Al-Oquir.Abqaiq K.S.A

Department: Civil Engineering Dept

Duties & Responsibilities;

Prepared /Submit The Methodology or Work Method of Statement for Approval

Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification

Prepared/ Witness the trial mixed of concrete designed & Asphalt prior to used in Site Project&

Soil Sampling & Testing for every stock file/ existing sub grade, ABC, Sub Base & Sand prior to used as embankment materials

Material receiving Inspection of materials to be used in site

Weekly Meeting with the Client & Construction

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)

Inspection of ( Concrete/ Asphalt Pavement, & Back Filling of embankment Materials)

Street light Precast Foundation, Manhole & RCP installation 9. Position: QA/QC Civil Inspector (SAP # 70014321) Duration: February 17, 2012- December 23, 2012

Company: Al Ajmi Company

Project : Railway Overpass Project( highways & Bridge)- BI/JO No. 10-00039-007) Location: Mubarraz Al-Hassa K.S.A.

Department: Civ il Engineering Dept.

Duties & Responsibilities;

Prepared /Submit The Methodology or Work Method of Statement for Approval

Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification

Prepared/ Witness the trial mixed of concrete designed & Asphalt prior to used in site area.

Prepared/Witness for the trial mixed of super pave (Asphalt) designed prior to used as road pavement

Witness & visual inspection of prime coat & tack coat application

Inspection of asphalt binder & wearing coarse application

Material receiving Inspection of materials to be used in site

Weekly Meeting with the Client & Construction

Close out of Non Conformance Report ( NCR)

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification) 10. Position: Civil QC Inspector (SAP # 70014321)

Duration: March 9, 2011- Feb. 16, 2012

Company: Al Ajmi Company

Project: NGL Recovery Program -Site preparation, Highways & Bridges (BI/JO No. 10-00776- 0001)

Location: ShaybahK.S.A.

Department: QC CivilDept.

Duties & Responsibilities;

Prepared /Submit The Methodology or Work Method of Statement for Approval

Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification

Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring

Prepared/Witness for the trial mixed of super pave (Asphalt) designed prior to used as road pavement

Witness & visual inspection of prime coat & tack coat application

Inspection of asphalt binder & wearing coarse application

Soil Sampling & Testing for every stock file/ existing sub grade prior to used as embankment materials for back-filling

Material receiving Inspection of materials to be used in site

Weekly Meeting with the Client & Construction

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification) 11. Position: Civil QC Inspector

Duration: Dec. 1, 2007- Dec. 18, 2010

Company: Saudi Aramco Project (Dhahran)

Company Industry: Construction/Building

Location: Alkhobar K.S.A.

Department: QC Civil Dept.

Job Description & Responsibilities;

Prepared /Submit The Methodology or Work Method of Statement for Approval

Resourcing of Material to be used in the project as per Billing of Quantity (BOQ) & Contract Specification

Prepared/ Witness the trial mixed of concrete designed prior to used in concrete pouring

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Conduct Inspection on all construction works ( Precast, form-works, earthworks, Re bar installation, concreting, survey reports, manholes, duct bank & etc) perform on a continual basis for compliance with the current drawing & specification)

Material receiving Inspection of materials to be used in site

Inspection in Client Consultant

Weekly Meeting with the Client & Construction

Close out of Non Conformance Report ( NCR), INCR, Log Book Entry or Surveillance issue.

Punch list of non conformance structure prior to turn over of project 12. Position: Site Engineer

Duration: June 1, 1997 – June 2. 2007

Company: Blue Lagoon Villas / Municipality Projects Project: Bgry Roads / Residential Building

Location: Aklan

Department: Civil Engineering Dept.

Job Description & Responsibilities;

*Prepare equipment and manpower requirement for the project.

* Directly report to the Site manager

* Check drawings prior to the start of the project.

* Prepare material requirements prior to start of the project.

*Prepare weekly accomplishment report to be submitted to the site manager.

* Discuss with technical manage possible project instruction, and any work.

*Construction of Municipal Roads & Buidings

13. Position: SK Chairman

Duration: May, 1992 – May. 1994

Company: DILG

Location: Alegria Buruanga Aklan

Job Description & Responsibilities;

Attend Weekly Meeting together with Bgry Officials

Facilitate Barangay sports Fiest

Build some Project related to the youth.

EDUCATION

Education level: Bachelor’s / College Degree

Education Field: Engineering (Civil)

Course: Bachelor of Science in Civil Engineering

School/University: Garcia College of Technology

Location: Kalibo, Aklan

Date: June 1990 – March 1997

Additional Education;

School/ University: West Visayan State University – Ilo Ilo city Course : Education Unit Sponsored by DOST

Units : 9 Units

School/ University: Northwestern Visayan College – Kalibo Aklan Course : Public Administration

Units : 18 Units

SKILL YEARS OF EXPERIENCE REMARKS

Micro station design 4 yrs I have knowledge & experience AutoCAD 3 yrs

Microsoft words & excel 14 yrs

Power Point

LANGUAGE SPOKEN

English, Arabic & Tagalog

REFERENCES

ENGR. ROLLY ARA

Sta Clara International Corporation

Cel. No. 091********

Civil Superintendent

ENGR. GLENN ORDONIO

Betonbau Philippines Inc.

Cel. No. 091********

Project Manager

ENGR. WILLIAM DELA PENA

Archetype Philippines Inc

Cel. No. 092********

Senior Civil Engineer



Contact this candidate